Loading...
HomeMy WebLinkAbout83-1757 - Boardwalk Restoration Plan9- Lx1nx0' CAP CAP BEAMS SECURED TOGETHER WITH 3/8' 0 ASTM 325 GRADE A THRU BOLTS 12' ON CENTER STAGGERED SPACING NOT TO SCALE /24 HANDRAILS % ROUT EDGES NOT TO SCALE _. 0 x 30' PERMANENT PILE —� 2x6 DECKING (EAST/ WEST ORIENTATION) 4xB STRINGER AT ED( DECKING SPACED 3/4' OFDECKING�20N5'' ON ST/WEST ORIENTATION) CENTSSTRINGER- 3 ER � 3 - 48 STRINGERS 20.5' ON CENTER W/2 - 3/4'0 THRU BOLTS AT POST CONNECTOR SECURE EACH STRINGER TO CAP BEAN WITH 3/8-GALV. L BRACKET 12' _ MAX 4' MIN. OVER MAR! -4x4 POSTS (TV)' —2x4 SIDE RAILS W/ 3/8.0 THRU BOLTS 3 - 4x8 STRINGERS 20.5' ON CENTER W/2 - 3/4.0 THRU BOLTS AT POST CONNECTOR SECURE EACH STRINGER TO CAP BEAN WITH 3/8- GALV. L BRACKET D ----8x12 GALV. STEEL PLATE BRACKET HELIX ANCHOR (WHERE NEEDED) `-2- 3/4.0 BOLTS ' — 10' 0 30' PILES 3X6 BRACING WITH 3/4' 0 BOLTS ANCHOR TYPE TO BE APPROVED BY ENGINEER 10. 0 30' PILES 48 STRINGER AT EDC OF DECKING 20.5' ON CENTER FROM NEXT STRINGER BENCH 15.5' WIDE 20.5' HIGH 2X4- 3/4' SPACING. —44 POSTS (TYP) -8 - 4xB STRINGERS 24' ON CENTER W/2 - 3/4.0 THRU BOLTS AT POST CONNECTOR SECURE EACH STRINGER TO CAP BEAM WITH 3/8' GALV, L BRACKET 602 GALV. STEEL PLATE BRACKET 2- 3/4'0 BOLTS 10' 0 30' PILES 3X6 BRACING WITH 3/4' 0 BOLTS %r Ivr 2x8 HANDRAILS ROUT EDGES 24 DECKING (EAST/ WEST ORIENTATION) 8- 48 STRINGERS 24' ON CENTER W/2 - 3/4- THRU BOLTS AT POST CONNECTOR O BENCH 15.5' WIDE I _ 20.5' HIGH SCREWED IN 4x10x20' CAP 71MBER AND PILE NOTES 1. ALL TIMBER FOUNDATION PILES SHALL BE OF TYPE 1 SPECIES LUMBER AS DEFINED N SECTION 16220 OF THE MASSACHUSETTS STATE BUILDING CODE AND SHALL CONFORM TO THE APPLICABLE PROVISIONS OF THE 'STANDARD FOR ROUND TIMBER PILES', ASTM D-25. 2 ALL TIMBER PILES SHALL BE PRESSURE TREATED WITH WATERBORNE CCA PRESERVATIVE IN ACCORDANCE WITH AWPA C3, TREATMENTS SHALT. CONFORM TO THE AWPB STANDARD MP -4. ALL PEE CUTOFFS SHALL BE TREATED IN ACCORDANCE WITH ANN STANDARD M-4. THE MINIMUM PRESERVATIVE TREATMENT RETENTION FOR TIMBER PILES AND HEAVY TIMBER SHALL BE 25 PCF 3. BEFORE ANY TREATED PILES ARE DRIVEN, A CERTIFICATION SHALL BE SUBMITTED, CERTIFYING THAT THE PILES WERE FREE FROM DECAY, WERE PROPERLY PEELED AND OTHERWISE PREPARED BEFORE TREATMENT, AND THE METHOD OF TREATMENT, THE CHEMICAL COMPOSITION AND THE AMOUNT OF RETENTION OF THE PRESERVATIVE CONFORM TO THE REQUIREMENTS SPECIFIED HEREIN. THE PRESERVATIVE RETENTION SHALL BE DETERMINED BY ASSAY METHOD. 4. PILES SHALL BE 800 PSI MINIMUM COMPRESSIVE STRENGTH PARALLEL TO GRAIN AND SHALL MEASURE AT LEAST TEN INCHES (101 IN DIAMETER AT THE TIP. 5. EACH PILE SPLICE SHALL BE A MINIMUM OF 2' IN LENGTH INCLUDING THE OVERLAP AREA AND SECURED WITH 2- 3/4' 0 GALV. THRU BOLTS TO BE SPACED NOT LESS THAN 4' APART AND NO LASER THAN 3' TO THE EDGE OF THE OVERLAP. SPECIAL REQUIREMENTS FOR COASTAL CONSTRUCTION 1. SPECIAL PROVISIONS FOR COASTAL CONSTRUCTION SHALL BE IN ACCORDANCE NTH THE RECOMMENDATIONS FOUND IN THE 'COASTAL CONSTRUCTION! MANUAL' AS PUBLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA -55} 2. ALL STEEL MEMBERS CONNECTIONS, CONNECTORS, ETC. SHALL BE HOT DIPPED GALVANIZED AFTER FABRICATION. ALL METAL CONNECTORS MUST BE ROUTINELY INSPECTED AND MAINTAINED OVER THE SERVICEABLE LIFE OF THE STRUCTURE. GENERAL NOTES 1. SUPPLY ALL MATERIAL,-EQUIPNFNT AND LABOR FOR CONSTRUCTION OF PERMANENT PIER, RAMP, AND FLOAT AS DESCRIBED AND SHOWN ON PIAN AND DETAILS. 2. ALL WORK TO BE PERFORMED IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS AND THE ORDER OF CONDITIONS ISSUED BY THE YARMOUTH CONSERVATION COMMISSION. 3. ACCESS TO BE FROM THE PATH ON THE APPUCANTS PROPERTY, OR FROM WORKING BARGE. WORKING BARGE NOT TO BE LOCATED OVER MARSH AT ANY TIME STAGING AREA FOR MATERIALS TO BE IN THE APPUCANT'S DRIVEWAY. 4, METAL TO BE HOT DIPPED GALVANIZED AFTER FABRICATION. TIMBER IN CONTACT WITH GROUND AND UNDER WATER TO BE CCA PRESSURE, TREATED IN ACCORDANCE WITH WOOD PRESERVATIVE INSTITUTE OF AMERICA ALL OTHER TIMBER TO BE ACO TREATED, OR OTHER ROT -RESISTANT LUMBER TYPE 5. NO MACHINERY OR EQUIPMENT TO OPERATE N THE MARSH. 6. CONSTRUCTION DETAILS TO BE APPROVED BY ENGINEER PRIOR TO CONSTRUCTION. 7. MINIMUM SPACE BETWEEN ALL DECK PLANKING TO BE 3/4, WITH PLANKING ORIENTED NORTH -SOUTH. NEW f0' 0 PILE 2- 3/4'0 BOLTS TYPICAL SHIP LAP SPLICE —EXISTING 10' 0 PILE BDENNIS BOARDWALK / o >7 0 KEY MAP NO SCALE (M STREET o PLAN REFERENCES: ASSESSORS MAP 148, PARCEL 2 PLAN BOOK 289, PAGE 72 FLOOD NOTE: FLOOD ZONE A5 AS SHOWN ON FEMA FIRM PANEL M0015 0001 D REVISED JULY $ 1992 DATUM NOTE: ELEVATIONS SHOWN HEREON ARE BASED ON THE NATIONAL GEODETIC VERTICAL DATUM (NGVD) AS SHOWN ON TOWN OF YARMOUTH GIS RECORD PLOTS MHW = 5.3' f LEGEND EXIS NG -o- UTILITY POLE \1I1, MARSH WETLAND FLAG —...— MLW 2 CONTOUR UNE E>4S11NG BOARDWALK REFERENCE PERMITS.- DPW ERM1TS: DPW LIC. 3683, 9-24-56 DEQE LIC. 760 9-4-67 DPW WATERWAYS CONTRACT 1974 CPW WATERWAYS CONTRACT 1602 ARMY CORPS OF ENGINEERS PERMIT MA-DENN-81-076 MA OASTAL NCiINEEMG OMPANY, INC. 260 Cranberry Hwy. Orleans, MA 02653 508.255.6511 Fax: 508.255.6700 a SEAL O O a 0M0 ✓'� MLI ° �0 0 3 a x r` o v Ib Z Cxl � F m F�zW4r F w x C7 U cn SCALE AS NOTED DRAWING FILE C16593.dwg DATE OS -24-O6 DRAWN BY SHB REO CHECKEDBY REO 0 0 N V U M�i W' OF -L SHEETS c I PROJECT NO. C16593 U