HomeMy WebLinkAbout20 Nantucket Ave New Patio CanopyGENERAL NOTES: 1. Accept premises as found. 2. The contractor shall field verify all conditions and dimensions prior to any work - contractor shall be responsible for all work and materials including that furnished by subcontractors. 3. Discrepancies between portions of the contract documents are not intended - contractor is to clarify with the owner any such discrepancies prior to commencing work. 4. Contractor shall report to owner any errors, inconsistencies or omissions he may discover prior to commencing work. the contractor is responsible for correcting any errors after the start of construction which have not been brought to the attention of the owner. the means of correcting any error shall frst be approved by the architect and owner_ 5. Dimensions take precedence over drawings - do not scale drawings. 6. All construction shall comply with the applicable building codes and local restrictions. 7. All electrical work shall be performed by others and shall conform to state and local requirements. 8. Do not obstruct streets, sidewalks, alleys or right-of-ways without first obtaining proper permits. 9. Contractor shall clean work areas on a daily basis so as not to accumulate debris - upon project completion contractor is to clean work areas and job site thoroughly so as to remove all construction dust and residue and debris. 10. All work shall be performed to the highest industry standards for quality workmanship - all materials shall be installed in strict accordance with the manufacturer's instructions and recommendations - materials and methods shall conform to appropriate national trade publications. 11. The owner may perform additional work that is not part of this contract with his own forces, under separate contracts and/or with other contractors - the contractors shall cooperate with the owner and other contractors and coordinate his work with the owner so that work by others may be accomplished in a timely manner. 12. The contractor shall be responsible for job safety, and shall take all necessary precautions to secure safety of workers and occupants at all times. 13. The contractor shall be responsible for and shall remedy or replace any faulty, improper or inferior materials or workmanship which shall appear within one (1) year or as otherwise specified for a specific component after the completion and acceptance of the work under this contract. 14. Finish materials shall conform to local building codes / ordinances for minimum flame spread classifications. 15. The contractor shall furnish and install all minor items which are obviously and reasonably necessay to complete any installation. \ 1 \ i \ 2 I A.01 I I SECTION H 318" = 1'- 0" 10„ z r PATIO ROOF FRAMING PLAN„ „ 1 /4 — 1 -0 FLOOR PLAN EST 11UN Cal 1 /4"= 1'-0” 1/4"=1'-0" I t Ice & Water shield U o I u= 1 .. 2x12" P. T. roof ledger flat on existing roof \ \ r` I z cl� 2x10" P.T. ledger beam cg= T7 y Co Ys" 0 stainless steel lag bolts into existing 318" = 1'- 0" 10„ z r PATIO ROOF FRAMING PLAN„ „ 1 /4 — 1 -0 FLOOR PLAN EST 11UN Cal 1 /4"= 1'-0” 1/4"=1'-0" DETAIL AT 7 12" 2" I" Beadboard 2x10" P.T. roof joists @16"o.c. Sympson strong tie beam at joi (3) 2x12" P.T. header beams (southern yellow pine grade#1) Pavers by owner 1 COLUMN DET 7 L ST'G WALL 1. o.. EPDM adhered roofing 5/" Roof sheathing Continuous soffit vent '00 12" �— J" Azek fascia and soffit Azek board fascia at perimeter of facade, color by owner Galvanised Simpson Strong Tie strap between column and header FILE COPY 6x6" P.T. wrap column with 4" Azek (optional) TOWN OF YARMOUTH REVIEWED FOR BUILDING AND ZONING CODE COMPLI- ANCE. ERRORS OR Oiv:,JISSIONS DO NOT RELIEVE THE APPLICANT FROM THE RESPONSIBILI-iY OF 'AS BUILT' COMPLIANCE. DATE: q`j3'1G / /. BUILDING OFFICWL_" Simpson Strong Tie P666 post connector to concrete. Embed in concrete as required 3Ya't 6"x6" Concrete extended up from footing 17'0 Concrete Pier ((4) #4's Vert) on 240 Bigfoot Footing. Min. 4'-0" below Finished Grade Compacted structural fill to be granular material compacted to 95% density Crushed stone fill �� GJ W. No. 7967 4� MEDFORD MA G�JyW REVISIONS: DATE: � Ice & Water shield U \/1 01 u= 1 .. 2x12" P. T. roof ledger flat on existing roof \ \ to N co Q z cl� 2x10" P.T. ledger beam cg= f—Q_J y Co Ys" 0 stainless steel lag bolts into existing F c v house wall studs (2 bolts per stud) O♦^a, -`--� W — — O EPDM adhered roofing = C — �., 5/" roof sheathing = M ^ O a ZO N \ S.S.T. joist € \ 2x10" P.T. roof joists @15' o.c. � \ \ Existin eave " Beadboard \ o O z \ DETAIL AT 7 12" 2" I" Beadboard 2x10" P.T. roof joists @16"o.c. Sympson strong tie beam at joi (3) 2x12" P.T. header beams (southern yellow pine grade#1) Pavers by owner 1 COLUMN DET 7 L ST'G WALL 1. o.. EPDM adhered roofing 5/" Roof sheathing Continuous soffit vent '00 12" �— J" Azek fascia and soffit Azek board fascia at perimeter of facade, color by owner Galvanised Simpson Strong Tie strap between column and header FILE COPY 6x6" P.T. wrap column with 4" Azek (optional) TOWN OF YARMOUTH REVIEWED FOR BUILDING AND ZONING CODE COMPLI- ANCE. ERRORS OR Oiv:,JISSIONS DO NOT RELIEVE THE APPLICANT FROM THE RESPONSIBILI-iY OF 'AS BUILT' COMPLIANCE. DATE: q`j3'1G / /. BUILDING OFFICWL_" Simpson Strong Tie P666 post connector to concrete. Embed in concrete as required 3Ya't 6"x6" Concrete extended up from footing 17'0 Concrete Pier ((4) #4's Vert) on 240 Bigfoot Footing. Min. 4'-0" below Finished Grade Compacted structural fill to be granular material compacted to 95% density Crushed stone fill �� GJ W. No. 7967 4� MEDFORD MA G�JyW REVISIONS: DATE: til D � z U \/1 01 u= 1 .. M1 = 1 F to N co Q z cl� 0 cg= f—Q_J y U> Q I F c v Q O♦^a, -`--� W O 1 = E �., Go = M ^ O a ZO N € o � AOL o O z O N O�. • s a ✓1 3 v a Q N ✓\ d •" a M m = � o = o D O t � m � C) a s o a v L O v O = v til D � z U N O>1 F— 0 h 0— O Z fn to N co Q z cl� 0 til D � z U JC 0— O v� CLO_jZ z Q O f—Q_J U> Q � W IIX UWpW O♦^a, -`--� W �. UO Q E Q 0 zi C5 M W Z ZO N `I J U) UJa CLO_jZ O f—Q_J Q � W IIX UWpW OW W Q O 111=11-0.1 "=1'-0" / it 6Z9 �e 't e,It 1 /06/2016 15:53