Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2016N KEY: EXISTING CONTOUR: - — — - 4 PROPOSED CONTOUR: ............. '011 SWIFT gR00K RD EXISTING SPOT ELEVATION: 25.5 M BROOK RD PROPOSED SPOT ELEVATION: 25.5 WINDING TEST HOLE: * UTILITY POLE: -O- a FENCE LINE: - FRESH HYDRANT: r.nKRD RETAINING WALL: LOCATION MAP LOT 158 (9,999 SF) ASSESSORS MAP: 67 PARCEL: 259 LAND COURT CASE: 30561 B BOO RK ROp.D e of Pavement �- _ 101 9�� 79°30,20.. E 101 �i� 100.00 BENCHMARK AT' NAIL IN 16" OAK ELEVATION = 106.07 M16-37 X104 SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 2 BEDROOMS AT 110 GAL / DAY = 220 GAL / DAY. SEPTIC TANK: 220 GAL / DAY x 2 DAYS = 440 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 2 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (25'x 12.8'x 2' DEEP) SIDE AREA: (25' + 12.8') x 2 x 2 = 151 SF (0.74) =_L12 GAL/DAY BOTTOM AREA: 25'x 12.8'= 320 SF (0.74) =237 GAUDAY CAPACITY = 349 GAUDAY ELEV. SEPTIC SYSTEM SECTION d FOUNDATION 1500 GAL SEPTIC TANK (6" OF STONE UNDER OR MECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN T MAX. CVER (1-M ) ELEV. D -BOX 6" OF STONE UNDER OR MECHANICALLY COMPACTED) -GAS BAFFLE AT OUTLET TEE ELEV. t9 -C&- �:LeizI=L>�oZe* BED 104.5 GARAGE ELEV. ENGINEER: THOMAS MCLELLAN, P.E. ROOM LIVING 10" 10YR 3/1 I B HORIZON ROOM I LOAMY SAND 101.5 WITNESS: AMY VON HONE, R.S. —r DATE: 8-17-16 MUD DINING ROOM PERCOLATION RATE: < 2 MIN/IN BEDM[BATH RO OM ROOKITCHEN DECK 2" PEASTONE OR FILTER FABRIC - 3/4" - 1 1/2" WASHED STONE INSPECTION PORT /- ELEV.= 102.23 119°°°°°°° °I'1199.4 4 H ELEV. 25'x 12.8' 2 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (25'x 12.8'x 2' DEEP) TH-1 104.5 O/A HORIZON ELEV. LOAMY SAND 10" 10YR 3/1 103.7 B HORIZON PERC LOAMY SAND 101.5 36" 10YR 5/8 C HORIZON MEDIUM SAND 2.5Y 8/2 1 93.0 NO GROUND WATER ENCOUNTERED EXISTING FLOOR PLAN NOTES 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 31. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 13. EXISTING CESS POOLS ARE TO BE PUMPED AND REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. Yarrmoutdi HenithDepartment , f—APPRO �[�G ^� �nii.f' %1�/sane Date r AA SITE PLAN �I LOCATION: 29 WINDING BROOK RD., SNARMOUTH, MA PREPARED FOR: BARRY CROSSLEY DATE: 8-18-16 SCALE: 1" = 20' REVISED: 9-13-16 (MOVED LEACH AREA OUT OF ZONE 2) BASS RIVER ENGINEERING TH6MAS J. McL &AN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048