Loading...
HomeMy WebLinkAbout83-1826 - Hydrographic PlanDENrvr ynRmo I LOC vs- r»NR ° !2 fr/sri/v G n LvF/L //vG RFi)70 vE LANO/N4 ! _.mss— STA/RS �-�-'•---"'�^--� 8 B RD P bF /dFbfT/»ENT FL r 7. 9 =' /cp y/e Road E1=� o S.olr" coAsr,.,[ ae�cy n �A�sH Ljr-06 r S. roAasN i ij 0 - z PL.9/V SC/d L F 3nl 7Sf'/2�'.�"SEd P/ZE- SUOj>oftTB.O i 34 — I �i c r✓ _3xT ."3xti zo 1 /O DFC/t Er/ST. STOniE ' .eEvGrn-+E O MAlW EL.= Z.8 FLr�vG .aELiFrME7rT FAC E 70 /',/rirr�dEi4 SE F-?- /%C.2 'Rap. 14' RAh2_0 3' W. Lv/2005.0. /c Arm/aoF 17100RiN4 To FE .eFl./Nov/s/,'Eb u op TicN.v 2 .01, 4 S v/o,c eTEO py* [1 //v G GENERAL NOTES I. PLAN REFERENCE: LAND COURT PLAN 17002 B, LOT 7; LOT LINE, TOPOGRAPHY AND OTHER 91TE DATA 3 bPREPARED BY OUTERMOST LAND SURVEYING OF BREWSTER, MA. WITH HYDROGRAPHIC AND TIDAL DATA DETERMINED AND PROVIDED BY CAPE COD ENGINEERING, INC. 2. ELEVATIONS REFER TO MLW = 0.0. CONTACT CAPE COD E'NGINEER"C, INC FOR ADDITIONAL BENCHMARK INFORMATION. 3. CONSTRUCTION ACCESS SHALL BE PRIMARILY BY THE RIVER WITH LIMITED ACCESS DIRECTLY THROUGH THE PROPERTY. 4. THE EXISTING STAIRS AND SHORT PIER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE SOLID MATERIAL DISPOSAL PROCEDURES 5. EXCAVATION SHALL HE LIMITED TO THAT NECESSARY FOR PILING INSTALLATION. WHERE NAVIGABLE WATER ALLOYS, PILINGS SHALL BE HAMMER DRIVEN. MINIMUM PILING ENiBEDNIENT DEPTH SHALL BE 12 FT. (1 J A/?O oOSE,o /vo YR 1 I' fscCd !/r> 3'WX /4'L Fd9MP (3) /O "P� IJNt H Cf2 pl4AAl6S pAopo rev if FCogT ~� SYTYEM 200 5. �:C30'x 4.s , I o /0 20 30 90 so 60 PROF/LE '/9 -A 2"r4 "W/2"x 6" PAr2 c.qP 2"xs"rzr9rt w/2•'xs"cwP 48,• 36�� �. 2 "x S .. MrOari AC �•'ra" Bs=u r'Gs�P �� t.. � I /h r[v, a'tLE/a afJCE To i I ( I 1 I 11 1 1 1 � I TY/�/c A L P/ER i"/ZAME DETA/ L `I (/yo SCS L E, 6. ALL HARDWARE USED FOR CONSTRUCTION SHALL BE OF HOT DIP GALVANIZED STEEL OR EQUAL. 7. ALL TIMBER USED SHALL BE CONSISTENT WITII YARMOUTH CONSERVATION COMMISSION . REQUIREMENTS. 8. DECK PLANK SPACING SHALL BE A MINIMUM OF'/: INCH. 9. CONSTRUCTION MATERIALS AND DEBRIS SHALL NOT BE -STORED OR DISCARDED ON THE BANK OR BEACH. THE BEACH AND BUFFER ZONE SHALL•BE COMPLETELY CLEARED OF ANY DEBRIS ON A DAILY BASIS. 10 -RAMP AND FLOAT REMOVAL SHALL BE AT A SUITABLE OFF-SITE LOCATION. THE FLOAT SHALL NOT BE . STORED ANYWHERE WITHIN THE RESOURCE AREAS OR THE BUFFER ZONE ON THE PROPERTY. I I.REFER TO ANY ORDER OF CONDITIONS ISSUED FOR THIS PROJECT BY THE YARMOUTH CONSERVATION COMMISSION AND OTHER PERMITTING AGENCIES FOR CONSTRUCTION SCHEDULE„ USE PROCEDURES AND GUIDELINES. 4%rq"vosr- opri(rv: EXTF/✓O s ppear- PrL/N6 Fe'IV - All R_Ol TS .�'e'CJ /Z'�f/N. E/rvEEO�IENT HYDROGRAPHIC PLAN SHOWING PROPOSED PIER, RAMP AND FLOAT IN BASS RIVER 54 GRANDVIEW DRIVE, SOUTH YARMOUTH, MA PREPARED FOR STEVE GATTO [OF' )BE T JANUARY 29, 2008 SCALE —AS NO'T'ED M. PREPARED BY :R CAPE COD ENGINEERING, INC J' ROBERT M. PERRY, P.E. P.O. BOX 1517 qL FAST DENNIS, MA 02641 SOR-3E5-1445