Loading...
83-1805 - Landscape Plan 2GEORGE T. ABBOTT TRS DB 10018 PG 90 —� ,rl,l/ 246.28, 1400°06'40 YY LAWN `1 MASONRY STEP (TYP.) 101. 77 ' LAWN N022f-6 w6' STCKAE BUILDING CEDAROFENOCE SA COLONIAL5 5c TRIPLEX r t LAWN 4C 6B BUILDING 4 3C 4A APE TRIPLEX , BUILDING 3 r 3A COLONIAL TRIPLEX ,qj o� LAWN 36 � � � `•, arr *���0 � dk LAWN BLUE PRINCESS HOLLY (TYP.) LAWN MAILBOXES---. { 26 a� li BUILDING 2 GABLE ENTRY I CAPE DUPLEX 03 V SDo 0) LAWN 2A LAWN BUILDING 1 GABLE ENTRY CAPE DUPLEX DUMPSTER EASTERN ENCLOSURE RED CEDAR a 1A +y: LA WN 4- WHITE PICKET FENC TOP OF ROOTBALL SHALL BEAR SAME RELATIONSHIP TO FINISHED GRADE AS TO PREVIOUS EXISTING GRADE DCE #03-244 (TYP.) + CO - 0 Owe G 07 �B •, r[u '900 tae 50773'30"W 130.03' PLANT SCHEDULE cQ 03N V 41. �� 0 1 R EDGE PAVE PLACE BALL ON SUBSOIL. REMOVE AND DISCARD BURLAP EXCEPT UNDER BALL. REMOVE ALL SYNTHETIC SOIL WRAPPING MATERIALS (TREATED BURLAP, NYLON TWINE, WIRE BASKETS, ETC.) AND DISCARD EXCAVATE SUBSOIL AS REQUIRED TO PLACE ROOTBALL TO PROPER ELEVATION. PLACE ROOTBALL DIRECTLY ON SUBSOIL EXCAVATE HOLE TO DIAMETER 3X WIDER THAN ROOTBALL. BACKFILL HOLE WITH PLANTING SOIL MIX AS SPECIFIED 3" BARK MULCH, AS SPECIFIED -UNDISTURBED SUBGRADE SHRUB PLANTING NOT TO SCALE PLANT BOTANIC NAME PLANT QUANTITY SYMBOL COMMON NAME SIZE OF PLANTS 2. PLANTING DEPTH SHALL BE THE SAME OR HIGHER AS Acer rubrum October Glory down cape engineering, Inc. GROWN IN NURSERY. October Glory(R) Swamp Maple 3" CAL. 6 Betula nigra'Cully' Heritage River B'rch-clumP 2' 12 Cornus kousa Kousa Dogwood 3° CAL. 6 Pyrus calleryana'Cleveland Select' Cleveland Select Pear 2.5" CAL. 9 Prunus cerasifem Thundercloud' Thundercloud Plum -purple leaf 2.5" CAL. 6 Junlperus virglniana Eastern Red Cedar 7-8' 6 Rhododendron 'English Roseum' En Gsh Roseum Rhododendron -pink 24-30" 31 Ilex x meserveae Blue Princess Blue Princess Meserve Holl 3.4' 4 /ppl. Hydrangea macrophylla'Nikko Blue' S Nikko Blue Hydrangea -blue mo head #5 125 Pinus mugo'Pumilio' Dwarf Mu ho Pine #3 38 Prunus laurocerasus'Schipkaensis' Schi ka Che laurel 3-4' 10 J Prunus laurocerasus'Otto Luyken' Otto Lu ken Cherrylaurel 18-24" 6 Ilex glabra'Shammck' Shamrock Inkbe mom act 24-30" 49 Thuja occidentalis'Smaragd' 0 Emerald Green American Arborvitae 5' 27 Spiraea bumalda'Anthony Waterer' ® AnthonyWaterers irea #3 15 Miscanthus sinensis'Gracillimus' i • Malden Grass #3 42 Rosa KnockoutT #2 52 Knockouttm Rose�herry red Pennisetum alopecuroides'Hameln' Hameln Fountain Grass -dwarf #2 1 15 0 Lavandula'Hidcote Hidcote Lavender #1 25 © Leucanthemum'Snow Lady' Shasta Daisy #1 42 m Ligustrum ovalifolium California Privet 3A' 355 Hemerwallis'Happy Returns' Happy Returns Da III -re eat #1 218 Annual!Perennial Color 6' Wood Privacy Fence 4' White Picket Fence 0 0 LAWN � I ANTIQUE STYLE POST LIGHT (TYP.) NO3 28'35 "E 24.44' LA WN BUILDING 6 6C APE TRIPLEX 6813 '40'E_5' STOCKADE 11.9 6' CEDAR FENCE 7A BUILDING 7 COLONIAL 7C TRIPLEX 7B s LAWN LAWN - -wiligiggi - FrN• BUILDING 8 APE TRIPLEX' • •s,.8B LA WNr EM E ALD ARBORVITAE HEDGE KNOCKZUT ROSE (TYP.) •y*tf� � C t p IK fli:�iu"il� � t •••• •-• •c •913 1 - BUILDING`COLONIALt - , • GARAGE •• DUPLEX • by y-• ••• • 't+'• �- f 6' STOCKADE FENCE • 0• STOCKADE b;1 FOUNDSX X X - X - X X X X X XCEDA •� 0951'40 • , - . ,NCE x 1) ALL PLANT MATERIAL SHALL CONFORM TO THE STANDARDS OF THE AMERICAN ASSOCIATION OF 1) PERMANENT SEEDING SHALL CONSIST OF THE FOLLOWING MIXTURE OR APPROVED EQUAL - OPTIMUM O NURSERYMEN OR THE PLANT MATERIAL WILL BE UNACCEPTABLE. ALL PLANT MATERIAL SHALL BE TRUE TO SEEDING DATES ARE BETWEEN APRIL 1 AND MAY 31 AND AUGUST 16 AND OCTOBER 15. SPECIES, VARIETY, SIZE AND BE CERTIFIED DISEASE AND INSECT FREE. THE OWNER AND/OR THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO APPROVE ALL PLANT MATERIAL ON SITE PRIOR TO SUMMER STRESS MIXTURE (LOFTS SEED INC.) INSTALLATION. 90% REBEL II OR TRIBUTE TALL FESCUE Ct 10% NASSAU OR BARON KENTUCKY BLUEGRASS SEEDING RATE: 5 PER 1 000 S . FT. OR 200 PER ACRE. TE Q 2 ALL PLANT MATERIAL SHALL BE PROPERLY GUYED, STAKED WRAPPED AND PLANTED IN CONFORMANCE # # i RAKING R DRILLING INTO THE SOLS AT A RATE OF 150 WITH THE TYPICAL PLANTING DETAILS. GUY WIRES SHALL BE ATTACHED TO THE TREE AT A HEIGHT OF 2) PERMANENT SEEDING TO BE APPLIED BY R 0 D # TWO-THIRDS THE HEIGHT OF THE TREE AND SHOULD BE LOCATED AT POINTS SO AS NOT TO SPLIT THE PER ACRE. SLOPED AREA TO BE COVERED WITH MULCH AS INDICATED IN NOTE 4. TRUNKS OF MULTI -STEMMED TREES. PROVIDE THREE STAKES PER TREE UNLESS NOTED OTHERWISE. INSTALL ALL PLANT MATERIAL ON UNDISTURBED GRADE. PROVIDE BURLAP WRAPPING WITH A 50% 3) FERTILIZER FOR THE ESTABLISHMENT OF TEMPORARY AND PERMANENT VEGETATIVE COVER SHALL BE OVERLAP. CUT AND REMOVE BURLAP FROM TOP ONE-THIRD OF THE ROOT BALL. 10-10-10 APPLIED AT A RATE OF 15# PER 1,000 SQ. FT. OR AS DETERMINED BY SOIL TESTS. LIMESTONE FOR TEMPORARY SEEDING SHALL BE APPLIED AT A RATE OF 90# PER 1,000 SQ. FT. LIMESTONE FOR 3) PROVIDE PLANTING PITS AS INDICATED ON PLANTING DETAILS. BACKFILL PLANTING PITS WITH ONE PERMANENT SEEDING SHALL BE APPLIED AT A RATE OF 135# PER 1,000 SQ. FT. PART EACH OF TOPSOIL, PEAT MOSS AND PARENT MATERIAL. IF WET SOIL CONDITIONS EXIST THEN PLANTING PITS SHALL BE EXCAVATED AN ADDITIONAL 12" AND FILLED WITH SAND. 4) MULCH TO CONSIST OF SMALL GRAIN STRAW OR SALT HAY ANCHORED WITH A WOOD AND FIBER MULCH BINDER OR AN APPROVED EQUAL. MULCH WILL BE SPREAD AT RATES OF 90 TO 115 LBS. PER 4) NEWLY INSTALLED PLANT MATERIAL SHALL BE WATERED AT THE TIME OF INSTALLATION. REGULAR 1,000 SQ. FT. AND ANCHORED WITH A MULCH ANCHORING TOOL OR LIQUID MULCH BINDER AND SHALL BE WATERING SHALL BE PROVIDED TOI ENSURE THE ESTABLISHMENT, GROWTH AND SURVIVAL OF ALL PLANTS. PROVIDED ON ALL SEEDINGS. HYDROMULCH SHALL ONLY BE USED DURING OPTIMUM GROWING SEASONS. 5) ALL PLANT MATERIAL SHALL BE GUARANTEED FOR ONE YEAR AFTER THE DATE OF FINAL ACCEPTANCE. ANY PLANT MATERIAL THAT DIES WITHIN THAT TIME PERIOD SHALL BE REMOVED, INCLUDING ��t�or4fq THE STUMP, AND REPLACED BY A'' TREE OF SIMILAR SIZE AND SPECIES AT THE EXPENSE OF THE s DEVELOPER. a�o� DAANIEL y�N� 6) THE LANDSCAPE CONTRACTOR SHALL PROVIDE A MINIMUM 6" LAYER OF TOPSOIL IN ALL LAWN AREAS OJALA N AND A MINIMUM OF 12" OF TOPSOIL IN ALL PLANTING AREAS. A FULL SOIL ANALYSIS SHALL BE A No 409 CONDUCTED I AMENDMENT AFTER CONSTRUCTION AND PRIOR TO PLANTING TO DETERMINE THE EXTENT OF SOIL Chat E 55+ RQ J 7) ALL DISTURBED LAWN AREAS SHALL BE STABILIZED WITH EITHER SOD OR SEED AS INDICATED ON THE DATE LANDSCAPE PLANS. SEED SHALL CONSIST OF THE MIXTURE LISTED IN THE GENERAL SEEDING NOTES. ALL PERMIT SET: NOT FOR CONSTRUCTION DISTURBED LAWN AREAS SHALL BE TOPSOILED, LIMED, FERTILIZED AND FINE GRADED PRIOR TO LAWN INSTALLATION. LANDSCAPE PLAN 8) ALL PLANTING BEDS SHALL RECEIVE 3" OF SHREDDED PINE BARK. INSTALL TREE PLUMB 9) ALL SHRUB MASSES SHALL B� PLANTED IN CONTINUOUS MULCHED BEDS.TOP OF ROOTBALL SHALL BEAR SITE PLAN SAME RELATIONSHIP TO FINISHED GRADE AS TO PREVIOUS EXISTING INSTALL TREE PLUMB WINDRIFT VILLAGE TOP OF ROOTBALL SHALL BEAR ROOT FLARE SHALL BE EXPOSED; SAME RELATIONSHIP TO FINISHED MULCH SHOULD NOT BE WITHIN GRADE AS TO PREVIOUS EXISTING 4" OF TREE TRUNK GRADE #29 BAXTER AVE./#115 ROUTE 28 PLACE BALL ON SUBSOIL. REMOVE AND ROOT FLARE SHALL BE EXPOSED; DISCARD BURLAP EXCEPT UNDER BALL. IN MULCH SHOULD NOT BE WITHIN REINFORCED RUBBER REMOVE ALL SYNTHETIC SOIL WRAPPING Y/ 4" OF TREE TRUNK HOSE(1/2" DIA. MATERIALS (TREATED BURLAP, NYLON NEST YARMOUTH MA PLACE BALL ON SUBSOIL. REMOVE AND rn BLACK) TWINE, WIRE BASKETS, ETC.) AND DISCARD f w DOUBLE #10 GALVANIZED REINFORCED RUBBER DISCARD BURLAP EXCEPT UNDER BALL. WIRE GUYS AND EXCAVATE SUBSOIL AS REQUIRED HOSE(1/2" DIA. REMOVE ALL SYNTHETIC SOIL WRAPPING > TURNBUCKLES. GUYS TO PLACE ROOTBALL TO PROPER BLACK) MATERIALS (TREATED BURLAP, NYLON TO BE REMOVED AFTER ELEVATION. PLACE ROOTBALL PREPARED FOR DOUBLE #10 GALVANIZED= ONE YEAR. WIRE GUYS AND TWINE, WIRE BASKETS, ETC.) AND DISCARD w DIRECTLY ON SUBSOIL ARDAN BUILDING SERVICES TURNBUCKLES. GUYS TO BE EXCAVATE SUBSOIL AS REQUIRED = SURVEYOR'S - EXCAVATE HOLE TO DIAMETER w RIBBON REMOVED AFTER ONE YEAR. TO PLACE ROOTBALL TO PROPER WHITE _ 3X WIDER THAN ROOTBALL. SURVEYOR'S ELEVATION. PLACE ROOTBALL ( ) BACKFILL HOLE WITH PLANTING SCALE: 1 = 30 DATE: JANUARY 7, 2007 (R(IBBON DIRECTLY ON SUBSOIL SOIL MIX AS SPECIFIED REVISED: FEBRUARY 22, 2007 5�-OYDA�ETER EXCAVATE HOLE TO DIAMETER 3X WIDER THAN ROOTBALL. 3" BARK MULCH, AS SPECIFIED REVISED: MARCH 26, 2007 STEPS, LIGHTS, HPC j BACKFILL HOLE WITH PLANTING _T I UNDISTURBED SUBGRADE REVISED: JUNE 19, 2007 UNIT NUMBERS SOIL MIX AS SPECIFIED 1 i • - _ 2" x 2" x 3' HARDWOOD STAKES. 3" BARK MULCH, AS SPECIFIED 6" '�— I,�rLb SII-- 3 TREE HEIGHT. SHEET 7 OF 7 - - UNDISTURBED SUBGRADE 2" 3' HARDWOOD STAKES EQ. EQ. EQ. off 508-362-4541 NOTES:I— 1. NO SOIL OR MULCH SHALL BE PLACED AGAINST ROOT I 6 3 TREE HEIGHT. — _ — — fax 508 362-9880 COLLAR OF PLANT. __ EQ. EQ. EQ. EVERGREEN TREE PLANTING 2. PLANTING DEPTH SHALL BE THE SAME OR HIGHER AS down cape engineering, Inc. GROWN IN NURSERY. r FOR 8 AND ABOVE HEIGHT CIVIL ENGINEERS DECIDUOUS TREE PLANTING NOT TO SCALE LAND SURVEYORS FOR 3" CAL. AND ABOVE 20 0 20 40 60 Feet 939 Main Street — YARMOUTHPORT, MASS. NOT TO SCALE 03-244 HOUSING.DWG (DAO)