Loading...
83-1962 - Pier Ramp & FloatPLAN h'Ty FST E C -10 o� z� a� � � N Q — 1~11 � N W h � C5 � F w < N 1. HYDROGRAPHIC ELEVATION RELATIONSHIP DATA DETERMINED AND w✓~i Q: QN 2. ELEVATIONS REFER TO MLR' - 0.0. THE MEAN TIDE RANGE IN BASS RIVER IS 0 N TAKEN AS 2.8 FT. WITH MAW ELEVATION RELATIVE TO NGVD DETERMINED BY z THE MEAN TIDE LEVEL METHOD, FOR ADDITIONAL BENCHMARKLIP a INFORMATION. w(`a 3. ALL OLD PIER DEMOLITION DEBRIS SHALL BE DISPOSED OF IN CONFORMANCE i 1 inch a 20 N_ REPLACEMENT PIER - 4' WIDTH ofPIER WIDTH T a ' FOR 12' LENGTH x8• — 5!R!NCERS 7 ............ PROP.UN PROP. f o y DIA. I �'^-�. V V 12 FT. MIN. PILE V V v EMBEDMENT — 10 20 30 40 50 60 70 PROFILE A -A 1"=10' 80 214• •/ 2•4• 214• ./ 276• RAR CAP RAIL CAP 4•N• RM POST Yz4' M!DRAA 48 d DECK 2•' Drpz!NC' .318. ORAC.f. (3) 3•x8. 5TF4CERS 73'.8e^ SPOT CAP \\ \ YX SPUT CAP 10' DLA ♦S Bp PUKC TYPICAL PIER FRAME DETAILS (NO SCALE) 100 YR FLOOD t EL.=13 BASS RIVER (TIDAL) • • • MLW-0 0• 90 100 PLAN SHOWING PROPOSED RECONSTRUCTION OF A PILE SUPPORTED PIER, RAMP AND FLOAT IN BASS RIVER AT 246B PLEASANT STREET SOUTH YARMOUTH, MA PREPARED FOR ALAN M.LEVANTHAL c^ANUARY 17, 2013 SCALE - AS NOTED PREPARED BY CAPE COD ENGINEERING, INC. ROBERT M. PERRY, P.E. P.O. BOX 1517 T� b EAST DENNIS, MA 02641 LEVANTHAI_.DWG Wit. 508-385-1445 h GENERALNOTES 1. HYDROGRAPHIC ELEVATION RELATIONSHIP DATA DETERMINED AND PROVIDED BY CAPE COD ENGINEERING, INC 2. ELEVATIONS REFER TO MLR' - 0.0. THE MEAN TIDE RANGE IN BASS RIVER IS TAKEN AS 2.8 FT. WITH MAW ELEVATION RELATIVE TO NGVD DETERMINED BY THE MEAN TIDE LEVEL METHOD, FOR ADDITIONAL BENCHMARKLIP INFORMATION. 3. ALL OLD PIER DEMOLITION DEBRIS SHALL BE DISPOSED OF IN CONFORMANCE ` WITH APPLICABLE REGULATIONS DA Ng 4. CONSTRUCTION ACCESS SHALL BE PRIMARILY BY THE RIVER WITH LIMITED t sHatE ACCESS DIRECTLY THROUGH THE PROPERTY. 5. EXCAVATION SHALL BE LIMITED TO THAT NECESSARY FOR PILING INSTALLATION. NANTUCKET SOUND 6. WHERE NAVIGABLE WATER PERMITS, PILINGS SHALL BE HAMMER DRIVEN. MENIMIUM PILING EMBEDMENT DEPTH SHALL BE 12 FT. LOCUS 7. ALL HARDWARE USED FOR CONSTRUCTION SHALL BE OF HOT DIP GALVANIZED YARMOUTH, MA STEEL OR EQUAL, KEY M A P 8. ALL TIMBER USED SHALL BE CONSISTENT WITH YARMOUTH CONSERVATION COMLMIISSION REQUmEMEN1S. NO SCALE 9. SEE TYPICAL DETAILS FOR GENERAL FRAMING REQUIREMENTS. 10. DECK PLANK SPACING SHALL, BE A ML'1TMLM OF % INCH. " 11. CONSTRUCTION MATERIALS AND DEBRIS SHALL NOT BE STORED OR DISCARDED ON THE BANK OR BEACH. THE BEACH AND BUFFER ZONE SHALL BE COMPLETELY CLEARED OF ANY DEBRIS ON A DAILY BASIS. 12. RAMP AND FLOAT REMOVAL SHALL BE AT A SUITABLE OFF-SITE LOCATION. THE FLOAT SHALL, NOT BE STORED ANYWHERE WITHIN THE RESOURCE, AREAS OR THE BUTFER 9MN1:ON THE PROPERTY. 13. REFER TO ANY ORDER OF CONDITIONS ISSUED FOR THIS PROJECT BY THE YARMOUTH CONSERVATION COMMISSION AND OTHER AGENCIES FOR CONSTRUCTION SCHEDULE AND ADDITIONAL PROCEDURES AND GUIDELT. S. ofPIER WIDTH T a ' FOR 12' LENGTH x8• — 5!R!NCERS 7 ............ PROP.UN PROP. f o y DIA. I �'^-�. V V 12 FT. MIN. PILE V V v EMBEDMENT — 10 20 30 40 50 60 70 PROFILE A -A 1"=10' 80 214• •/ 2•4• 214• ./ 276• RAR CAP RAIL CAP 4•N• RM POST Yz4' M!DRAA 48 d DECK 2•' Drpz!NC' .318. ORAC.f. (3) 3•x8. 5TF4CERS 73'.8e^ SPOT CAP \\ \ YX SPUT CAP 10' DLA ♦S Bp PUKC TYPICAL PIER FRAME DETAILS (NO SCALE) 100 YR FLOOD t EL.=13 BASS RIVER (TIDAL) • • • MLW-0 0• 90 100 PLAN SHOWING PROPOSED RECONSTRUCTION OF A PILE SUPPORTED PIER, RAMP AND FLOAT IN BASS RIVER AT 246B PLEASANT STREET SOUTH YARMOUTH, MA PREPARED FOR ALAN M.LEVANTHAL c^ANUARY 17, 2013 SCALE - AS NOTED PREPARED BY CAPE COD ENGINEERING, INC. ROBERT M. PERRY, P.E. P.O. BOX 1517 T� b EAST DENNIS, MA 02641 LEVANTHAI_.DWG Wit. 508-385-1445