Loading...
HomeMy WebLinkAbout83-1805 - Details 126 26 24 2: 21 1 1 'ERATION POINT: AT 22.7• TDH IX. 3.0' >2.5' O.K. NETWORK SYSTEM CURVE - WITH 4" TRANSPORT PIPE - AYERS 3WHV 3.0 BHP 6.0" IMP. DIAMETER 100 200 300 4 ., Uu JO CAPACITY -GPM » ')TEM CURVE WITH PUMP CURVE FOR MYERS 3WHV 3BHP 6.0 IMP. PUMP C.I. RING & COVER LEBARON LAO910 OR EQ. OVER CLEANOUT TO GRADE. TYPICAL WHERE INDICATED AT ALL MAJOR BENDS & INTERSECTIONS H-70 CAST IRON CO ]RST FLOOR VARIES =L. 24-27± FLOOR ELEV'S SEE SITE PLAN 2 cu ,CH40 _ 2' PVC RECYCLE LINE AT 2% CONC. - s 1 Wcq N 10" Q FIRST FLOOR VARIES EL. 23.8-27 5± W/ GAS BAFFLE 6.5 BUI DI G 1 CONNECTION FROM BUILDING WITH CLEANOUT TO GRADE (NP.) C) J L W W O co W J X w JLo Of U w r- �# p ,C Lu 0 O 4 0 Q) Ff L a: r 1 00 LLz w SCH40 PVC AT 29, 8" SDR35 AT 0.6% IW- I Q o J %� QLLI = m 20.0 SMH1 L r w 0) �I w SMH2 9 19.70 INV. Q 18.93 r w o 'ERATION POINT: AT 22.7• TDH IX. 3.0' >2.5' O.K. NETWORK SYSTEM CURVE - WITH 4" TRANSPORT PIPE - AYERS 3WHV 3.0 BHP 6.0" IMP. DIAMETER 100 200 300 4 ., Uu JO CAPACITY -GPM » ')TEM CURVE WITH PUMP CURVE FOR MYERS 3WHV 3BHP 6.0 IMP. PUMP C.I. RING & COVER LEBARON LAO910 OR EQ. OVER CLEANOUT TO GRADE. TYPICAL WHERE INDICATED AT ALL MAJOR BENDS & INTERSECTIONS H-70 CAST IRON CO ]RST FLOOR VARIES =L. 24-27± FLOOR ELEV'S SEE SITE PLAN 2 cu ,CH40 _ 2' PVC RECYCLE LINE AT 2% CONC. - s 1 -27. MIN 15.30 15.40 SEWER TH A DATE: 9/24/03 2 PM EVALUATOR: DANIEL A. OJALA PLS, SE WITNESS: AMY VON HONE, RS (BOF EXCAVATOR: REID ELLIS, ELLIS BROS. DEPTH: ELEVATION: 0" 21.9 FILL 28" B 19.6 LS 10YR6/8 48" 17.9 BORT Cl M/C SAN 807 1OYR5/6 AT 7 24 C 15% GRAVEL <9" AT <2 MIN 120" 1 11.9 NO GROUNDWATER FOUND � 00 LT 00 00 I � NN (D� n 7 TYPICAL VENT (CONNECT TO FIELD VENT) GATE VALVE AND BOX PVC 15.05 / II 14.95 9,000 GAL F.A.S.. READY 9,000 GAL P/C SEPTIC TANK 11 PUMP DUPLEX PUMPS SEE DETAILS MECHANICAL COMPACTION & 6" STONE (NP.) 310 CMR 15.228(1)/ REINF. CONC. PAD UNDER TUNNEL MOLD TANK TO MANUF. SPECS. SEPTIC SYSTEM SHORING OF EXCAVATION MAY BE REQUIRED. RESPONSIBILITY OF CONTRACTOR NOT TO SCALE TO MAINTAIN PUBLIC AND BUILDING SAFETY . VALVE BOX FINISH GRADE SAWCUT & MATCH PAVEMENT WHERE REQ. SEE PAVEMENT SECTION (5) GATE VALVES WITH COVERS TO GRADE SEE DETAILS i 1 12" PERF. HDPE / PUMP OUT WELL TO SAND AT BOTTOM L.F. INSPECTION PORT DETAIL PROVIDE CHARCOAL INSPECTION PORT SEE DETAIL FILTER ON VENTS / MATCH PA MENT WHERE REQ. 1 ELEVATION VARIES: 23.5'± MAX. TO EL. 25.0±' CLEANOUT DETAIL: VENT FOR EACH BANK OF LATERALS. PITCH BACK TO SAS AT .005 FT./FT. MIN. CONSTRUCT VERTICAL SECTION OF SCH80 (GRAY) 4" PVC PIPE PROVIDE INSECT SCREEN. LUG PROPOSED F� A mSGHAo 9817 S PRESSURE DOSED LEACHING FIELD ELEV. 17.0± V.I.F. 19.0± 14.70± EL 10 THBI INVERT OF LATERALS LEVEL AT EL 21.67 NO GROUNDWATER FOUND BOTTOM OF REMOVAL TO ELEV. 17.0±. SEE LOGS, DEPTH MAY VARY WITH THE ORIGINAL GROUND SURFACE ELEVATION. ENGINEER TO INSPEC:r S011 REMOVAL - REPLACE WITH CLEAN MEDIUM SAND 310CMR 15.255 (3). QUOTE ADDITIONAL MATERIAL AT COST PER 5' REMOVAL OF UNSUITABLE SOILS REQUIRED. REMOVE TO THE BOTTOM OF THE B LAYER SHOWN ON TEST HOLE LOGS. THE DEPTH OF FILL AND UNSUITABLE MATERIAL MAY VARY, ENGINEER TO INSPECT AND CERTIFY THE REMOVAL. QUOTE CUBIC YAARDLIN EC SAE REQUIRED. REPLACE AT COST 0000 00 u) if) X 0- L) - L) GVtlll.TO CORDINATE IHRU Iry v+oi. .•���`�� INSPECTION SCHEDULE: 24THR. NOTICE REQUIRED. INSPECTIONS 1. OWNERS ENGINEER TO INSPECT UNSUITABLE SOIL REMOVAL PRIOR TO THE PLACEMENT OF THE CLEAN SAND FILL. 2. OWNERS ENGINEER TO INSPECT WHEN CLEAN FILL HAS BEEN BROUGHT IN. BOTTOM OF LEACHING FIELD ELEVATION IS TO BE CERTIFIED PRIOR TO THE PLACEMENT OF THE DOUBLE WASHED STONE. 3. OWNERS ENGINEER TO INSPECT THE DOUBLE WASHED STONE TO ENSURE IT IS FREE OF DUST AND FINES. 4, ENGINEER TO INSPECT THE SHOP DRILLED ORIFICES TO ENSURE BURRS HAVE BEEN REMOVED FROM LATERALS. 5. ENGINEER TO INSPECT TANKS TO ENSURE WATERPROOF. 6. PROPER FUNCTIONING OF THE PUMPS, CONTROLS AND ALARMS SHALL BE DEMONSTRATED BY CLEAN WATER TESTING PRIOR TO BACKFILLING THE SS FIELD. 7. AN AS -BUILT PLAN WITH INVERT ELEVATIONS AND FIELD LOCATION IS TO BE PREPARED FOR THE TOWN BY THE OWNERS ENGINEER.BE 8. ALL SITE WORK. INCLUDING CLEARING. INAGE ETC. PECTED ERS 9. ALL WATER WORK TO CONFORM TO YARMOUTHREGULATIONSBASE,G, GRAVEL REGULATIONSAND PAVEMENT, S- ALL WORKOTO BE SINSPECTTEDYANNDNTESTED GIN Wcq N 10" Q N 15,000 GAL ST 34" SEPTIC TANK W/ GAS BAFFLE -27. MIN 15.30 15.40 SEWER TH A DATE: 9/24/03 2 PM EVALUATOR: DANIEL A. OJALA PLS, SE WITNESS: AMY VON HONE, RS (BOF EXCAVATOR: REID ELLIS, ELLIS BROS. DEPTH: ELEVATION: 0" 21.9 FILL 28" B 19.6 LS 10YR6/8 48" 17.9 BORT Cl M/C SAN 807 1OYR5/6 AT 7 24 C 15% GRAVEL <9" AT <2 MIN 120" 1 11.9 NO GROUNDWATER FOUND � 00 LT 00 00 I � NN (D� n 7 TYPICAL VENT (CONNECT TO FIELD VENT) GATE VALVE AND BOX PVC 15.05 / II 14.95 9,000 GAL F.A.S.. READY 9,000 GAL P/C SEPTIC TANK 11 PUMP DUPLEX PUMPS SEE DETAILS MECHANICAL COMPACTION & 6" STONE (NP.) 310 CMR 15.228(1)/ REINF. CONC. PAD UNDER TUNNEL MOLD TANK TO MANUF. SPECS. SEPTIC SYSTEM SHORING OF EXCAVATION MAY BE REQUIRED. RESPONSIBILITY OF CONTRACTOR NOT TO SCALE TO MAINTAIN PUBLIC AND BUILDING SAFETY . VALVE BOX FINISH GRADE SAWCUT & MATCH PAVEMENT WHERE REQ. SEE PAVEMENT SECTION (5) GATE VALVES WITH COVERS TO GRADE SEE DETAILS i 1 12" PERF. HDPE / PUMP OUT WELL TO SAND AT BOTTOM L.F. INSPECTION PORT DETAIL PROVIDE CHARCOAL INSPECTION PORT SEE DETAIL FILTER ON VENTS / MATCH PA MENT WHERE REQ. 1 ELEVATION VARIES: 23.5'± MAX. TO EL. 25.0±' CLEANOUT DETAIL: VENT FOR EACH BANK OF LATERALS. PITCH BACK TO SAS AT .005 FT./FT. MIN. CONSTRUCT VERTICAL SECTION OF SCH80 (GRAY) 4" PVC PIPE PROVIDE INSECT SCREEN. LUG PROPOSED F� A mSGHAo 9817 S PRESSURE DOSED LEACHING FIELD ELEV. 17.0± V.I.F. 19.0± 14.70± EL 10 THBI INVERT OF LATERALS LEVEL AT EL 21.67 NO GROUNDWATER FOUND BOTTOM OF REMOVAL TO ELEV. 17.0±. SEE LOGS, DEPTH MAY VARY WITH THE ORIGINAL GROUND SURFACE ELEVATION. ENGINEER TO INSPEC:r S011 REMOVAL - REPLACE WITH CLEAN MEDIUM SAND 310CMR 15.255 (3). QUOTE ADDITIONAL MATERIAL AT COST PER 5' REMOVAL OF UNSUITABLE SOILS REQUIRED. REMOVE TO THE BOTTOM OF THE B LAYER SHOWN ON TEST HOLE LOGS. THE DEPTH OF FILL AND UNSUITABLE MATERIAL MAY VARY, ENGINEER TO INSPECT AND CERTIFY THE REMOVAL. QUOTE CUBIC YAARDLIN EC SAE REQUIRED. REPLACE AT COST 0000 00 u) if) X 0- L) - L) GVtlll.TO CORDINATE IHRU Iry v+oi. .•���`�� INSPECTION SCHEDULE: 24THR. NOTICE REQUIRED. INSPECTIONS 1. OWNERS ENGINEER TO INSPECT UNSUITABLE SOIL REMOVAL PRIOR TO THE PLACEMENT OF THE CLEAN SAND FILL. 2. OWNERS ENGINEER TO INSPECT WHEN CLEAN FILL HAS BEEN BROUGHT IN. BOTTOM OF LEACHING FIELD ELEVATION IS TO BE CERTIFIED PRIOR TO THE PLACEMENT OF THE DOUBLE WASHED STONE. 3. OWNERS ENGINEER TO INSPECT THE DOUBLE WASHED STONE TO ENSURE IT IS FREE OF DUST AND FINES. 4, ENGINEER TO INSPECT THE SHOP DRILLED ORIFICES TO ENSURE BURRS HAVE BEEN REMOVED FROM LATERALS. 5. ENGINEER TO INSPECT TANKS TO ENSURE WATERPROOF. 6. PROPER FUNCTIONING OF THE PUMPS, CONTROLS AND ALARMS SHALL BE DEMONSTRATED BY CLEAN WATER TESTING PRIOR TO BACKFILLING THE SS FIELD. 7. AN AS -BUILT PLAN WITH INVERT ELEVATIONS AND FIELD LOCATION IS TO BE PREPARED FOR THE TOWN BY THE OWNERS ENGINEER.BE 8. ALL SITE WORK. INCLUDING CLEARING. INAGE ETC. PECTED ERS 9. ALL WATER WORK TO CONFORM TO YARMOUTHREGULATIONSBASE,G, GRAVEL REGULATIONSAND PAVEMENT, S- ALL WORKOTO BE SINSPECTTEDYANNDNTESTED GIN Ur g a¢d � °Z W J Z ? U i N Wcq N Q N Q I N U) O C) J L W W O co W J X w JLo Of U w r- �# p ,C Lu 0 O 4 0 Q) Ff L a: r Ur g a¢d � °Z W J Z ? U i N Wcq N Q N I N ►W - w QD Q co W J X w JLo Of w r- �# p ffi� Lu 0 O 4 0 Ff L a: Q 1 00 LLz w o IW- I Q o J %� QLLI = m L r w 0) �I w Q w o a Q U J Q Ln 00 p N O = Q o II �M Q J F_ LLJ It L 0 J 't N G_ = U O U 0 r7 0 Z Wcq N Q a ►W - w QD Q co J X w JLo w 0 �# p ffi� Lu ? 4 0 Ff L a: Q LLz w IW- W Q J %� QLLI = m L r 0) 04 SHEET 4 OF 7 03-244