Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2016LOCUS CO N Q- F c�LO OO 4 G� O Q a ro / KEY: EXISTING CONTOUR: - - - - PROPOSED CONTOUR: ............. EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5 TEST HOLE: * UTILITY POLE: -o- FENCE LINE: HYDRANT: �- RETAINING WALL: e� LOCATION MAP LOT 26 (16,620 SF) ASSESSORS MAP: 142X PARCEL: 35 REQUIRED VARIANCES FROM TITLE FIVE: 1. SECTION 15.221 (7): LEACH AREA TO BE MORE THAN T BELOW GRADE (VARIANCE OF 1.0'). 2. SECTION 15.211 (1): LEACH AREA TO BE LESS THAN 20' FROM CELLAR WALL (VARIANCE OF 9'). M 16-53 SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 4 BEDROOMS AT 110 GAL / DAY = 440 GAL / DAY _j SEPTIC TANK: 440 GAL / DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK (EXISTING) LEACHING AREA: USE 3 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH STONE ALL AROUND, AS SHOWN (94.5'x 2' DEEP) SIDE AREA: (94.5'+ 21) = 189 SF (0.74) =.L40 GAUDAY BOTTOM AREA: = 438 SF (0.74) = 324 GAUDAY CAPACITY = 464 GAUDAY SEPTIC SYSTEM SECTION 2" PEASTONE OR FILTER FABRIC 40.0 COVERS WITHIN 6" 3/4" -1 1/2" OF FINISHED GRADE WASHED STONE TOP ° FOUNDATION a '7�'-m n_.77 I a m INSPECTION PORTS (2) ELEV.= 35.84 r,a r a R 3' MAX. . ........... COVER a (1' MIN) ° (EXISTING) 35.25 35.08 ELEV. ELEV. ` ' 32.84 D-BOXH H ELEV. 1500 GAL (6" STONE UNDER) 2'-4' 2-4 SEPTIC TANK (NEW) F- 3 - 500 GALLON CHAMBERS WITH -� TEE SIZES: TO BE CONFIRMED) 34.84 STONE ALL AROUND ( AS SHOWN INLET: 6" UP, 13" DOWN ELEV. (94.5' x 2' DEEP) OUTLET: 6" UP, 14" DOWN (H-20) APPROX. ELEVATION AT INLET OF EXISTING D -BOX 1 2' PROPOSED LEACH AREA DETAIL )POSED POLY LINER K T DEEP OF LINER = 35.84 I'TOM ELEVATION = 32.84 OF SEPTIC SVSTEM I.ocal septic variances. I approval is required for novations/aIterations to ctures/dwelling. h Department Date NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 39.0 ELEV. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/8" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3'. 11. FIELD SURVEY PROVIDED BY WELLER AND ASSOC., CENTERVILLE, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 13. EXISTING LEACH AREA TO BE ABANDONED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 15. THIS PLAN HAS BEEN PREPARED AS AN EMERGENCY REPAIR. IT IS A COMBINATION OF A PREVIOUS SEPTIC SYSTEM UPGRADE PLAN BY DARREN M. MEYER, R.S. AND AS -BUILT INFORMATION OBTAINED FROM THE YARMOUTH HEALTH DEPT. 16. SOIL CONDITIONS TO BE VERIFIED AT TIME OF CONSTRUCTION. THOMAS J , P.E. SITE PLAN LOCATION: 9 CROMWELL DR., YARMOUTHPORT,MA PREPARED FOR: BOB WALKER DATE: 9-9-16 REVISED: 9-15-16 SCALE: 1" = 20' BASS RIVER ENGINEERING P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048 TH-1 36.0 12" TEST HOLE LOGS ELEV. 6.. 34.3 TH-2 FILL FILL O/AHORIZON LOAMY SAND 10YR 4/13 ENGINEER: THOMAS McLELLAN, P.E. 20" WITNESS: AMY VON HONE,R.S. DATE: 9-8-16 42" PERCOLATION RATE: < 2 MIN/IN 32.5 C HORIZON MEDIUM 7/6 SAND g HORIZON LOAMY SAND 10YR 7/8 Cl HORIZON FINE SAND 72" 2.5Y 7/2 30.0 C2 HORIZON SILT LOAM 204"1 2.5Y 6/4 1 19.0 132" NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 39.0 ELEV. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/8" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3'. 11. FIELD SURVEY PROVIDED BY WELLER AND ASSOC., CENTERVILLE, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 13. EXISTING LEACH AREA TO BE ABANDONED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 15. THIS PLAN HAS BEEN PREPARED AS AN EMERGENCY REPAIR. IT IS A COMBINATION OF A PREVIOUS SEPTIC SYSTEM UPGRADE PLAN BY DARREN M. MEYER, R.S. AND AS -BUILT INFORMATION OBTAINED FROM THE YARMOUTH HEALTH DEPT. 16. SOIL CONDITIONS TO BE VERIFIED AT TIME OF CONSTRUCTION. THOMAS J , P.E. SITE PLAN LOCATION: 9 CROMWELL DR., YARMOUTHPORT,MA PREPARED FOR: BOB WALKER DATE: 9-9-16 REVISED: 9-15-16 SCALE: 1" = 20' BASS RIVER ENGINEERING P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048