HomeMy WebLinkAbout83-1828 - Sewage Disposal Design Repair002SOIL TEST PIT DATA: SEPTEMBER 10, 2002
TEST PIT #J -
GRD. EL. 10.4
EST. HIGH GW. 3.0 INDICATES
y ESTIMATED
SEASONAL HIGH
GROUND WATER
6" INDICATES
V OBSERVED
GROUND WATER
INDICATES
19" PERC.
EL 0.9' �_ LYNN MULKEEN-McCARTIN
PERC. RATE:
6 MIN./INCH
LOAMY FINE SAND SOIL EVALUATOR
2.5Y 6/3 CRAIG FIELD
SOIL CLASS:
1
EL = 0.4 120"
L. T.A.R.
0.74 G.P.D./SQ.FT.
DATUM:
VERTICAL DATUM: 1929 NGVD
BENCH MARK USED: TOWN OF YARMOUTH MONUMENT #4
BENCH MARK SET: TOP OF CONCRETE BOUND EL.=10.59
PROFILE: NOT TO SCALE
EL= A
TOP FOUNDATION FIRST PIPE LENGTH
BOLT ON METAL COVERS TO TO BE SET LEVEL
EL.=11.5 FINISHED GRADE. FOR MIN. 2'
FlNISH GRADE
`. EL=9.6-9.7
-� 4' PVC SCH 80�
4" PV
4" PVC SCH 8 LEACHING FIELD
nnnnnnnnnnnnonnnon
� 28'®0.025 400.03 5'®
�I-B 1=p 1=0
I -C I=E
S OUTLET IaF
SEPTIC TANK DIST. BOX 5' SEPARATION PROVIDED
EST. HIGH GROUNDWATER
K
INVERT ELEVATIONS:
TOP OF FOUNDATION 12.3 A
GARAGE SLAB 9.80
4" INVERT AT BUILDING 9.70 B
4" INVERT AT SEPTIC TANK (IN) 9.30 C
4" INVERT AT SEPTIC TANK (OUT) 9.05 D
4" INVERT AT DIST. BOX (IN) 8.90 E
4" INVERT AT DIST. BOX (
67"
81"
88"
LOAMY SAND
10YR 4/3
B
LOAMY S ND
10YR 5/4
EL = 8.8 TEST
Cl
MESAND
tOYR OYR 5/6 INDICATES
UNSUITABLE
MATERIAL
LOAMY FINE SAND DATE:
2.5Y 5/4 9/10/02
EL = 3.6 TEST BY:
THE BSC GROUP, INC.
EL = 3.0 - WITNESSED BY:
114"
SEPTIC .TANK DETAIL: 1,500 GALLON H-20 DISTRIBUTION BOX DETAIL: H-20 LEACHING FIELD DETAIL: NOT TO SCALE:
NOT TO SCALE NOT TO SCALE N0. OF OUTLETS : J VENT
NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, FINISHED GRADE
REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. 36" MAX .COVER
T EES TO BE CENTERED UNDER MANHOLE
2. SEPTIC TANK TO WITHSTAND H-10 LOADING COVER. REMOVABLE ••'.a�•a••�.v�•a••••i• -�- 3' WALLS NOTES: FINISHED GRADE T
UNLESS UNDER PAVEMENT, DRIVES OR COVER I 9A' I
TRAVELED WAYS, WHEREIN H-20 LOADING � � J�
1. DIST. BOX TO WITHSTAND H-20 LOADING \
SHALL APPLY. •.;::y,• a•�� 5' � � ��
3. ALL PIPE CONNECTIONS AND CONCRETE T 2• PROVIDE INLET TEE OR BAFFLE WHERE �
T
CONSTRUCTION SHALL BE WATERTIGHT. 2-24' DIA CONCRETE MANHOLES I SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR 4" PVC-' ' '-'-'- ' •�-'-' >�
W/ METAL HANDLES BROUGHT ( IN PUMPED SYSTEM.4 PERF SCH 80 PVC i
4. FILL ALL UNUSED KNOCKOUTS WITH � 20" S=0.005'q/��
Tb 6' OF FlNISH GRADE 1 4�
MORTAR. � I 3. FIRST TWO FEET OF PIPE OUT OF DIST. 9�°�����4ia`.°e'4���44��a•'��41���Op`b'if�4Ff'�i T s•aevni
6' •• � g•
TEE TO BE UNDER 9,5' OUTLETS i BOX TO BE LAID LEVEL 9P a � a4Pa4P 4/' '�4P a9Pa�}p
1 � \ \ `\
M.H. OPENING COVER ' a9•e • `
� �6" ea a'e ee a eea eaa LEVEL BOTTOM
�� 4
S-
/ 9S'
-I • / � �s,
• -�O OSS, \
•° 9� �
USE LEACHING FIELD
OUT)
8.73
F
INVERTS AT LEACHING FACILITY:
4" INVERT AT BEGINNING
SHEET 1 OF 1
4-8448.00
OF LEACHING FIELD
8.66
G
4" INVERT AT END
OF LEACHING FIELD
8.5
H
ELEVATION AT BOTTOM
OF LEACHING FIELD
8.0
J
ADJUSTED FOR HIGH TIDE
3.0
K
OBSERVED GROUNDWATER
0.9
"
u 4. RECOMMENDED MANUFACTURER-ROTONDO 32'
RAISE M.H W 6" BOTTOM ON LEVEL 4" OR APPROVED EQUAL.
11'-0" SEWER BRICK �:. -...i. a •:e ;- : STABLE BASE 6' MIN. 3/4" TO 5. ALL PIPE CONNECTIONS AND CONCRETE PROFILE
r 10'-0" & MORTAR _ 1 1/2" CRUSHED CONSTRUCTION SHALL BE WATERTIGHT.
NORMAL WATER LEVEL 12 CROSS-SECTION STONE BASE
6. FIT BREAKOUT BARRIER SNUG AROUND
e 3"
PRECAST SEPTIC TANK a 10_ 14_ T
e INLET TEE :S 5'-0"
O 5'-0" 4'-9" `
_ 4'-1' MIN. W eoM aN
6'-2' LIQUID DEPTH (���>MU e- 30"
41 acs,} o -I I
1
Q: O
° u BOTTOM ON LEVEL STABLE BASE91a
v
36 MAX. - 12 MIN. COVER
D -BOX AND USE EPDXY RESIN FOR WATER
TIGHT SEAL. / 2% MIN. FINISH GRADE � 4' MIN. LOAM &SEED
7. FILL ALL UNUSED KNOCKOUTS HATH MORTAR. LOAM &SEED DISTURBED AREAS
714�
MM L
6• L2` MIN. OF 1/8" TO
° ,e �?pa�ape� a •�p�hj"p"�� 1/•1• WASHED STONE
i`d as e a .ao�e a s♦ %6 ��^o eQa? e e
� 3/4" TO 1-1/2" DOUBLE •C'�iiX.�/9� � ', �ii,� ,'�9�J/�: •C" 9.�i1_.� .�
PLAN VIEW ,��' \\ I _g•� I WASHED STONE (NO FINES) r�
6' M1/ 3/4` To CROSS-SECTION VIEW
t 1/2" STONE PLAN MEW CROSS-SECTION
DESIGN CRITERIA:
CB/LEADED
o DESIGN FLOW:
O
S S 3 BEDROOMS AT110G.P.B./D 330 G.P.D.
` rj
N
\ S'TO �/ \ Z
REQUIRED SEPTIC TANK:
BENCHMARK: \� C'�Q \ \ !� �' 330 X 200% = 660 GAL.
TOP OF CONC. AFF SEPTIC TANK PROVIDED: _90 AL.
BOUND EL. 10.59 �!/J
N.G.V.D. \ tJ
HIGH POINTJIN SIZE OF LEACHING FACILITY REQUIRED:
� CONCTRACTOR TO BE CB/L AD � ROAD. EL.EV
0 AWARE OF OHW D -BOX PLU \ \ \ DESIGN PERC. RATE: <6 MIN./ INCH
a N/F (OVERHEAD WIRE) V1 X 10.6 !\� ` 10.8 NGVD
OL '1' /i LONG TERM APPL. RATE 0.70
MICHAEL KACZMAREK Ri. F`0 G.P.D/S.F.
00 ASSESSORS MAP 29 PROPOSED H-20GIF
y PARCEL 127 1,500 GALLON MIN 00, I\01 O \ 330 GPD 0.70 GPD/SF = 472 S.F,
0 SEPTIC TANK /i
In pyw / ° CONCTRACTOR TO BE
FA\` \ AWARE OF OHW
LIMITS OF 000 TEST IT
(OVERHEAD WIRE) SIZE OF LEACHING FACILITY PROVIDED:
EXCAVATION
SEE
EAND 6S
5� - OO 43o /s tiF NW � 330 GPD -'0.70 SF/GPD = 472 S.F.
PAUL D. GOODRICH
ASSESSORS MAP 29
PARCEL 118
I q
• ''- • Lp ' - 5, ' • �� uPLT BOTTOM = 15' x 32' = 480 S.F
3 1p� /// \ •.� . S � \ 480 S.F X 0.70 GPD/SF = 336 GPD
// ' / •/ -- gip, \ \
C.O. \-�.
/ \ \ 12" OAK- . •
F��PG�/ ` � 1•°••• • PSS ••?' \ LOCUS INFORMATION
�09slB9 \�MI
REMOVE &REPLACE
EXISTING WATER
LINE
OF
N/F
S-
/ 9S'
-I • / � �s,
• -�O OSS, \
•° 9� �
USE LEACHING FIELD
CB/LEAD r PLUG ro
ri / / \ / / \c�`S`!!•L \ 9 / . • 1?:. Alf � B CURRENT OWNER: LAUREL MILLS
TITLE REFERENCE: DEED BOOK 16017PAGE 325
LAUREL MILLS / < EXISTING 3 BEDROOM \ / 9PLAN REFERENCE: BOOK 33, PAGE 63
/ ASSESSORS MAP 29 \ DWELLING TO BE / k.
PARCEL 126 0 \ REMOVED & REPLACED / �p�/ p�� 0 �� \ FJ \ \ ASSESSORS
MAP: 29
5,400±S.F. / \\ 'p. \\ WITH A NEW // / G opt` MIN P� \
26
�9f \ _0 �p \ 3 BEDROOM DWELLING / / '� CB
CPLUG B/LEAOFF \\+ FO PROP. TOF 12.3 / /i O� PCO \ ZONING DISTRICT: FRONT
EXISTING \r'Iq,OF \ / � c�� SETBACKS: FRONT 30'
S LEACHING AREA \ CI \\QG \ REAR 20SIDE ,
Tw. TO BE LOCATED AND \ { \ /
`�O• ABANDONED IN \ \ \ /O \ MINIMUM LOT SIZE: 25,000 S.F.
00 ACCORDANCE WITH / Ch' O 00 r \
TITLE V EXIST. TOTAL LOT AREA: 5,400 S.F.
F �9 ��`' oo' 0 0
Oy9/ / 4bS� •8 o \ OVERLAY DISTRICT: NOT IN A ZONE II
00 / ? FEMA v \ \ FLOOD
ZONE DISTRICT: ZONE A-12 (ELEVATION 12)
PANEL #250015 0005 D
F,yO� `L� /�O�P P�k,� 6.2 r r PROP. LOT COVERAGE:
(DWELLING & DECK) 1,131± S.F. (217.)
GO gkh N/Fb :o
N/F 00' Kgs FRANCES RAND -SHAW
"RONALD C. YATES LIFE EST.
ASSESSORS MAP 29
PARCEL 119
5 ASSESSORS MAP 29 LOCUS PLAN: NO SCALE
PARCEL 125
V"-
ftsm
VARIANCES REQUESTED: \
N/F
DOMENICK J. ROSSETTI
TITLE V: SECTION 15.211: 1 TO ALLOW LEACHING SYSTEM TO BE 5' OFF FRONT ASSESSORS MAP 29
() PARCEL 120
PROPERTY LINES IN LIEU OF 10'.
PLAN VIEW
SCALE: 1' = 10 FEET
0 5 10 20 FT.
c YE, IA m
La CNIL
%o.46205,0
R•
FESSlO Et�G
3/ \
Z
tiQ
GR��� 9RE�R RO
��� SAGAMORe
W/NDME 5�'E
\ L❑GLIB RE ET
REVISIONS
NO. DATE DESCRIPTION
1. 4/29/08 NEW DWELLING
RELOCATE TANK
H-20 COMP.
GENERAL NOTES:
1. THIS PLAN IS FOR DESIGN AND
CONSTRUCTION OF THE SEWAGE DISPOSAL
FACILITY &NEW DWELLING LOCATION ONLY
2. ALL CONSTRUCTION METHODS AND
MATERIALS SHALL CONFORM TO MASS.
D.E.P TITLE 5 AND LOCAL BOARD
OF HEALTH REGULATIONS.
3. ALL PIPES LOCATED UNDER PAVEMENT
OR TRAVELED WAY SHALL BE SCHEDULE
40 OR EQUAL
4. THERE ARE NO KNOWN PRIVATE WELLS
LOCATED WITHIN 150 FT. OF THE
PROPOSED LEACHING FACILITY NOR
ANY KNOWN WELLS PROPOSED WITHIN
150' OF ANY KNOWN LEACHING FACILITY.
5. WITHIN LIMIT OF EXCAVATION REMOVE
ALL TOPSOIL, SUBSOIL AND OTHER
IMPERVIOUS MATERIAL
6. REPLACE WITH CLEAN WASHED SAND
OR OTHER CLEAN GRANULAR SOILS
CONFORMING TO THE FOLLOWING
SIEVE ANALYSIS:
10% (MAX) BY WT. SHALL
PASS No. 50 SIEVE
<10 % OF No. 4 SIEVE SHALL
PASS No. 100
<5 % OF No. 4 SIEVE SHALL
PASS No. 200
UNIFORMITY COEFFICIENT O No. 4
STEVE </=s.o
7. EXISTING UTILITIES WHERE SHOWN
IN THE DRAWINGS ARE APPROXIMATE.
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
COORDINATING THE PROPOSED CON-
STRUCTION ACTIVITY MATH DIG -SAFE
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
EXISTING UTILITY SYSTEM IN SERVICE.
DIG -SAFE SHALL BE NOTIFIED PER
THE STATE OF MASSACHUSETTS
STATUTE CHAPTER 82, SECTION 409
AT TEL. 1-888-344-7233. THE
ENGINEER DOES NOT GUARANTEE
THEIR ACCURACY OR THAT ALL
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES
TAKEN FROM RECORD PLANS. THE
CONTRACTOR SHALL VERIFY SIZE,
LOCATION AND INVERTS OF UTILITIES
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
8. THIS SYSTEM IS NOT DESIGNED FOR
THE USE OF A GARBAGE GRINDER.
A GARBAGE GRINDER IS NOT
RECOMMENDED DUE TO RECOGNIZED
ADVERSE IMPACTS TO THE LEACHING
FACILITY.
9. EXITING INVERTS ARE TO BE CHECKED BY
THE CONTRACTOR PRIOR TO CONSTRUCTION
THE ENGINEER IS TO BE NOTIFIED OF
ANY FBSC GROUP
IELD CHANGES THAT MAY BE
REQUIRED.
349 Route 28, Unit D
W. Yarmouth Massachusetts
02673
508 778 8919
PROJECT TITLE:
SEWAGE DISPOSAL
SYSTEM DESIGN
REPAIR
#19
SAGAMORE ROAD
W. YARMOUTH
MASSACHUSETTS
PREPARED FOR:
ROBERT BARTOLINI
35 WOODLAND ROAD
ASHLAND, MA 01721
(508) 561-7400
DATE: SEPTEMBER 25, 2002
COMP. DESIGN: K. HEALY
CHECK: B. YERGATIAN
DRAWN: K. HEALY
FIELD: D. GAZZOLO / J. McCARTIN
FILE N0. 8448-SEP.DWG
DWG N0. 5320-04
JOB NO.
SHEET 1 OF 1
4-8448.00