Loading...
HomeMy WebLinkAbout83-1750 - Site PlanACCESS COVERS MUST BE WITHIN 6- OF FINISH GRADE FIRST 2' TO BE LEVEL? e GAS k/3 OUTLET D -BOX 1500 GAL SEPTIC TANK CRUSHED STONE OR COMPACTED BASE PROFILE : NOT TO SCALE p X � N q r` I I 1 � I, EXISTING WALL TOP • E_,-- L p` EXISTING DLLING x_4.5 +4.5 HYD TAG BOlfT Y,6/39 - EL -6.98 i 1 r t I t \ I y \\\\ LEWIS 1 �A\I `� POND � Aolo LO N_- r NANTUCKET SOUND LOCUS MAP E� __celpH NN 86* 4.2 m PROPOSED PATIO i PROPOSED FOUR 4.2 BEDROOM DWELLING TOF - 11.0 0 N 1+4.4 \ �1 7.508+ S'.,. 9' MINIMUM COVER �4' PERF PIPE 1 4' SOLID PIPE) 3/4' - 1 1/2' DIA 8.0 DOUBLE WASHED STONE c 7.5 40 MRL VAPOR BARRIERARRIER ADJUSTED HIGH GROUNDWATER. EL -2.5 - 18'x 34' LEACH FIELD EXISTIroo SAS +7.5 e FL 6 i- CESSPOOL SUNR00 SONO .9 rd 10' t INVERT ELEVATION 4.6 � k. I t I o tih',y1-f �- ti�`� f I 5 t 2100 W S 8 7, LEVI S_I ON CATCH BASIN RIM -3.52 ga ANE ENTIRE LOT FALLS WITHIN FLOOD ZONE Al2 (EL IO) 0 /0 20 40 I N /oG L EGEND INVERT AT BUILDING: 9.3 MIN. 2' OF INVERT IN SEPTIC TANK: 9.0 �-PEASTONE INVERT OUT SEPTIC TANK: 8.75 8.8 INVERT IN DIST. BOX: 8.5 LIGHT POST INVERT OUT DIST. BOX: 8.33 REINFORCED CONCRETE RETAINING WALL INVERT IN LEACH FIELD: 8.3 UNDERGROUND CABLEVISION LINE INVERT END LEACH FIELD: 8.0 '-5.3 BOTTOM LEACH FIELD: 7.5 PROPOSED CONTOUR BOARD OF HEALTH REGULATIONS. ADJUSTED GROUND WATER: 2.5 EFFLUENT LOADING RATE - 0.74 GPD/SF 4, ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER OBSERVED GROUND WATER: 1.7 BOTTOM OF TEST HOLE *1: -2.0 STANDING H-20 WHEEL LOADS. INDEX WELL M1W 29, ZONE A JUNE 05 READING -6.9'. ADJ-0.8' 4.6 � k. I t I o tih',y1-f �- ti�`� f I 5 t 2100 W S 8 7, LEVI S_I ON CATCH BASIN RIM -3.52 ga ANE ENTIRE LOT FALLS WITHIN FLOOD ZONE Al2 (EL IO) 0 /0 20 40 I N /oG L EGEND 13 CB CONCRETE BOUND -W- WATER L l NE Co HYDRANT -G- GAS LINE - OHW- OVER HEAD WIRES 0 LIGHT POST -E- UNDERGROUND ELECTRIC LINE -T- UNDERGROUND TELEPHONE LINE - CTV- UNDERGROUND CABLEVISION LINE -{-40.4 SPOT ELEVATION '140-- EXISTING CONTOUR 4(-01 PROPOSED CONTOUR S: DESIGN CRITERIA: GENERAL NOTES: DESIGN FLOW: 4 BEDROOMS AT 00 G.P.D. PER I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION BEDROOM EQUALS 440 G.P.D. OF THE SEWAGE DISPOSAL SYSTEM AND PERMITTING PURPOSES ONLY. NO GARBAGE GRINDER 2. VERTICAL DATUM IS NGV), FOR BENCH MARKS SEPTIC TANK REQUIRED: SET. SEE SITE PLAN. 440 G.P.D. X 200% - 880 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN. 3, ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL SOIL ABSORPTION SYSTEM REQUIRED: CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL DESIGN PERC RATE ( 5 MIN/INCH BOARD OF HEALTH REGULATIONS. SOIL TEXTURAL CLASS - ! EFFLUENT LOADING RATE - 0.74 GPD/SF 4, ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER 440 GPD / 0.74 GPD/SF - 595 S.F. REQUIRED AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH - PROVIDED: 18' x 34' LEACH FIELD. A-612 S.F. STANDING H-20 WHEEL LOADS. 612 S.F. x 0.74 - 453 GPD 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 OR APPROVED EQUAL. SOIL TES T PIT DA TA ® 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE AND WATERTIGHT. D -BOX SHALL INDICATES INDICATES PERCOLATION = OBSERVED BE WATER TESTED TO CHECK FOR LEVEL WHEN THERE TEST GROUNDWATER IS MORE THAN ONE OUTLET. TP *! 7. BEFORE CONSTRUCTION CALL *DIG -SAFE'. 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. 0- HORIZON TEXTURE COLOR4 O FOR LOCATION OF UNDERGROUND UTILITIES. A LOAMY IOYR SAND 3/3 8. SEPTIC SYSTEM INSTALLER SHALL NOTIFY THE 8 • ........................................ 3. 3 DESIGN ENGINEER TWO DAYS PRIOR TO CONSTRUCTION LOAMY IOYR B OF THE SYSTEM TO ALLOW FOR SCHEDULING OFTHE SAND 3/6 24 .......................................... 2.0 CONSTRUCTION INSPECTIONS. MEDIUM IOYR C I REMOVED SAND 5/8 9. EXISTING CESSPOOL TO BE PUMPED DRY. 28 1,7 ALONG WITH ALL CONTAMINATED SOIL AND BACKFILLS _ WITH CLEAN SAND. 10. ALL UNSUITABLE MATER14L (A d B HORIZONS) _.. .. ... ENCOUNTERED BELOW THE INVERT OF THE LEACHING FACILITY TO BE REMOVED FOR A DISTANCE 0'F 5' AROUND AND REPLACED WITH SAND IN ACCORDANCE WITH TITLE 5. 72 -2'0 Il. NO DETERMINATION HAS BEEN MADE AS TO DATE: JUNE 28. 2005 COMPLIANCE WITH DEED RESTRICTIONS OR ZONING TEST BY: STEPHEN HAAS REGULATIONS. IT SHALL REMAIN THE CLIENTS WITNESSED BY: LYNN MULKEEN RESPONSIBILITY TO OBT41N ALL PERMITS. SPECIAL PERC RATE: ( 2 MIN/INCH PERMITS, VARIANCES ETC. FOR THIS PROJECT. 12. ANY RETAINING WALL SHOWN ON THIS PLAN IS FOR LOCATION ONLY AND SHALL BE DESIGNED IN ACCORDANCE WITH STANDARD PRACTICE. 13. IT SHALL REMAIN THE CLIENT'S RESPONSIBILITY TO HAVE THE PROPOSED BUILDING FOUNDATION DESIGNED TO ACCOUNT FOR THE EXISTING GRADE AND SOIL CONDITIONS AT THE LOCATION OF THE PROPOSED BUILDING. S / TE PLA/V O/= LAIVO 28 TEL EV/S/0/V LANE. MAP /4, PARCEL 96 WES T YARMOUTH. MA . PRE -PA REO FOR: MR MRS J O /V A ND ER S O /V 496 WEYMOUTH OR / VE- WYCKOFE - /VJ 0748 / SCALE: / "- .20' JANUARY 30. 2006' EAGL-E SUF VEY I NO 1 NC , 923 ROute 6A _ �� Yarmouthport, MA. 02675 // ��� /� g �I /l,/. � ( 508 ) 362-8132 X32-5333 /�`1/ ( 508 ) C / REVISED: MARCH 13, 20064 3)�"Aleo