Loading...
HomeMy WebLinkAbout83-1793 - 6 - Details 3SYSTEM ELEVATIONS INFILTRATION BASIN BASIN #1 BASIN #2 BASIN #3 NO. OF GALLEYS 1UL/65C 4E/4C 2E GALLEY TOP 12.95 12.95 12.95 DIA./INVERT IN DIA./INVERT OUT 12" 9.64 12" 11.10 8' 11.19 6 11.78 8' /10.70 NO OUTLET GALLEY BOTTOM 8.7 8.7 8.7 4'-6" FRONT VIEW Tj-----------1--n II II u I I 0 0 0 0 I•' FLOW p I I II SLOPE W II II � II I II a 0 II � I j II � II 0 0 II II 0 0 (I 20" DIAMETER II II 000a o II CLEANOUT COVER II II N0. I , U_T—I—T—i--r —I— -T r—� I 4'-6" FRONT VIEW FRONT VIEW BITUMINOUS CONCRETE - (2" BASE, 1" TOP) 16" OF 85t COMPACTED GRAVEL —\ FINISH GRADE MATCH EXISTING—., No. 410 FILTER FABRIC GALLEY TOP �\ ✓ ` 1 r' GALLEY INV. I CRUSHED STONE (TYPE 7) I SHEA GALLEY 1 GALLEY BOTTOM ESTIMATED SEASONAL_ 1 HIGH GROUNDWATER CRUSHED STONE (TYPE 7) �f SHEA GALLEY MODEL LE-EGH ON ENDS & MODEL LE-CGH FOR CENTER SECTIONS No. 410 FILTER FABRIC OR APPROVED EQUAL TOP, BOTTOM & SIDES 4'-0" (TYP) NOTE: TOTAL OF 16 GALLEY END (E) SECTIONS & 69 GALLEY CENTER (C) SECTIONS. a 0 0 0 0 I•' FLOW a SLOPE W - a 0 0 0 0 0 0 0 0 000a o FLOW N0. I , r — ;I r—� I 0 0 0 FRONT VIEW BITUMINOUS CONCRETE - (2" BASE, 1" TOP) 16" OF 85t COMPACTED GRAVEL —\ FINISH GRADE MATCH EXISTING—., No. 410 FILTER FABRIC GALLEY TOP �\ ✓ ` 1 r' GALLEY INV. I CRUSHED STONE (TYPE 7) I SHEA GALLEY 1 GALLEY BOTTOM ESTIMATED SEASONAL_ 1 HIGH GROUNDWATER CRUSHED STONE (TYPE 7) �f SHEA GALLEY MODEL LE-EGH ON ENDS & MODEL LE-CGH FOR CENTER SECTIONS No. 410 FILTER FABRIC OR APPROVED EQUAL TOP, BOTTOM & SIDES 4'-0" (TYP) NOTE: TOTAL OF 16 GALLEY END (E) SECTIONS & 69 GALLEY CENTER (C) SECTIONS. 3" 4'-0" HOLES 6"x4" TO 5"x2" TAPER SIDE VIEW 6" S-0" 0 0 0 0 I•' FLOW 3 SLOPE W - a 06/06/07 0 00000 cn 04/04/07 w _ 0 DRAWN BY: HMC CHECKED BY: MJC o FLOW N0. I , r — ;I r—� I 0 0 0 0 I f--- I I I I I 0 0 _ I r T I 0 0 0 0 0 _ I 3" 4'-0" HOLES 6"x4" TO 5"x2" TAPER SIDE VIEW 6" S-0" CONSERVA77ON COMMENTS FLOW 3 SLOPE W - a 06/06/07 0 HMC cn 04/04/07 w HMC 0 DRAWN BY: HMC CHECKED BY: MJC o FLOW N0. I , r — ;I r—� I I L�J I I I f--- I I I I I I I I _ I r T I r—� I LOJ L�J 4'-0" L 4'-6" BACK VIEW PAVED AREN GRASS AREA ��rJVAVAVIVAVA�IVIVNAVAVIVAVAVIVA�AVA� LOAM AND SEED MINIMUM COVER TYPE 1- COMMON BORROW) OR H-10 LOADING SECTION B -B NOTE 1. PRECAST CONCRETE GALLEYS TO BE SHEA LE-EGH & LE-CGH APPROVED EQUAL. 2. ACTUAL LOCATION AND CONFIGURATION OF GALLEYS MAY BE ALTERED IN THE FIELD BASED ON AS -BUILT GRADING, UTILITY LOCATIONS, ETC. INFILTRATION SYSTEM SECTIONS & ELEVATIONS NOT TO SCALE 0 w a U_ z < w 00 O v I bi w a 6" LOAM AND SEED SEE DETAIL BELOW 9" MINIMUM COVER FOR H-10 LOADING 4.25 FT. �i-0i-00_4-_• on •.11 MKIK1191 1002" MP STRAP EXPANSION RESTRAINT (1/4" NYLON ROPE 2" FLAT WASHERS) SILTSACK BY ATLANTIC CONSTRUCTION FABRICS, INC. OR APPROVED EQUAL. SI LTSACK DETAIL N.T.S. BEDDING DETAIL GROUND a 0 J F � zo w Y o CATCH BASIN (SEE DETAIL) FACE 2 DUMP STRAPS EACH BAG DETAIL N.T.S. SUMP (SEE CB DETAIL) SILT SACK INSTALLATION DETAIL N.T.S. ANGLE FIRST STAKE TOWARD PREVIOUSLY LAID BALE. FLOW \ PLAN S-0" u '-BOUND BALES PLACED ON CONTOUR 2 REBARS, STEEL PICKETS, OR 2"x2 STAKES 1 1/2' TO 2 IN GROUND. DRIVE FLUSH WITH BALES. ANCHORING DETAIL 3AKED HAY OR STRAW. AIN. SIZE SHALL BE 36" x 18" x 24" SILT FENCE - 1" x 1" x 48" OAK STAKES PER BALE (MIN.) )R EQUIVALENT SIZE SAPLINGS 1:71 stal fid. N 1" x 1" OAK STAKES 2 - 1" x 1" x 48" OAK STAKES PER BALE (MIN.) OR EQUIVALENT SIZE SAPLINGS SILT FENCE (EMBEDDED IN GROUND) BALED HAY OR STRAW /-GROUND m I 4" 'i' '';' 6„ FLOW �f V-0" MIN. SILT FENCE & HAY BALE DETAIL N.T.S. CONSTRUCTION SPECIFICATIONS: 1. HAY BALES SHALL BE PLACED AROUND NEWLY INSTALLED CATCH BASINS AND DROP INLETS (WHERE REQUIRED) TO PREVENT SEDIMENTATION AND OTHER DEBRIS FROM ACCUMULATING ON THE GRATE OR IN THE SUMP. HAY BALES SHOULD BE KEPT CLEAN AND FREE OF DEBRIS TO FACILITATE FLOW. 2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF 4 INCHES, AND PLACED SO THE BINDINGS ARE HORIZONTAL. 3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY EITHER TWO STAKES OR OR REBARS DRIVEN THROUGH THE BALE. THE FIRST STAKE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE AT AN ANGLE TO FORCE THE BALES TOGETHER. STAKES SHALL BE DRIVEN FLUSH WITH THE BALE. 4. INSPECTION SHALL BE FREQUENT AND REPAIR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. 5. BALES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFULNESS SO AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE. HAY BALE NOTES r 0 i GENERAL THIS PLAN PROPOSES EROSION CONTROL MEASURES TO ADEQUATELY CONTROL ACCELERATED SEDIMENTATION AND REDUCE THE DANGER FROM STORM WATER RUNOFF AT THE SITE. THE RUNOFF SHALL BE CONTROLLED BY THE INTERCEPTION, DIVERSION, AND SAFE DISPOSAL OF PRECIPITATION. RUNOFF SHALL ALSO BE CONTROLLED BY STAGING CONSTRUCTION ACTIVITY AND PRESERVING NATURAL VEGETATION WHEREVER POSSIBLE. EXISTING VEGETATION SHALL BE PROTECTED AND ONLY THAT CLEARING AND GRUBBING ABSOLUTELY NECESSARY TO THE PROPOSED CONSTRUCTION SHALL BE PERFORMED. ALL DISTURBED AREAS SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AND CONTOUR, UNLESS OTHERWISE INDICATED ON THE PLANS. THE CONTRACTOR SHALL TAKE SPECIAL CARE WITH HIS CONSTRUCTION METHODS AND SHALL COMPLY WITH THE FOLLOWING GUIDELINES. SEDIMENTATION CONTROL ALL AREAS SHALL BE PROTECTED FORM SEDIMENTATION DURING AND AFTER CONSTRUCTION, PARTICULARLY THE STORAGE OF EXCAVATED OR STOCKPILED MATERIAL. THE CONTRACTOR SHALL CAREFULLY STRIP ALL TOPSOIL, LOAM, OR ORGANIC MATTER PRIOR TO THE TRENCHING OR OTHER OPERATIONS AND SHALL STORE THEM SEPARATELY FROM ALL OTHER MATERIALS DURING EXCAVATION. EACH STOCKPILE MUST BE ADEQUATELY RINGED WITH SEDIMENT CONTROL MATERIAL (i.e., HAY BALES AND/OR FILTER FABRIC FENCE). DEBRIS AND OTHER WASTE RESULTING FROM EQUIPMENT MAINTENANCE AND CONSTRUCTION WILL NOT BE DISCARDED ON SITE. STABILIZING OF SLOPES SHALL BE DONE IMMEDIATELY AFTER CONSTRUCTION OF SLOPES. SLOPES STEEPER THAN 4:1 SHALL BE PROTECTED WITH EROSION MATS. THESE MATS ARE MANUFACTURED COMBINATIONS OF MULCH AND NETTING AND SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. ALL OTHER AREAS SHALL BE MULCHED WITH HAY OR STRAW AT A RATE OF 1.5 TO 2 TONS PER ACRE. STRAW OR HAY MULCH MUST BE ANCHORED IMMEDIATELY AFTER SPREADING TO PREVENT WINDBLOWING. EROSION AND SEDIMENTATION CONTROL PLAN SEDIMENTATION CONTROL SYSTEM - THE SEDIMENTATION CONTROL SYSTEM SHALL CONSIST OF HAY BALES WITH FILTER FABRIC BARRIER FENCE. THE SEDIMENTATION CONTROL SYSTEM SHALL BE INSTALLED BEFORE ANY CONSTRUCTION BEGINS AS INDICATED ON THE PLANS. DESIGN THE SYSTEM TO INTERCEPT SILT AND SEDIMENT BEFORE IT REACHES THE WETLANDS OR WATERCOURSES. DEPOSITS OF SEDIMENT AND SILT ARE TO BE PERIODICALLY REMOVED FROM THE UPSTREAM SIDE OF THE FENCE. THIS MATERIAL IS TO BE SPREAD AND STABILIZED IN AREAS NOT SUBJECT TO EROSION, OR IN AREAS WHICH ARE NOT TO BE PAVED OR BUILT ON. THE SEDIMENTATION CONTROL SYSTEM IS TO BE REPLACED AS NECESSARY TO PROVIDE PROPER FILTERING ACTION. THE SYSTEM IS TO REMAIN IN PLACE AND BE MAINTAINED TO INSURE EFFICIENT SILTATION CONTROL UNTIL ALL AREAS ABOVE THE FENCE ARE STABILIZED AND VEGETATION HAS BEEN ESTABLISHED. SILT SACKS - SILT SACKS SHALL BE INSTALLED AT ALL CATCH BASINS WHERE SEDIMENT MAY ENTER THE CATCH BASIN OR AS DIRECTED BY THE RESIDENT ENGINEER. DEPOSITS OF SEDIMENT AND SILT ARE TO BE PERIODICALLY REMOVED FROM THE SILT SACKS. THIS MATERIAL IS TO BE SPREAD AND STABILIZED IN AREAS NOT SUBJECT TO EROSION, OR IN AREAS WHICH ARE NOT TO BE PAVED OR BUILT ON. SILT SACKS ARE TO BE REPLACED AS NECESSARY TO PROVIDE PROPER FILTERING ACTION. THE SYSTEM IS TO REMAIN IN PLACE AND BE MAINTAINED TO INSURE EFFICIENT SILTATION CONTROL UNTIL ALL AREAS ABOVE THE EROSION CHECKS ARE STABILIZED AND VEGETATION HAS BEEN ESTABLISHED. IN ALL AREAS, REMOVAL OF TREES, BUSHES, AND OTHER VEGETATION, AND DISTURBANCE TO THE SOIL, IS TO BE KEPT TO AN ABSOLUTE MINIMUM WHILE ALLOWING PROPER DEVELOPMENT OF THE SITE. EROSION AND SEDIMENT CONTROL MAINTENANCE PROCEDURES DURING CONSTRUCTION, AS SMALL AN AREA OF SOIL AS POSSIBLE SHOULD BE EXPOSED FOR AS SHORT A TIME AS POSSIBLE. AFTER CONSTRUCTION, GRADE, RESPREAD TOPSOIL, AND STABILIZE SOIL BY SEEDING AND MULCHING TO PREVENT EROSION. ALL SEDIMENTATION AND EROSION CONTROL DEVICES SHALL BE INSPECTED DURING CONSTRUCTION ON A DAILY BASIS AND FOLLOWING ALL STORMS BY THE RESIDENT ENGINEER. THE CONTRACTOR SHALL MAINTAIN AND MAKE REPAIRS AND REMOVE SEDIMENT AS REQUESTED BY THE RESIDENT ENGINEER. THIS WORK SHALL BE PERFORMED WITHIN 24 HOURS OF REQUEST. THE CONTRACTOR SHALL CLEAN SEDIMENT AND DEBRIS FROM ALL DRAINAGE STRUCTURES AND PIPES. AT THE COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL REPAIR ALL ERODED AREAS AND ENSURE A GOOD STAND OF TURF IS ESTABLISHED THROUGHOUT. THE CONTRACTOR SHALL REPAIR ALL ERODED OR DISPLACED RIPRAP, AND CLEAN SEDIMENT COVERED STONES. TOE TRENCH (6" MIN. WIC SILT FENCE DETAIL N.T.S. WOODEN STAKE 1�13:�N7 4 S-0" CONSERVA77ON COMMENTS FLOW 3 SLOPE W - a 06/06/07 0 HMC cn 04/04/07 w HMC 0 DRAWN BY: HMC CHECKED BY: MJC o FLOW N0. I DATE GROUND a 0 J F � zo w Y o CATCH BASIN (SEE DETAIL) FACE 2 DUMP STRAPS EACH BAG DETAIL N.T.S. SUMP (SEE CB DETAIL) SILT SACK INSTALLATION DETAIL N.T.S. ANGLE FIRST STAKE TOWARD PREVIOUSLY LAID BALE. FLOW \ PLAN S-0" u '-BOUND BALES PLACED ON CONTOUR 2 REBARS, STEEL PICKETS, OR 2"x2 STAKES 1 1/2' TO 2 IN GROUND. DRIVE FLUSH WITH BALES. ANCHORING DETAIL 3AKED HAY OR STRAW. AIN. SIZE SHALL BE 36" x 18" x 24" SILT FENCE - 1" x 1" x 48" OAK STAKES PER BALE (MIN.) )R EQUIVALENT SIZE SAPLINGS 1:71 stal fid. N 1" x 1" OAK STAKES 2 - 1" x 1" x 48" OAK STAKES PER BALE (MIN.) OR EQUIVALENT SIZE SAPLINGS SILT FENCE (EMBEDDED IN GROUND) BALED HAY OR STRAW /-GROUND m I 4" 'i' '';' 6„ FLOW �f V-0" MIN. SILT FENCE & HAY BALE DETAIL N.T.S. CONSTRUCTION SPECIFICATIONS: 1. HAY BALES SHALL BE PLACED AROUND NEWLY INSTALLED CATCH BASINS AND DROP INLETS (WHERE REQUIRED) TO PREVENT SEDIMENTATION AND OTHER DEBRIS FROM ACCUMULATING ON THE GRATE OR IN THE SUMP. HAY BALES SHOULD BE KEPT CLEAN AND FREE OF DEBRIS TO FACILITATE FLOW. 2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF 4 INCHES, AND PLACED SO THE BINDINGS ARE HORIZONTAL. 3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY EITHER TWO STAKES OR OR REBARS DRIVEN THROUGH THE BALE. THE FIRST STAKE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE AT AN ANGLE TO FORCE THE BALES TOGETHER. STAKES SHALL BE DRIVEN FLUSH WITH THE BALE. 4. INSPECTION SHALL BE FREQUENT AND REPAIR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. 5. BALES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFULNESS SO AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE. HAY BALE NOTES r 0 i GENERAL THIS PLAN PROPOSES EROSION CONTROL MEASURES TO ADEQUATELY CONTROL ACCELERATED SEDIMENTATION AND REDUCE THE DANGER FROM STORM WATER RUNOFF AT THE SITE. THE RUNOFF SHALL BE CONTROLLED BY THE INTERCEPTION, DIVERSION, AND SAFE DISPOSAL OF PRECIPITATION. RUNOFF SHALL ALSO BE CONTROLLED BY STAGING CONSTRUCTION ACTIVITY AND PRESERVING NATURAL VEGETATION WHEREVER POSSIBLE. EXISTING VEGETATION SHALL BE PROTECTED AND ONLY THAT CLEARING AND GRUBBING ABSOLUTELY NECESSARY TO THE PROPOSED CONSTRUCTION SHALL BE PERFORMED. ALL DISTURBED AREAS SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AND CONTOUR, UNLESS OTHERWISE INDICATED ON THE PLANS. THE CONTRACTOR SHALL TAKE SPECIAL CARE WITH HIS CONSTRUCTION METHODS AND SHALL COMPLY WITH THE FOLLOWING GUIDELINES. SEDIMENTATION CONTROL ALL AREAS SHALL BE PROTECTED FORM SEDIMENTATION DURING AND AFTER CONSTRUCTION, PARTICULARLY THE STORAGE OF EXCAVATED OR STOCKPILED MATERIAL. THE CONTRACTOR SHALL CAREFULLY STRIP ALL TOPSOIL, LOAM, OR ORGANIC MATTER PRIOR TO THE TRENCHING OR OTHER OPERATIONS AND SHALL STORE THEM SEPARATELY FROM ALL OTHER MATERIALS DURING EXCAVATION. EACH STOCKPILE MUST BE ADEQUATELY RINGED WITH SEDIMENT CONTROL MATERIAL (i.e., HAY BALES AND/OR FILTER FABRIC FENCE). DEBRIS AND OTHER WASTE RESULTING FROM EQUIPMENT MAINTENANCE AND CONSTRUCTION WILL NOT BE DISCARDED ON SITE. STABILIZING OF SLOPES SHALL BE DONE IMMEDIATELY AFTER CONSTRUCTION OF SLOPES. SLOPES STEEPER THAN 4:1 SHALL BE PROTECTED WITH EROSION MATS. THESE MATS ARE MANUFACTURED COMBINATIONS OF MULCH AND NETTING AND SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. ALL OTHER AREAS SHALL BE MULCHED WITH HAY OR STRAW AT A RATE OF 1.5 TO 2 TONS PER ACRE. STRAW OR HAY MULCH MUST BE ANCHORED IMMEDIATELY AFTER SPREADING TO PREVENT WINDBLOWING. EROSION AND SEDIMENTATION CONTROL PLAN SEDIMENTATION CONTROL SYSTEM - THE SEDIMENTATION CONTROL SYSTEM SHALL CONSIST OF HAY BALES WITH FILTER FABRIC BARRIER FENCE. THE SEDIMENTATION CONTROL SYSTEM SHALL BE INSTALLED BEFORE ANY CONSTRUCTION BEGINS AS INDICATED ON THE PLANS. DESIGN THE SYSTEM TO INTERCEPT SILT AND SEDIMENT BEFORE IT REACHES THE WETLANDS OR WATERCOURSES. DEPOSITS OF SEDIMENT AND SILT ARE TO BE PERIODICALLY REMOVED FROM THE UPSTREAM SIDE OF THE FENCE. THIS MATERIAL IS TO BE SPREAD AND STABILIZED IN AREAS NOT SUBJECT TO EROSION, OR IN AREAS WHICH ARE NOT TO BE PAVED OR BUILT ON. THE SEDIMENTATION CONTROL SYSTEM IS TO BE REPLACED AS NECESSARY TO PROVIDE PROPER FILTERING ACTION. THE SYSTEM IS TO REMAIN IN PLACE AND BE MAINTAINED TO INSURE EFFICIENT SILTATION CONTROL UNTIL ALL AREAS ABOVE THE FENCE ARE STABILIZED AND VEGETATION HAS BEEN ESTABLISHED. SILT SACKS - SILT SACKS SHALL BE INSTALLED AT ALL CATCH BASINS WHERE SEDIMENT MAY ENTER THE CATCH BASIN OR AS DIRECTED BY THE RESIDENT ENGINEER. DEPOSITS OF SEDIMENT AND SILT ARE TO BE PERIODICALLY REMOVED FROM THE SILT SACKS. THIS MATERIAL IS TO BE SPREAD AND STABILIZED IN AREAS NOT SUBJECT TO EROSION, OR IN AREAS WHICH ARE NOT TO BE PAVED OR BUILT ON. SILT SACKS ARE TO BE REPLACED AS NECESSARY TO PROVIDE PROPER FILTERING ACTION. THE SYSTEM IS TO REMAIN IN PLACE AND BE MAINTAINED TO INSURE EFFICIENT SILTATION CONTROL UNTIL ALL AREAS ABOVE THE EROSION CHECKS ARE STABILIZED AND VEGETATION HAS BEEN ESTABLISHED. IN ALL AREAS, REMOVAL OF TREES, BUSHES, AND OTHER VEGETATION, AND DISTURBANCE TO THE SOIL, IS TO BE KEPT TO AN ABSOLUTE MINIMUM WHILE ALLOWING PROPER DEVELOPMENT OF THE SITE. EROSION AND SEDIMENT CONTROL MAINTENANCE PROCEDURES DURING CONSTRUCTION, AS SMALL AN AREA OF SOIL AS POSSIBLE SHOULD BE EXPOSED FOR AS SHORT A TIME AS POSSIBLE. AFTER CONSTRUCTION, GRADE, RESPREAD TOPSOIL, AND STABILIZE SOIL BY SEEDING AND MULCHING TO PREVENT EROSION. ALL SEDIMENTATION AND EROSION CONTROL DEVICES SHALL BE INSPECTED DURING CONSTRUCTION ON A DAILY BASIS AND FOLLOWING ALL STORMS BY THE RESIDENT ENGINEER. THE CONTRACTOR SHALL MAINTAIN AND MAKE REPAIRS AND REMOVE SEDIMENT AS REQUESTED BY THE RESIDENT ENGINEER. THIS WORK SHALL BE PERFORMED WITHIN 24 HOURS OF REQUEST. THE CONTRACTOR SHALL CLEAN SEDIMENT AND DEBRIS FROM ALL DRAINAGE STRUCTURES AND PIPES. AT THE COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL REPAIR ALL ERODED AREAS AND ENSURE A GOOD STAND OF TURF IS ESTABLISHED THROUGHOUT. THE CONTRACTOR SHALL REPAIR ALL ERODED OR DISPLACED RIPRAP, AND CLEAN SEDIMENT COVERED STONES. TOE TRENCH (6" MIN. WIC SILT FENCE DETAIL N.T.S. WOODEN STAKE 1�13:�N7 4 07/13/07 CONSERVA77ON COMMENTS HMC 3 06/28/07 SITE PLAN REVIEW COMMENTS HMC 2 06/06/07 DRAINAGE IMPROVEMENTS HMC 1 04/04/07 95% DESIGN HMC 0638—DET DRAWN BY: HMC CHECKED BY: MJC 6 OF N0. I DATE DESCRIPTION BY PROJECT ADDRESS: 534 WINSLOW GRAY ROAD SOUTH YARMOUTH, MASSACHUSETTS 02664 ASSESSORS MAP 59, PARCEL 44 YARMOUTH HOUSING AUTHORI T) SOUTH YARMOUTH, MASSACHUSEJ DHCD PROJECT NO. 351012 LONG POND PLAZA MISCELLANEOUS DETAILS 111 GCG ASSOCIATES, IN WILMINGTON MASSACHUSETT CARR m CIVIL y SCALE: AS SHOWN DATE: JUNE 6, 2007 No1590 No. 35907 JOB NO.\FILE NAME: DESIGNED BY: MJC PLAN N( Q `4Q Sl°"AL� (77�13�0'7 0638—DET DRAWN BY: HMC CHECKED BY: MJC 6 OF