Loading...
HomeMy WebLinkAbout83-1771 - Site PlanR_ l� ! P � " i GO<ciS /1.7f9/� f" � 2000' z I gA pA�L� - ' i.� MG7/vner70E L.oGooiv if /�/\//�/) 1� - _I e �Y\ SMO ✓E Er/ST/f/ G (T) On L rvfai L / 1 .gr»Hw=2.8 :n - E Y/ 7-1 /v mo/ZT.v.eE0 -51 STO•vE Fc'E✓ET/I'iEN T •c o fo Lo 3 o CONSTRUCTION NOTES 4 1. ELEVATIONS REFER TO NGVD. ELEVATION BENCH MARK IS THE CORNER OF THE TIMBER PLATFORM WHERE SHOWN. TRANSFER ELEVATION PRIOR TO C REMOVING THE PLATFORM TO DO THE WORK CONTACT CAPE COD CQ ENGINEERING, INC FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED. t V N �F/V !' T4' S 6�i'/ S"T/ N G �, - 2. LOCUS: SNUG HARBOR ROAD, MAP91, PARCEL 196 3. PIAN REFERENCE. LCP 17802, LOT 77: DEP WATERWAYS LICENCE PLAN 43412 J GrNCRFTE .C'FT• �'LA[L U Z 4, CONSTRUCTION ACCESS SHALL BE DIRECTLY FROM SNUG HARBOR ROAD. lL QN S. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE STONE ARRAY. EQUIPMENT AND MATERIAIS IN 20 CY W HANDLING SHALL BE IN ACCORDANCE WITH THE RESULTING ORDER OF A j lz Q CONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION NDORO ' h 6. A WORK LIMB I'M SHALL BE STAKED, FLAGGED TO PREVENT ANY ACTY 4 SOUTH OF THE EXISTING RR - RAP WITH NO RELATED ACTIVITY OCCURRING 0 BEYOND THE WORK LIMIT. L N , _ 7. ALL ARMOR STONE AND GAMICREDDING R FNE SHALT. BE SI CLEAN AY. RF TSE < 'C /- /.' CPO SED T:^ �\/ FREE OF ANY DEBRIS, ORGANICS OR FINES SUCH AS SILT OR CLAY. RE -CSE �� ANY FXISTINGSTONES MEETING PROPOSED SPECTIONS. - r4 EXISTING CONCRETE SEGMENTS AND OTHER DEBRIS SHALL B REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH SOLID WASTE srn HANDLING REGULATIONS 9. FILTER CLOTH SHALL BE MIRAFI 6WX OR EQUA40NE LAYER W/MTN.4 FT. ]]*',: •! OVERLAP. ,S S ♦ R/ p _/+� ? 10. BEDDING STONE SHALL BE OF GRANITIC STONE, I TO B INCHES DIAMETER A �� 15 //L>/J !� <".? MIYIMUM OF 1 FT. THCK LAYER - \; It. ARMOR STONES SHALL BE OF NATIVE GRANITE BOULDERS AS SPECIFIED FOR - �' C ` • ` D -- - �'�-/ O/3 ,j WEIGHT ON TO: TYPICAL PROFILE DETAIL SELECT PRIMARILY UNIFORM, - 1, p• (NON-FFONGATEDIANGLIARSTONESFIAPES PLACESTONESFOR MAXTMM STABILITY SUBJECT TO REVIEW AND INSPECTION BY GPE COD p� TO FIn E F-✓�S%. �C"/GRFTf_' L�e�/�LL ^C E1= -d' ENC7.YE£l/Vf,ryCALL ARMORSTONTSSHALL FTRMLYCONTACTTIH BED STALLS AND Al S ARMOR 0.5Fr.STONES DIRECTLY ADJACENT. FACE ROUGHNESS V- S SHALL BE L A SCALE S 83 ET. 4 CSFE PR 0,-/4 E , j) I 12. INCIDENTAL GAPS AND SPACES WITHIN T LIR. ARMOR STONE FACE SHALL T FILLED AND FITTED (CIHDOED) RTTH THE LARGEST STONE TAILINGS THAT z p CAN BE HAND FITTED TO EACH SPACE: APPROX.6 INCH TO 12 INC[[ ANGULAR STONE NO DUMPING OF STONE CHIPS ONTO TRE STONE FACE WILL BE - /O' PERNTiTFD. - Q F, 1,2- Il AT THE LOCATION WHERE THE TREES ARE AFFECTED, SHORE JUNT"F- NORTHERN BAYBERRY, AND BEACH PLUM SHALL BE PLANTED TO : RF:VEGETATE THF. SPECIFIC SHOULDER AND BANK AREA L LOLRBFD EARTH AREAS NRER EONEW SPE AREA ABOVE COMPLETED STONE ON THE SANK SHALL BE INTT:NSnTLY ( 12 -O-C.) PLANTED WITH AMERICAN BEACH GRASS AND J pOlnTER COASTAL HARDY GRASSE& I IS REMAINING EXCESS BOULDERS A!ND BEDDING STONE SHUL B REMOVED /.;,,P O FROM THE AREA UPON COMPLETION. R IS ADVISED TO CONTAIN CHIPS AND ��1 C: BEDDING MATERIAL DLIUNGTHE WORK EFFORT WITH A STEEL BIN OR OTHER SUITABLE CONTAINMENT DEVICE. IL EXISTING PLATFORM AND RAMP SHALL BE REMOVED AS NEEDED i 1 i POSTSTEMPORARILY FOR NEW STONE FACEEFFORT. REQUIRED FOR PROPERPLATFORM POST'S OVER THE NEW STONE FACE IS REQUIRED FOR PROPER u�nmIOSTAEOR TO EINCTH PLATFORM OCATIONSS. APPROPRIATE CPCOD EENGGMRENG E FACE. 17. TICE ACCEFOR ATTACHMENT S ROUTE AND WORK STTE SSTIONS AL L BE CLEAANED AND RESTORED TO - RESEMBLE THE PRE-CONSTRUCITON CONTOUR AND CONDTITON. STONES FOR THE WORK SHALL BE INDIVIDUALLY LADED FROM TIM DELIVERY VEHICLE TO THE BANK THERE SHALL BE NO DUMPING OF AW MATERIAL t ANYRHERE NEAR TIFE STREET PAVEMENT. 16. CONTRACTOR SHALL OBTAIN AND LEEP ONSITE A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH CONSFRVATON V /2En1 fI CE/� Iti, NE1'V COMMISSION. — j NO >ti�r'/r fc Pn CF -'O sFU f 1 i I_�-fr c/TH OF TN/S L/NE (/•'I) To PGCTFCT s//GT /�>/?xt tf/ fT�fo �sr TOPOGRAPHIC SITE PLAN SHOWING PROPOSED BANK STABILIZING MEASURES k// f AT 2 SNUG HARBOR DRIVE SOUTH YARMOUTH, MA ' ,"-=_•:�. ASSESSORS' MAP 91,PARCEL 196 aLjH OF 14gSSgC PREPARED FOR ROBERT yON RAY LAWTON /o OCTOBER 25, 2006 SCALE - 1" =10' PERRY GIVI PREPARED BY �0 0• o CAPE COD ENGINEERING, INC. I TV- a���' ROBERT NL PERRY, PE AI E P.O. BOX 1517 J EAST DEN -IS, MA 02641 TEL - 508-385-1445