HomeMy WebLinkAbout83-1771 - Site Plan 2Gc _c-TG�vE' /'FYFT/+�EJv
7-
-4 J
C
3 �xD
p�
C
� TD RF/�1ACE F.1 -QST. Car�C .FTE_ 1ni/SLG
I /?NG SI,%ALL F/j, �-rci•.�E /"/P ��?�f'
<FE' G/'
2oI
,si
51
a
ty
i
I
n7,�i,vn,f70£ L.nc non/
O/L!Y/S///b C'uG
c?C'�
C nE< 6* C
Q /�R [•n _^SED � r�.vg
/'E vETmF/v T
C`In
I
i
`
P)P
GOcuS h'7A, '--
„i
1.
ELEVATIONS REFER TO NGVD. ELEVATION BENCH MARK IS THE CORNER OF
//
THE TIMBER PLATFORM WHERE SHOWN. TRANSFER ELEVATION PRIOR TO
REMOVING THE PLATFORM TO DO THE WORK. CONTACT CAPE COD
ENGINEERING, INC. FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED.
I.
LOCUS: SNUG HARBOR ROAD, MAP 91, PARCEL 1%
J.
PIAN REFERENCE: LCT 17WZ LOT 77; DEP WATERWAYS LIM,'CE PLAN MM1I
6.
CONSTRUCTION ACCESS SHALL BE DIRECTLY FROM SNUG HARBOR ROAD.
- S.
"IE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH
THE INSTALLATION OFTIrE STONE ARRAY. EQUIPMENT AND MATERIALS
HANDLING SHALL BE IN ACCORDANCE WITH THE RESULTING ORDER OF
CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION
' ALRIIORTFTM -
6.
A WORK LIMIT SHALL BE STAKED, FLAGGED TO PREVENT ANY ACTIVITY
SOUTH OF THE EXISTING RIP -RAP WITH NO RELATED ACTIVITY OCCURRING
BEYOND THE WORK LUHIT.
7.
ALL ARMOR STONE. AND BEDDING STONE SHALL BE OF CLEAN COMPOSITION,
FREE OF ANY DEBRIS, ORGANICS OR FINES SUCH AS SILT OR CLAY. RE -USE
ANY EXISTING STONES MEETING PROPOSED SPECIFICATIONS.
S.
EXISTING CONCRETE SEGMENTS AND OTHER DEBRIS SHALL BE REMOVED
FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH SOLID WASTE
HANDLING REGULATIONS
9.
FILTER CLOTH SHALL BE MIRAFI 600X OR EQUAI� ONE LAYER WI MIN, 6 FT.
/19f?nur+.00E C�GOON
OVERLAP. .-
HL
BEDDLNGSTONESIL4LILBEOFGRA-*4MCSTONE,4TOBLNCHPSDIAMETERA
MINIMUM OF I FT. TICK LAYER
T[OnIL
[
C )
ARMOR STONES SHALL BE OFNATTVE GRANITE BOULDERS AS SPECIFIED FOR
WEIGHT ON THE TYPICAL PROFILE DETAIL SELECT PRIMARILY UNIFORM,
(NON-ELONGATED) ANGULAR STONE SHAPES. PLACESTONESFOR
MAXIMUM STABILITY SUBJECT TO REVIEW AND INSPECTION BY CAPE COD
ENGINEERING, INC ALL ARMOR STONES SHALL. FIRMLY CONTACT THE BED
STONES ANDALL ARMOR STONES DIRECTLY ADJACENT. FACE ROUGHNESS
SHALL BE ON A SCALE OF SS FT.
12.
INCIDENTAL CAPS AND SPACES WTIRLN THE ARM(;R STONE FACE SHALL BE
'FILLED AND MTED (CHINKED) WITH TILE LARGEST STONE TAILINGS THAT
CAN BE MIND FITTED TO EACH SPACE: APPROX.6 INCH TO 12 INCH ANG LIAR
'
STONE NO DUMPING OF STONE CHIPS ONTO THE STONE FACE WILL BE
PERMITTED. q.
_lS
' 'oil
NORTHERN BAYBERRY, AND BEACH PLUM SHALL, HE PLANTED TO
REVEGETA'TE THE SPECIFIC SHOULDER AND BANK AREA
IC
OTHER DISTURBED EARTH AREAS NEARER TO THE PLATFORM AND NEW
SLOPE AREA ABOVE THE COMPLETED STONE ARRAY ON TIE BANK SHALL RE
LYFENSIVELY (12.O.GI PLANTED WITH AMERICAN BEACH GRASS AND
OTHER COASTAL HARDY GRASSES - -
1S
REMAINING EXCESS BOULDERS AND BEDDING STONE SHALL BE REMOVED
Lf]NQIYF op Tn£
FROM THE AREA UPON COMPLETION. IT IS ADVISED TO CONTAIN CHIPS AND
BEDDING MATERIAL DURING THE WORK EFFORT WITH A STEEL BUN OR
- ; LCC/J TiCN
OTHER SUITABLE CONTAINMENT DEVICE. -
14L
EXISTING PLATFORM AND RAMP SHALL BE REMOVED AS NEEDED
\ to S SNC +vw
TEMPORARILY FOR THE WORK EFFORT. REFITTING OF THE PLATFORM -
POSTS OVER THE NEW STONE FACE IS REQUIRED FOR PROPER
(
REPLACEMENT. PROVIDE APPROPRIATE. SKILLED LABOR TO ACCOMPLISH
THE PLATFORM MODIFICATIONS CONSULT CAPE COD ENGINEERING, INC
�JNO n-crr [c �a ePOsFp
FOR ATTACHMENT DESIGN OPTIONS FOR TIE STONE FACE
H7.
THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO
so �T-f/ of rvir .0-LivE
RESEMBLE T T, PRE -CONSTRUCTION CONTOUR AND CONDITION, STONES
i
i
To ARCTECT s -/71 -7-
-/7GTPv
VEHICLE TO THE BANK THERE SHALL BE NO DUMPING OF ANY MATERIAL
ANYWHERE NEAR THE STREET PAVEMENT. -
IB.
CONTRACTOR SHALL OBTAIN AND KEEP ONSITE A COPY OF THE ORDER OF
CONDITIONS ISSUED FOR THE PROJECT BY THE YAP -MOUTH CONSERVATION
"'47 -
COMMISSION.,.
//r
IV
v
2oI
,si
51
a
ty
i
I
n7,�i,vn,f70£ L.nc non/
O/L!Y/S///b C'uG
c?C'�
C nE< 6* C
Q /�R [•n _^SED � r�.vg
/'E vETmF/v T
C`In
I
i
`
P)P
GOcuS h'7A, '--
TOPOGRAPHIC SITE PLAN SHOWING
PROPOSED BANK STABILIZING MEASURES
AT ,
SNUG HARBOR DRIVE
SOUTH YARMOUTH, MA
ASSESSORS' MAP 91, PARCFL 196
PREPARED FOR -
RAY LANVTON
OCTOBER 25, 2006 SCALE - 1" -10'
PREPARED BY
CAPE COD ENGINEERING, INC,
ROBERT M. PERRY, PE
P.O. BOX 1517;
EAST DENNIS, MA 02641
TEL - 508-385-1445
I
CONSTRUCTION NOTES
1.
ELEVATIONS REFER TO NGVD. ELEVATION BENCH MARK IS THE CORNER OF
THE TIMBER PLATFORM WHERE SHOWN. TRANSFER ELEVATION PRIOR TO
REMOVING THE PLATFORM TO DO THE WORK. CONTACT CAPE COD
ENGINEERING, INC. FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED.
I.
LOCUS: SNUG HARBOR ROAD, MAP 91, PARCEL 1%
J.
PIAN REFERENCE: LCT 17WZ LOT 77; DEP WATERWAYS LIM,'CE PLAN MM1I
6.
CONSTRUCTION ACCESS SHALL BE DIRECTLY FROM SNUG HARBOR ROAD.
- S.
"IE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH
THE INSTALLATION OFTIrE STONE ARRAY. EQUIPMENT AND MATERIALS
HANDLING SHALL BE IN ACCORDANCE WITH THE RESULTING ORDER OF
CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION
' ALRIIORTFTM -
6.
A WORK LIMIT SHALL BE STAKED, FLAGGED TO PREVENT ANY ACTIVITY
SOUTH OF THE EXISTING RIP -RAP WITH NO RELATED ACTIVITY OCCURRING
BEYOND THE WORK LUHIT.
7.
ALL ARMOR STONE. AND BEDDING STONE SHALL BE OF CLEAN COMPOSITION,
FREE OF ANY DEBRIS, ORGANICS OR FINES SUCH AS SILT OR CLAY. RE -USE
ANY EXISTING STONES MEETING PROPOSED SPECIFICATIONS.
S.
EXISTING CONCRETE SEGMENTS AND OTHER DEBRIS SHALL BE REMOVED
FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH SOLID WASTE
HANDLING REGULATIONS
9.
FILTER CLOTH SHALL BE MIRAFI 600X OR EQUAI� ONE LAYER WI MIN, 6 FT.
/19f?nur+.00E C�GOON
OVERLAP. .-
HL
BEDDLNGSTONESIL4LILBEOFGRA-*4MCSTONE,4TOBLNCHPSDIAMETERA
MINIMUM OF I FT. TICK LAYER
T[OnIL
[
C )
ARMOR STONES SHALL BE OFNATTVE GRANITE BOULDERS AS SPECIFIED FOR
WEIGHT ON THE TYPICAL PROFILE DETAIL SELECT PRIMARILY UNIFORM,
(NON-ELONGATED) ANGULAR STONE SHAPES. PLACESTONESFOR
MAXIMUM STABILITY SUBJECT TO REVIEW AND INSPECTION BY CAPE COD
ENGINEERING, INC ALL ARMOR STONES SHALL. FIRMLY CONTACT THE BED
STONES ANDALL ARMOR STONES DIRECTLY ADJACENT. FACE ROUGHNESS
SHALL BE ON A SCALE OF SS FT.
12.
INCIDENTAL CAPS AND SPACES WTIRLN THE ARM(;R STONE FACE SHALL BE
'FILLED AND MTED (CHINKED) WITH TILE LARGEST STONE TAILINGS THAT
CAN BE MIND FITTED TO EACH SPACE: APPROX.6 INCH TO 12 INCH ANG LIAR
'
STONE NO DUMPING OF STONE CHIPS ONTO THE STONE FACE WILL BE
PERMITTED. q.
_lS
AT THE LOCATION WHERE THE TREES ARE AFFECTED, SHORE JUNIPER,
NORTHERN BAYBERRY, AND BEACH PLUM SHALL, HE PLANTED TO
REVEGETA'TE THE SPECIFIC SHOULDER AND BANK AREA
IC
OTHER DISTURBED EARTH AREAS NEARER TO THE PLATFORM AND NEW
SLOPE AREA ABOVE THE COMPLETED STONE ARRAY ON TIE BANK SHALL RE
LYFENSIVELY (12.O.GI PLANTED WITH AMERICAN BEACH GRASS AND
OTHER COASTAL HARDY GRASSES - -
1S
REMAINING EXCESS BOULDERS AND BEDDING STONE SHALL BE REMOVED
FROM THE AREA UPON COMPLETION. IT IS ADVISED TO CONTAIN CHIPS AND
BEDDING MATERIAL DURING THE WORK EFFORT WITH A STEEL BUN OR
OTHER SUITABLE CONTAINMENT DEVICE. -
14L
EXISTING PLATFORM AND RAMP SHALL BE REMOVED AS NEEDED
'
TEMPORARILY FOR THE WORK EFFORT. REFITTING OF THE PLATFORM -
POSTS OVER THE NEW STONE FACE IS REQUIRED FOR PROPER
REPLACEMENT. PROVIDE APPROPRIATE. SKILLED LABOR TO ACCOMPLISH
THE PLATFORM MODIFICATIONS CONSULT CAPE COD ENGINEERING, INC
FOR ATTACHMENT DESIGN OPTIONS FOR TIE STONE FACE
H7.
THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO
RESEMBLE T T, PRE -CONSTRUCTION CONTOUR AND CONDITION, STONES
FOR THE WORK SHALL BE INDHVTDUALLY LADED FROM THE DEI.IVERY
VEHICLE TO THE BANK THERE SHALL BE NO DUMPING OF ANY MATERIAL
ANYWHERE NEAR THE STREET PAVEMENT. -
IB.
CONTRACTOR SHALL OBTAIN AND KEEP ONSITE A COPY OF THE ORDER OF
CONDITIONS ISSUED FOR THE PROJECT BY THE YAP -MOUTH CONSERVATION
COMMISSION.,.
TOPOGRAPHIC SITE PLAN SHOWING
PROPOSED BANK STABILIZING MEASURES
AT ,
SNUG HARBOR DRIVE
SOUTH YARMOUTH, MA
ASSESSORS' MAP 91, PARCFL 196
PREPARED FOR -
RAY LANVTON
OCTOBER 25, 2006 SCALE - 1" -10'
PREPARED BY
CAPE COD ENGINEERING, INC,
ROBERT M. PERRY, PE
P.O. BOX 1517;
EAST DENNIS, MA 02641
TEL - 508-385-1445
I