Loading...
HomeMy WebLinkAbout83-1963W919AS Ogdas Bupsixa epejbdn' AS 'anua aJO4S 44noS 6S 1;c 0 5� �� OMAN m'N ym�<o:mm mPmm mo�Nmowa3m 0 n 0 mm 3=aSm mmn oa o�.o�m onAnly m a r.� pyo m�mj.3m<'? m o _mmoam o'm rn'� .: m0 T Omo. �aJ;^m»�o� mvrnsFn- F.o a�nm 33To 0ymaoomw O- n_ mxc 0 3m j�p-c moo a '?m=a- 3.._m m�� m�.cdooi-ma 0 IM �j FIRST FLOOR 8'3 4" DIA. PVC ELEVATION - 9.52' GRAVITY SEWER -� MIN. 1/4" PER FT. PITCH EXISTING SEWER UNE NEOPRENE BC 5 5't IN ELEV. 3.67' ELEV. 2.5' ELEV HIGH GROUNDWATER ELEVATION HIGH GROUNDWATER ELEVATION 2.5' TAKEN FROM ON SITE MONITORING WELL FROM 2/10/13 UNTIL 2/19/13 NEOPRENE BOOT Iff 3,500 GALLON 7'x17' REINFORCED CONCRETE H-20 TIGHT TANK r DRIVE INSTALL N DIAMETER AND BO RISER AND ,/'ZZ1BO SI�0 Q.E CAST IRON GA GRADE AND BOLTED COVER 1 rJYy� E FINISH GRADE AT ACCESS PORTS �� SEAL FLOAT CONDUIT EXISTING GRADE - 8.0'3 s�pRI VAT E) / 9' MINIMUM COVER TO ALARM Ja' MAXIMUM COVER 5 Q•t � - TIGHT TANK BUOYANCY CALCULATION: DIAMETER (H-20) RISER AND ASKETED AND BOLTED COVER GRADE AT ACCESS PORTS TANK PLAN VIEW NOT TO SCALE VOLUME OF TANK DISPLACED BY HIGH GROUNDWATER - 842 CUBIC FEET (ASSUMES TOTAL SUBMERSION) BUOYANT FORCE IN POUNDS EXERTED VERTICALLY ON TANK - 52,500 LBS. ADD 105 FACTOR OF SAFETY - 57,750 LBS. PROVIDE WATERTIGHT LOCATION OF EXISTING SEAL TO TANK TOP ---/APPROXIMATE F 8,000 LBS. (TYP.) I WATER SERVICE ' YEESLEEVE � R,0 ALARM FLOAT LEVEL EXISTING WATER LINE Mm) SEWAGE FROM CURB STOP TO INSIDE HOLDING - CRAWL SPACE TANK EXISTING PROVIDE 3 CUBIC YARDS �.RHE.� OF CONCRETE FOR BUOYANCY UTILRZES ppygAlENT p OF 'INC PROVIDE 6" COMPACTED 3,500 GALLON 7'x17' REINFORCED TIMBERS - CRUSHED STONE BASE CONCRETE H-20 TIGHT TANK I & PROPOSED 4"ay'00 Fl"E TANK PROF VIEW SCH.40 PVC GRAVITY X80 40.68 NOT TO SCALE SEWER (TVP.) �•_ - __I R. 12)- - TIGHT TANK BUOYANCY CALCULATION: DIAMETER (H-20) RISER AND ASKETED AND BOLTED COVER GRADE AT ACCESS PORTS TANK PLAN VIEW NOT TO SCALE VOLUME OF TANK DISPLACED BY HIGH GROUNDWATER - 842 CUBIC FEET (ASSUMES TOTAL SUBMERSION) BUOYANT FORCE IN POUNDS EXERTED VERTICALLY ON TANK - 52,500 LBS. ADD 105 FACTOR OF SAFETY - 57,750 LBS. EMPTY TANK WEIGHT (FROM MANUFACTURER) - 38,240 LBS. WEIGHT OF SOIL COVER ABOVE TANK - 8,000 LBS. WEIGHT OF ADDITIONAL CONCRETE - 12,150 LBS BUOYANT FORCE EXERTED ON TANK OF 57,750 LBS. IS LESS THAN TOTAL WEIGHT OF 3.500 GALLON TANK AND SOIL COVER AND CONCRETE (58,390 LBS.) OK TO USE 3-500 GAILDN H - 2Q TI HT TANK MIQM ABOVE FOR THIS APPLICATION 6'-0' 7'-0" PARCEL 9 A� l YlV BEDROOM 0 16TCIHEN DECK REDUCTIONS REQUESTED UNDER TITLE 5 REGULATIONS: V (310 CMR 15.405: CONTENTS OF LOCAL UPGRADE APPROVAL) „d a) 10'3 TO THE 10' MINIMUM SETBACK REQUIRED FOR PROPOSED TIGHT TANK TO ROAD PROPERTY UNE. (0't SETBACK PROVIDED) � 7 a) 7'3 TO THE 10' MINIMUM SETBACK REQUIRED FOR PROPOSED TIGHT TANK TO SIDE PROPERTY UNE. (3'3 SETBACK PROVIDED) b) 17'3 TO THE 20' MINIMUM SETBACK REWIRED FOR PROPOSED TIGHT TANK (3't SETBACK PROVIDED) TO CRAWLSPACE FOUNDATION. W 1 t i1- �•1 HIGH LEVEL ALARM SPECIFICATIONS: 1. AN AUDIO AND VISUAL HIGH WATER ALARM PANEL SHALL BE PROVIDED IN AN EASILY ACCESSIBLE LOCATION. 2. THE ALARM SHALL BE CONTROLLED BY A SINGLE FLOAT SWTCH SET TO OPERATE THE AUDIO AND VISUAL FEATURES WHEN THE TANK REACHES 3/5 CAPACITY. 3. ALL WIRING FOR THE ALARM SYSTEM SHALL BE PERFORMED BY A LICENSED ELECTRICIAN, AND INSPECTED BY THE TOWN OF YARMOUTH ELECTRICAL INSPECTOR. 4. PROPER OPERATION OF THE ALARM SHALL BE INSPECTED BY THE DESIGN ENGINEER AND REPRESENTATIVE OF THE LOCAL APPROVING AUTHORITY PRIOR TO FINAL CERTIFICATION. PRE -CAST CONCRETE TIGHT TANK SPECIFICATIONS: 1. THE PROPOSED TIGHT TANK SHALL BE CONSTRUCTED OF REINFORCED CONCRETE, WITH A H-20 DESIGN LOADING. 2. MINIMUM TANK CAPACITY SHALL BE 500% OF DAILY FLOW BUT NO LESS THAN 2,000 GALLONS. EXISTING 674 S.F. LIVING AREA INCLUDING 1 PRIVATE BEDROOM O 110gpd PER BEDROOM - 110gpd ESTIMATED DAILY FLOW. (1100gpd x 5007. - 550 GALLONS). A 3,500 GALLON TANK IS PROPOSED. 3. TANK SHALL BE PROVIDED WITH TWO 24" MINIMUM DIAMETER ACCESS PORTS LOCATED OVER INLET TEE AND OPPOSITE END OF TANK. 4. A 24" MINIMUM DIAMETER GASKETED AND BOLTED CAST IRON COVER LABELED "SEWER" SHALL BE PROVIDED TO FINISH GRADE OVER THE BOTH ACCESS PORTS IN THE PRE -CAST TANK TOP. THE CAST IRON COVERS SHALL REST ON CONCRETE RISERS SEALED TO THE TANK TOP AND CAST IRON FLANGES BY HYDRAULIC CEMENT. 5. ELECTRICAL CONDUIT PENETRATIONS THROUGH THE CONCRETE RISER OR PRE -CAST TANK FOR THE ALARM SHALL BE SEALED TO PREVENT THE INFILTRATION OF GROUND WATER. 6. THE TANK SHALL BE PROVIDED WITH A SINGLE INLET KNOCKOUT FOR A 4"DIA. INLET UNE. NO OUTLET SHALL BE PROVIDED. 7. A 4' NEOPRENE BOOT SHALL BE PROVIDED AT THE INLET KNOCKOUT OF THE PRE -CAST TANK. THE BOOT SHALL BE FITTED WITH A STAINLESS CLAMP TO PROVIDE A WATERTIGHT SEAL TO THE 4'PVC INLET UNE. 8. THE PRE -CAST TANK MANUFACTURER SHALL PROVIDE A WATERTIGHT TANK BY IMPLEMENTING SUFFICIENT METHODS FOR THE SEALING OF ALL CONCRETE SURFACES. AND SEALING OF ALL SEAMS BETWEEN TANK SECTIONS AND ANY PENETRATIONS. BOTH AT THE FACTORY AND IN THE FIELD. GENERAL NOTES: 1. THE HOLDING TANK SHOWN HAS BEEN DESIGNED IN ACCORDANCE WITH COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATION 310 CMR 15.260(2) 2. THE TIGHT TANK SHALL RECEIVE WASTE FROM ALL FIXTURES WITHIN THE EXISTING DWELLING. 3. THE DESIGN ENGINEER SHALL INSPECT THE INSTALLATION OF THE TIGHT TANK AND CERTIFY THAT IT HAS BEEN INSTALLED WATERTIGHT. CONTACT ENGINEER PRIOR TO CONSTRUCTION TO SCHEDULE INSPECTIONS. 4. NO FLOW SHALL BE DISCHARGED TO THE TIGHT TANK UNTIL THE DESIGN ENGINEER HAS CERTIFIED THE INSTALLATION TO THE LOCAL APPROVING AUTHORITY AND THE McDEP. SN Flfn 6+� S,. 5. THE TIGHT TANK SHALL BE PUMPED AT 3/5 CAPACITY BY A LICENSED SEPTAGE HAULER AND THE CONTENTS DISPOSED OF AT AN APPROVED WASTEWATER TREATMENT PLANT. et4`\y TC"OTHY JS` 6. THE OWNER SHALL RECORD THE APPROVAL ISSUED BY McDEP OR IF THE DEPARTMENT ISSUES A PRESUMPTIVE APPROVAL• THE LOCAL APPROVAL SHALL BE RECORDED AT THE REGISTRY _ .ROT!Y OF DEEDS IN THE CHAIN OF PROPERTY TITLE. ,s j IL 7. NO WELLS OR POTABLE WATER SUPPLIES EXIST WITHIN 50' OF HOLDING TANK. V. e. DATUM IS N.G. V.D. � 9. EXISTING SITE FEATURES AND TOPOGRAPHY TAKEN FROM SITE PLAN FOR DAWN KAROL PREPARED BY SLADE ASSOCIATES, INC. M /up., , iQ 10. ANY CHANGES TO THIS PLAN MUST BE APPROVED BY EAST CAPE ENGINEERING. INC. vi 11. ENGINEER TO STAKE OUT TANK LOCATION FOR CONSTRUCTION. 12. ENGINEER TO VERIFY TANK LOCATION FOLLOWING CONSTRUCTION. 13. THERE ISA 1-1/4' DIAMETER PIPE RUNNING THROUGH THE CESSPOOL, BELIEVED TO BE AN ABANDONED WATERLINE. EXCAVATE CAREFULLY TO VERIFY. APPROVED DATE BENCHMARK TOP OF FIRST FLOOR ELEVATION = 9.52' DATUM = 1929 NG VD 7WG O g�C�Y D fuRA�ONSTI? TTOr WAS BED RpG OM EXISTING CESSPOOL TO BE REMOVED EXISTING WOOD RETAINING WALL F] 1 OF INSTALL SHEET PILING DURING CONSTRUCTION FOR FOUNDATION PROTECTION AND DEWATERING -PROPOSED 3,500 GALLON H-20 CONCRETE TIGHT TANK 4AC� 404 us -REMOVE & RECONSTRUCT ^y WOOD STEPS .9� _EXISTING SINGLE FAMILY RESIDENCE (CRA WISPACE FOUNDATION) PARCEL 7 "- / `ego ue 8w� OUQ/\ S/As PROPOSED STRAW BALE DEWATERING PIT o SEA COASTAL -PARCEL 8 - 3,575 SQ. FT,.t,' O'Ni jNOTE: THE ENTRE PROJECT IS WITHIN tOOFT. OF NANTUCKET SOUND. 1 NANTUCKET / SOUND �A4 =SITE PLAN= Dr�v WASTEWATER TIGHT TANK DESIGN a r -'LOCUS: 53 SOUTH SHORE DRIVE i � a � dL 13East Cape Engineering, Inc. CIVIL ENGINEERS YARMOUTH, MA LAND SURVEYORS I I�I'F''`Q DAA REF: ASSESSOR'S MAP 19, PARCEL 8 =r{+ 4 111 44 Route 28, Orleans, Mass.Rp/ 6 (508) 255-7120 PREPARED FOR: DAWN KAROL 80A D OF HEALTH YARMOUTH MA SCALE: 1"=10' DATE: 03/21/2013 DWG:030507 REVISED: 04/02/2013 03-050 I Z Z ZO U U� TOP OF FINISH F_OOR F F Z 2 „ORIFICE SHIELD TORI! SLOTTED TYPE MANUFACTURED DY � 18.52' O 0 2 2111 CRENCO SYSTEMS INCORPORATED. W INSTALL (H-20) RISER AND 2 2 <6 ALTERNATE ORIFICE SHIELD MAY BE SUBSTITUTED ELEV. _INSTALL (H-20) 1215ER ANO COVER 30" DIAMETER COVER O oZ W W FOR THE UNIT BROWN IF APPROVED R. BE TO WITHIN 6- OF FINISH GRADE TO FINISH GRADE 4 III��L Ia. prcpU EQUIVALENT BY THE DESIGN ENGINEER. 0 O o O V' - AND ORIFlOFILTER 7IC IS SH ELD$ BEFOREBE ALLED OVER B CKFIIWNG MTHR SAND EXISTING PARKING AREA W CLEAN SAND BACKFILL 3/4 DECK BOARD (TYP.) W W j BAC"ITH pN SOVE VERB ND LAYER O FILTER FABRIC ELEVATION - 6.0'3 Z Z< 2 Z( FINISH FLOOR 7 33 2x8 TIMBER SLEEPER (TW.) 7 J3 8't 4" :SCH.40 ALL ELECTRICAL C014NECTIONS _ FLUSH WITH TO - _ FILTER F/IBRIC P OF WAU_ TOP OF WOOD BOARDWALK El_ 9.2'i TOP OF UNER/RE TAININO N'ALL EL. 9.0'3 9' MINIMLM TO BE ROUTED THROUGH PVC SI_WER 9' MINIMUM .JUNCTION BOX -SLOTTED ORIFICE 110 SCH.40 PVC FILTER FABRIC 1.00' DIAMETER BAND BACKFILL e 1'f 4" SCH.40 ` ., - -:SHIELD (TYP.) ITS ISUTION LATERAL, '(TYP. TOP OF CHAMBER E_, 8.2'3: SCH. 40 LATERAL _ 1\., PVC SEWER - : '' • - '• • 5.00' REMOVE SHINGLES ON EXISTING . C _ FOUNDATION AND PROVIDE IN •' OUT-- "' "y.'- '-•. ELEV. FLASHING AND VINYL LINER • LATERAL INVERT EL. 7.83' 01 IN ELEV. -� 20't .^_" SCH.40 - - -3.83 / 3' 3.58• uFT cHAw+ PVC FORCE MAIN o33' - _ y�1 T4 0 1-tiz ORI ICE 0111yy�vE�R 3.50' - t Br�r`�,'1 ELEV. ELEV. _� TRUE UNION 3.50'a 2D't - - 0.010.83't BOTTOM OF CHAMBER EL. 7.BO' BALL VALVE. 00 - 4' ORIFICE \ 3 4- TO 1-1/2 DOUBLE', ELEV. - 01 NVERT (TYP.) -WASHED STONE <TYP.) INSTALL INLET TEE ELEV. / (10" MIN.) ., ESTIMATED HIGH - ' GROUNDWATER 3/8" BLEEDER 2• DIA. SCH.40 --E%15TIN0/IMPORTE[) CLEAN SAND INSTALL OUTLET TEE ELEV-2.5 , PVC FORCE MAIN VINYL UNER _ WITH GAS BAFFLE 3B" CHECK VALVE (TYP.) CULTEC FIELD DRAIN CONTACTOR C4 CHAMBER STORAGE CAPACITY AeoVE PUwP LELLVEL SIMPLEX MYERS CHAMBER WIDTH 40' Bl" 27e 9AONs HIGH HEAD WASTEWATER R PUMP BOTTOM OF LINER EL. 9.0'i_ ORIFICE PUMP OPERATION TO BE CONTROLLED . � 1.00' FIELD INSTALL 113" LAYER BY FLOAT SWITCHES 11 '` : - ESTIMATED HIGH GROUNDWATER EL X2.50• DIAMETER NON -REINFORCED CONCRETE - - L (((111 ABOVE /1 BOH. 40 (MIN. 1401p cu.ft. UNIT WT 16 OPERATION SE TTM TA EXCAVATE ANO REMOVE ALL UNSUITABLE SOILS \\� LATERAL / ) BETWEEN RETAINING WALL AND FOUNDATION WALL (MEASURED FROM TANK FLOOR) �• T UNTIL CLEAN SAND ENCOUNTERED. HIGH WATER ALARM ON: -22' 7 - '• PUMP ON: 16" CONFORMING TO 310A MR MATERIAL VAVH CLEAN SAND 6" OF CRUSHED 'STONE _ SUMP (PUMP OFF) -12" . 6" OF CRUSHED STONE SOIL ABSORPTION SYSTEM (END VIEW) ORIFICE SHIELD DETAIL 1000 GALLON (H-20) CONCRETE SEPTIC TANK 5.0' 1. D. CH -20) CONCRETE PUMP CHAMBER (NOT TO SCALE) _ (NOT TO SCALE) ( (NOT TO SCALE) (NOT TO SCALE) w a p < H.O.P.E. VALVE VHF. OF RETAINING 3/4 DECK BOARD (TYP.) 4'0 SCH.40 PVC BOX (TYP.) W 4'0 SCH.4O PVC CAPPED INSPECTION ? CAPPED INSPECTION 2x'S TIMBER SLEEPER (TYP.) PORT (TIP.) PORT (TYP.) FLUSH WITH TOP OF WALL TOP OF W000 BOARDWALK EL. 9.2'3 TOP OF LINER/RETAINING WALL EL 0.0'3 L2'0 SCH.40 SLOTTED ORIFICE ' SOLID 1'e SCHAO - lY SCH.40 Q SECTIOSCH.40 PVC PVC MANIFOLD SHIELD (T.) TWEN CAMBER DISTIBUON LATERAL CLEAN BANp BACK '1'I SWEEP P WTH NS (TYTHREADED PLUG (TYP.) TOP OF CHAMBER EL. - 8.2' 3 HU QQQ Q O Q U Q O O O Q Q Q Q O Q Q Q Q Q Q Q Q Q Q Q Q O LATERAL INVERT EL. 7.83' OPO O O O O 0Q Q Q QFIQQOQQQQ QQ 1.413, BOTTOM OF CHAMBER EL - 7 .30' 2'4 SCH-40 ORIFICE 0 INVERT TEE/ELSOW ./4ECE WITH (9 REWIRED THIS SECTION) EXISTNGAMPORED CLEAN $A (12 REQUIRED THIS SECTION) LAST 1/4' ORIFIIN EACH LATERAL 2-:1' BUSHING SHALL BEAT CROWN _ (TYP.) (1) FULL CULTEC FIELD DRAIN C014TACTOR C4 CHAMBER - -' - - (1) CUT CULTEC FIELD DRAIN CONTACTOR C4 CHAMBER - (3) CULTEC FIELD DRAIN CONTACTOR C4 CHAMBERS 30' (EFFECTIVE LENGTH 9.S) (EFFECTIVE LENGTH 24.3') '.. . BOTTOM OF LINER EL. - S.O'i ESTIMATED HIGH GROUNDWATER EL 2.90' DEEP OBSERVATION HOLE LOGS: SOIL ABSORPTION SYSTEM (SIDE VIEW) TT J�j (NOT TO ;:GALE) �g�• D� �/�LJ TEST DATE: TO BE DETERMINED - IZZ180 SHO TEST E3 Y: CHRIS DETERMINED - CERTIFIED SOIL E 0ARD F PRE -CAST CONCRETE TANK SPECIFICATIONS: 1 l"O BE DETERMINED - AGENT' FOR E)OARD OF HEALTH - C UTI., PERC RATE: IN MEDIUM SAND < 5 MINUTES PER INCH _ 1. ALL PRE -CAST CONCRETE STRUCTURES SHALL BE WATERTIGHT AND CAPABLE .7o /•r�DTTjAT J) TEST - OLE #1 ELEVATION OF WITHSTANDING AASHTO HS20 LOADING. r+ / t R 1 2. A -L SEWER LINE PENETRATIONS INTO PRE -CAST COMPONENTS SHALL BE AS l DEPTH ELEVATION HORIZON TEXTURE SHOWN ON PLANS. CONNECTIONS OF PVC PIPING TO CONCRETE STRUCTURES EXISTING SHALL 13E MADE BY THE USE OF A FLEXIBLE NEOPRENE BOOT INSTALLED N OVERHEAD P�ZOPOSED 1000 GALLON THE PRE -CAST OPENING DURING MANUFACTURE. SEALS SHALL BE OF CORRECT SIZE FOR THE PIPE DIAMETER AND INCLUDE STAINLESS STEEL CLAMPS. UTILITIES rH-20 CONCRETE 3. THE CONTRACTOR AND MANUFACTURER ARE RESPONSIBLE FOR ASSURING THAT / SEPTIC TANK APPROXIMATE LOCATION OF EXISTING / HIGHEST OBSERVED GROUNDWATER IN ON-SITE MONITORING WELL ALL PRE -CAST COMPONEN fS ARE INSTALLED WATERTIGHT. A'ATER SERVICE .� 1/4 INCH DIAMETER RENCHMARK DURING PERIOD 2/10/13 to 2/19/13) F- ���� 4. A_L CONSTRUCTION JOINTS BETWEEN PRE -CAST SECTIONS AND RISERS SHALL 34.0' x 6.7 Sq.Ft./Lin.Ft. - :227 Sc.Ft. PROPOSED > 223 Sq.Ft. REQUIRED 3. BE INSTALLED WITH BUTYL SEALS OR HYDRAULIC CEMENT. SLEEVE EMSTING WATER LINE 4. SEWAGE DISPOSAL SYSTEM DESIGN: FROM CURB STOP TO INSIDEDCE Op pA?�-D"pLA, 310 CMR 15.404: MAXIMUM FEASIBLE COMPLIANCE -APPROVALS FOR UPGR/,r)FS CRAWL SPA CENC C0 Q�7• DESIGN FLQ�y; 2 BEDROOMS e9 110 3ALLONS PER DAY PER BEDROOEA 220 GALLONS SEPTIC TANK BUOYANCY CALCULATION: (CRA WLSEACE FOUNDATION) NECK 'PrAyAS y011 - 6. •--____---•••--"--•• --- - - ry D Rpt FOR CON57' SEPTIC TANK REQUIREbIENT: BUOYANT FORCE ON TANK (ASSUMING FULLY SUBMERGED): 17,690 LB EXISTING y O 220 GALLONS x 200% - 440 GALLONS MINIMUM CAPACITY REQUIRED WEIGHT OF EMPTY TANK: 14,500 LB TIMBERS r I O rs } INSTALL 1.000 GALLON H-20 CONCRETE SEPTIC TANK WEIGHT OF SOIL COVER OVER TANK: 3,780 LB 9. MANIFOLD LENGTH: 2.0 FEET '} (REFERENCE: 310 CMR 15.404:(2)(a) - MAXIMUM FEASIBLE COMPLIANCE PROPOSED e 0 a) 6't TO THE 10' REQUIRED SETBACK FCR PROPOSED PUMP CHAMBER TO SIDE PROPERTY LINE. (4't SETBACK PROVIDED) TOTAL WEIGHT OF EMPTY TANK AND SOIL COVER (18,280LB) .SCI. 40 PVC FORCE R VIDEO) SYSTEMPROPERTY SOIL ABS C)RPT10 4 SYSTEM REQUIREMENT I EXCEEDS BUOYANT FORCE ON FULLY SUBMERGED TANK (17,6911 MAIN 68 40. 4, PERCOLATION RATE <5 MINUTES PER INCH IN MEDIUM SAND 6't TO THE 'O' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO FOUNDATION WALL. (4' SETBACK PROVIDED) 1. 12) l I 25% REDUCTION IN REQUIRED SUBSURFACE. AREA DESIGN REQUIREMENT PUMP CHAMBER BUOYANCY CALCULATION: ' EL. v 5(EL16j 20't TO THE 20' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO FOUNDATION WALL. (O' SETBACK PROPOSED) (REFERENCE: 310 CMR 15.405:(c) -- CONTENTS OF LOCAL UPGRADE APPROVAL CROWN TO ALLOW AIR WITHIN THE LATERAL TO BE PURGED DURING EACH DOSE. PROPba'ED 4"D (10.5' SECTION OF F.A.S.. IS O' FROM FOUNDATION WALL, 24.5' SECTION IS 2't FROM FOUNDATION WALL) (220 God / 0.74 Gpd/Sq.Ft.) = 297 Sq.Ft. REQUIRED AT FULL ,SIZE BUOYANT FORCE ON CHAMBER (ASSUMING FULLY SUBMERGED): 11,910 LB SCH-40 PVC GRAVITY BEDRpO THE LATERALS SHALL BE INSTALLED LEVEL TO ALLOW DRAINING FOLLOWING EACH DOSE CYCLE. C) WEIGHT OF EMPTY CHAMBER WITH ADDITIONAL CONCRETE: 9,980 LB SEWER (TYF.J O. 297 Sq.Ft. x TSIs 223 Sq.Ft. REQUIRED WITH 257 REDUCTION 3. THE FORCE MAIN SHALL BE PITCHED BACK TO THE PUMP CHAMBER TO .ALLOW COMPLETE ___ - . } - WEIGHT OF SOIL COVER OVER CHAMBER: 2,543 LB g) 5'f TO THE '�0' REQUIRED SETBACK FCR PROPOSED SEPTIC TANK TO WATERLINE. (5't SETBACK PROVIDED) 1 g3, USING CULTEC CHAMBERS IN A BED CONFIGURATION WITHOUT AGGREGATE AS SPECIFIED IN 310 CMR 15.251 (1)(e), THE SYSTEM SHALL BE SIZED ILI ---" i -.- W✓�' AN EFFECTIVE LEACHING AREA OF E.7 Sq.Ft/LIn.Ft. FOR FIELD DRAIN CONTACTOR TOTAL WEIGHT OF EMPTY CHAMBER AND SOIL COVER (12,523LB) PROPOSED STAIRS BATH FLED SYSTEM REQUIREMENT: SUBMERSIBLE SIMPLEX SEWAGE PUMP CAPABLE OF PASSING 1-Y4" SOLIDS, EXCEEDS BUOYANT FORCE ON FULLY SUBMERGED CHAMBER (1•:,91OLB) DATUM S N.G.V.D• _ AND PUMPING 65 GE- ® 19 FT. T.D.H. C4 CHAMBER. MUNICIPAL WA -ER IS AVAILABLE AND PLATFORM E'UMP MODEL SPECIFIED: 3. REFERENCE_: CERTIFICATION FOR GENERAL USE ISSUED BY MaDEP TO CULTEC, INC.REMOVE EXISTING STAIRS & 4. DESIGN LOADING FOR ALL PRE -CAST UNITS: AASHTO-H-10-44, H-20-44 WHERE VEHICLE LOADS ARE ANTICIPATED TRANSMITTAL No. W037676, REVISED DATE OF ISSUE FEBRUARY 22, 2010. PRESSURE DISTRIBUTION SYSTEM SPECIFICATIONS' OR WHEN SUBJECT TO 4 FT, OR MORE OF COVER. 5. PLATFORM IN THIS AREA 3. FORCE MAIN SHALL BE 2" DIA- SCH. 40 P.V.C. PIPE - PLACE 1C.F. OR EQUIVALENT PROPOSE SOIL ABSORPTION BED CQNFIGLRATIOP4 c'IZE 1 PERFORATION • JUTCHEN J� PROPOSED 57 D. _17-H-20 PUMP CHAMBER EXISTING CESSPOOL TO BE REM'OVE'D EXISTING WOOD RETAINING WALL 4' CON . WA _ PROPPROPOSED PRESSURE DOSED SOIL ABSORPTION SYSTEM F (1) FULL CULTEC C-4 CHAMBER & 1' (1) CUT CULTEC C-4 CHAMBER OVERALL LENGTH 9.5' PROPOSED RETAINING WALL TOP OF WALL ELEV-=9.0' PROPOSED BOARDWALK OVER SAS AREA BETWEEN HOUSE AND RETAINING WALL (REMOVABLE FOR S.A.S. MAINTENANCE) INSTALL 4FT. TALL VINYL LIAER ALONG BLOCK FOUNDATION WALL AND INSIDE OF RETAINING WALL PROPOSED PRESSURE DOSED ROOM SOIL ABSORPTION SYSTEM (3) CULTEC C-4 CHAMBERS DECK \ , OVERALL LENGTH 24.5' E3CIS�'ING BOARDiYALK - I 1 r 1 . 1 OYM)IG UNSMMABLE 1 SOILS (SEE DETAd) I ( 1 1 � D1 , ' 1 1 l- 0 OF WORK I ��IC, BEACH PARCEL CONAL PARCEL 8 3, 575 SQ. FT. f A�29�13 N1.H'N• )\� cam, ftin - ATANTUCKET SOUND PROPOSED STRAW BALE DEWATERING PIT PARCEL 7 NEF LN. LOCUS Ngo LOCUS MAP DATE East Cape Engineering, Inc. CIVIL ENGINEERS LAND SURVEYORS # 44 Route 28, Orleans, Mass. (508) 255-7120 SITE IPLAIy SANITARY SUBSURFACE SEWAGE DISPOSAL SYSTEM LOCATION:-, 53 SOUTH SHORE DRIVE YARMOUTH, MA REFERENCE: ASSESSORS MAP 19 PARCEL 8 PREPARED FOR: DAWN KAROL 1 2 3 No. Revision/Issue Date Project JOB# 03-050 Sheet 03050SSP.dwg Date 05/21/13 1 OF 1 Scale 111_10' .� 1/4 INCH DIAMETER RENCHMARK TOTA!_ LENGTH OF CULTEC FIELD DRAIN CONTACTOR C4 CHAMBER - 34.0' 2. PERFORATION SPACING: 2'-0" ON CENTER TOP OF FIRST FLOOR 34.0' x 6.7 Sq.Ft./Lin.Ft. - :227 Sc.Ft. PROPOSED > 223 Sq.Ft. REQUIRED 3. PERFORATIONS PER LATERAL: ELE{ATION = 9.52' REDUCTIONS REQUESTED UNDER TITLE 5: 4. 17 PERFORATIONS DATUM = 1909 NGVD LATERAL DIAMETER: 1 INCH DIAMETER 310 CMR 15.404: MAXIMUM FEASIBLE COMPLIANCE -APPROVALS FOR UPGR/,r)FS 5. LATERAL SPACING: 1 FT. ON CENTER EXISTING SINGLE FAMILY RESIDENCE (CRA WLSEACE FOUNDATION) (2)(a). A SEPTIC TANK WITH AN EFFECTIVE LIQUID CAPACITY PROVICING NO LESS THAN 24 HOURS 6. LATERAL LENGTH: 34.0 FEET OF RETENTION TIME OR 1000 GALLONS HAS BEEN PROVIDED WHERE A 1500 GALLON TANK IS NORMALLY REQUIRED. 7. TOTAL LATERALS: 3 LATERALS 310 <3MR 15.405: CONI-ENTS OF LOCAL UPGRADE APPROVAL 8. MANIFOLD DIAMETER: 2 INCH DIAMETER - a) 10't TO THE 10' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO ROAD PROPERTY LINE. (0' SETBACK PROVIDED) 9. MANIFOLD LENGTH: 2.0 FEET a) 10't TO THE 10' REQUIRED SETBACK FOR PROPOSED PUMP CHAMBER TO ROAD PROPERTY LINE. (O' SETBACK PROVIDED) PARCEL 9 a) 6't TO THE 10' REQUIRED SETBACK FCR PROPOSED PUMP CHAMBER TO SIDE PROPERTY LINE. (4't SETBACK PROVIDED) R VIDEO) SYSTEMPROPERTY I a) :i: SESETBACKRO 9't TO THE ';0' REQUIRED SETBACK FCR PROPOSED SOIL ABSORPTION TOS DhE PROPERTY LINE. (1SETBACK PROVID D) PRESSURE DISTRIBUTION SYSTEM NOTES: b) 6't TO THE 'O' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO FOUNDATION WALL. (4' SETBACK PROVIDED) 1. ALL ORIFICES SHALL BE LOCATED AT THE INVERT OF THE DISTRIBUTION LATERAL WITH THE b) 6't TO THE "O' REQUIRED SETBACK FCR PROPOSED PUMP CHAMBER TO FOUNDATION WALL-. (4'3 SETBACK PROVIDED) EXCEPTION OF THE DISTAL ORIFICES (1 PER LATERAL) WHICH SHALL BE LOCATED AT THE b) 20't TO THE 20' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO FOUNDATION WALL. (O' SETBACK PROPOSED) CROWN TO ALLOW AIR WITHIN THE LATERAL TO BE PURGED DURING EACH DOSE. (10.5' SECTION OF F.A.S.. IS O' FROM FOUNDATION WALL, 24.5' SECTION IS 2't FROM FOUNDATION WALL) 2. THE LATERALS SHALL BE INSTALLED LEVEL TO ALLOW DRAINING FOLLOWING EACH DOSE CYCLE. C) A 257 REDUCTION 1'0 THE REQUIRED SUBSUR=ACE SEWAGE DISPOSAL AREA DESIGN REQUIREMENT. 3. THE FORCE MAIN SHALL BE PITCHED BACK TO THE PUMP CHAMBER TO .ALLOW COMPLETE III) 7':t TO THE 50' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO MEAN HIGH WATER. (43't SETBACK PROVIDED) CRAINING FOLLOWING EACH DOSE CYCLE. g) 5'f TO THE '�0' REQUIRED SETBACK FCR PROPOSED SEPTIC TANK TO WATERLINE. (5't SETBACK PROVIDED) DOS114G PUMP SYSTEM SPECIFICATIONS: GENERAL N01ES: 1. SYSTEM REQUIREMENT: SUBMERSIBLE SIMPLEX SEWAGE PUMP CAPABLE OF PASSING 1-Y4" SOLIDS, 1. DATUM S N.G.V.D• AND PUMPING 65 GE- ® 19 FT. T.D.H. 2. MUNICIPAL WA -ER IS AVAILABLE E'UMP MODEL SPECIFIED: 3. PIPE PITCH: 1/8" PER FOOT MINIMUM ON 4" SCH. 40 PVC MYERS WHR5H 1/2HP HIGH HEAD WASTEWATER PUMP, 115 VOLT SINGLE PHASE 4. DESIGN LOADING FOR ALL PRE -CAST UNITS: AASHTO-H-10-44, H-20-44 WHERE VEHICLE LOADS ARE ANTICIPATED 2. PUMP LEVELS SHALL BE CONTROLLED BY FLOAT SWITCHES OR APPROVED EQUIVALENT. OR WHEN SUBJECT TO 4 FT, OR MORE OF COVER. 5. MINIMUM GROUND COVER OVER ALL SEWAGE LEACHING FACILITIES: (0.75) FT. 3. FORCE MAIN SHALL BE 2" DIA- SCH. 40 P.V.C. PIPE - PLACE 1C.F. OR EQUIVALENT CONCRETE THRUST BLOCKS AT ALL FORCE MAIN ANGLE POINTS. 6. THIS DESIGN DOES NOT PROVIDE FOR THE INSTALLATION OF GARBAGE GRINDERS. 4. THE CONTROL PANEL AUDIO AND VISUAL HIGH WATER ALARM SHALL BE POWERED BY 7. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH CCMM. OF' MASS. STATE ENVIRONMENTAL CODE TITLE 5. A SEPARATE CIRCUIT- FROM THE PUMP. 8. CONTRACTOR T -O NOTIFY DIG -SAFE PRIOR TO CONSTRUCTION. (1 -888 -DIG -SAFE) 5. EQUIVALENT SYSTEM COMPONENTS BY OTHER MANUFACTURERS MAY BE SUBSTITUTED ONLY UPON APPROVAL OF THE DESIGN ENGINEER. 9. NO KNCWN WELLS PROVIDING WATER FOR HUMAN CONSUMPTION ARE KNOWN TO EXIST WITHIN 100' OF PROPOSED `TOIL ABSORPTION SYSTEM. 6. ALL SYSTEM COMPONENTS ARE TO BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. ALL ELECTRICAL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICIAN UNDER A PERMIT 10. THIS SITE PL<,N IS INTENDED FOR SEWAGE SYSTEM DESIGN PURPOSES ONLY. UNDER NO C,RCUMSTANCES ARE ISSUED BY THE TOWN OF YARMOUTH. BEARINGS. DISTANCES, OR FEATURES SHOWN TO BE USED TO ESTABLISH PROPERTY LINES. 11. EXISTING SITE FEATURES INCLUDING: TOPOGRAPHY AND BUILDING LOCATION TAKEN FROM SITE PLAN DATED MARCH 19, 2013 7. A SEPARATE EXTERIOR ELECTRICAL DISCONNECT SWITCH SHALL BE PROVIDED WITHIN SIGHT PREPARED BY SLADE ASSC.CIATES, INC. FOR DAWN KAROL. DISTANCE OF THE PUMP CHAMBER TO DE -ENERGIZE THE PUMP PRIOR TO ACCESS. PROPOSED 57 D. _17-H-20 PUMP CHAMBER EXISTING CESSPOOL TO BE REM'OVE'D EXISTING WOOD RETAINING WALL 4' CON . WA _ PROPPROPOSED PRESSURE DOSED SOIL ABSORPTION SYSTEM F (1) FULL CULTEC C-4 CHAMBER & 1' (1) CUT CULTEC C-4 CHAMBER OVERALL LENGTH 9.5' PROPOSED RETAINING WALL TOP OF WALL ELEV-=9.0' PROPOSED BOARDWALK OVER SAS AREA BETWEEN HOUSE AND RETAINING WALL (REMOVABLE FOR S.A.S. MAINTENANCE) INSTALL 4FT. TALL VINYL LIAER ALONG BLOCK FOUNDATION WALL AND INSIDE OF RETAINING WALL PROPOSED PRESSURE DOSED ROOM SOIL ABSORPTION SYSTEM (3) CULTEC C-4 CHAMBERS DECK \ , OVERALL LENGTH 24.5' E3CIS�'ING BOARDiYALK - I 1 r 1 . 1 OYM)IG UNSMMABLE 1 SOILS (SEE DETAd) I ( 1 1 � D1 , ' 1 1 l- 0 OF WORK I ��IC, BEACH PARCEL CONAL PARCEL 8 3, 575 SQ. FT. f A�29�13 N1.H'N• )\� cam, ftin - ATANTUCKET SOUND PROPOSED STRAW BALE DEWATERING PIT PARCEL 7 NEF LN. LOCUS Ngo LOCUS MAP DATE East Cape Engineering, Inc. CIVIL ENGINEERS LAND SURVEYORS # 44 Route 28, Orleans, Mass. (508) 255-7120 SITE IPLAIy SANITARY SUBSURFACE SEWAGE DISPOSAL SYSTEM LOCATION:-, 53 SOUTH SHORE DRIVE YARMOUTH, MA REFERENCE: ASSESSORS MAP 19 PARCEL 8 PREPARED FOR: DAWN KAROL 1 2 3 No. Revision/Issue Date Project JOB# 03-050 Sheet 03050SSP.dwg Date 05/21/13 1 OF 1 Scale 111_10' 5.5'1 ELEV. z i w a 0 w z4 TOP OF FINISH F_OOR 77- _1).52' A ELEV. INSTALL (H-20) RISER AND COVER 1"0 WITHIN 6" OF FINISH GRAD=- 8':h RAD= 8't 4" SCH.40 9" MINIMLM PVC SEWER }- 1 IN - -3.83• / 3,. ELEV. INSTALI_ INLET TEE (10" MIN.) EXISTING PARKING AREA - 6.0'1 ESTIMATED HIGH GROUNDWATER ELEV-2.5' - ALL ELECTRICAL CONNECTIONS TO BE ROUTED THROUGH w w5/ 2 2� FINISH FLOOR J 3 CLEAN SAND BACKFILL _ W 2 4 DECK BOARD (T.) w W E2'16 TIMBER SLEEPER (T.) D FLUSH WITH TOP OF WALL w:1ELEVATION 2f j; TOP OF WOOD BOARDWALK EL - II TOP OF UNER/RE TAtNINO WALL EL. G.I - CONFORMING TO 31D CMR 15.255(D) 61" B' MINIMUM JUNCTION BOX Z 2 '/' 1'. SCH.40 PVC � FILTER FABRIC 8" OF CRUSHED STONE OF - - ptACE SEWAGE DISPOSAL SYSTEM DESIGN: SOIL ABSORPTION SYSTEM (END VIEW) INSTALL (H-20) RISER AND 2 foz F30" FIELD INSTALL 115" LAYER DIAMETER COVER 3 Y NECON D R CONSTR w E ww TO FINISH GRADE w 4"0 SCH.40 PVC POPPED INSPECTION PORT (TYP) PVC SEWER CAPPED INSPE:CTON PORT (TW.) REMOVE SHINGLES ON EXISTING bl b 0 EXISTING PARKING AREA - 6.0'1 ESTIMATED HIGH GROUNDWATER ELEV-2.5' - ALL ELECTRICAL CONNECTIONS TO BE ROUTED THROUGH w w5/ 2 2� FINISH FLOOR J 3 CLEAN SAND BACKFILL _ W 2 4 DECK BOARD (T.) w W E2'16 TIMBER SLEEPER (T.) D FLUSH WITH TOP OF WALL w:1ELEVATION 2f j; TOP OF WOOD BOARDWALK EL - II TOP OF UNER/RE TAtNINO WALL EL. G.I - CONFORMING TO 31D CMR 15.255(D) 61" B' MINIMUM JUNCTION BOX AGI P'JMP LEVEL 2741 GALLONS SLOTTED CRIFlCE '/' 1'. SCH.40 PVC � FILTER FABRIC 8" OF CRUSHED STONE OF - - ptACE SEWAGE DISPOSAL SYSTEM DESIGN: SOIL ABSORPTION SYSTEM (END VIEW) 1000 GALLON (H--20) CONCRETE SEPTIC TANK 5.00 I.D. (H-20) CONCRETE SHIELD (T1PJ III LATERAL', (TIP. FIELD INSTALL 115" LAYER TOP OF CHAMBER E_. - EI 1'f 4" SCH.40 Y NECON D R CONSTR SEPTIC TANK REQUIREMIENT: BY FLOAT SWITCHES •, ESTIMATED HIGH GROUNDWATER EL. - 2.50' `EXCAVATE ' 4Y SCH.40 PVC (IST O O 4"0 SCH.40 PVC POPPED INSPECTION PORT (TYP) PVC SEWER CAPPED INSPE:CTON PORT (TW.) REMOVE SHINGLES ON EXISTING (MIN. 1401b/Cu.Tt. UNIT WT) TOP OF WOOD BOARDWALK EL - III EXCEPTION OF THE DISTAL ORIFICES (1 PER LATERAL) WHICH SHALL BE LOCATED AT THE b) 20'1 TO THE 20' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO FOUNDATION WALL. (O' SETBACK PROPOSED) BETWEEN RETAINING WALL (MEASURED FROM TANK FLOOR) ALL AND FOUNDATION WALL 5.00' FOUNDATION AND PROVIDE PROPOSED 2'0 (10.5' SECTION OF F.A.S.. IS O' FROM ITOUNDATION WALL, 24.5' SECTION IS 2't FROM FOUNDATION WALL) (REFERENCE: 310 CMR 15.404:(2)(a) - MAXIMUM FEASIBLE COMPLIANCE OUT- -. -'-:l ELEV. FLASHING AND VINYL LINER SOIL ABSQRPTION SYSTEM REQUIREMENT: EXCEEDS BUOYANT FORCE ON FULLY SUBMERGED TANK (17,6901-13) MAIN LATERAL INVERT Z63' PERCOLATION RATE <5 MINUTES PER INCH IN MEDIUM SAND IN 20'1 2" SCH.40 g) 257 REDUCTION IN REQUIRED SUBSURFACE AREA DESIGN REQUIREMENT � 3.58' LIFT CHAIN PVC FORCE MAIN 203 .:- PROPb5EO 4"m 0.83't BOTTOM OF CHAMBER EL. - 7.50' ELEV. 3.50' _� TRUE UNION 3.50'a 1 (220 Gpd / 0.74 Gpd/Sq.Ft.) = 297 Sq.Ft. REQUIRED AT FULL ,SIZE: 0 0• SEWER (TIP.) MUNICIPAL WA -ER IS AVAILABLE ° INSTALL OUTLET TEEP WITH GAS BAFFLE (14" MIN.)STORAGE ESTIMATED HIGH GROUNDWATER ELEV-2.5' ELEV ALARM 01 3B• BALL VALVE-. 3/8" BLEEDER` I CHECK VALVE CAPACITY �- f -.• 00 1/4 ORIFICE 3/4 TO 1-1/2 DOUBLE ELEV. ., O INVERT (TW) ...WASHED STONE (TYP) •2" DIA. SCH.40 YL LINER ' !-EXISTNO/IMPOR TED CLEAN SAND�3 PVC FORCE MAIN (TW.) - STI ." "50' CULTEC FIELD DRAIN CONTACTOR C4 -CHAMBER CHAMBER WIDTH ♦ O' OFF) 12" CONFORMING TO 31D CMR 15.255(D) 61" {T �. �.�_ -_ _' A'D" AGI P'JMP LEVEL 2741 GALLONS o) SIMPLEX MYERS 'NNRSH BOTTOM OF LINER EL. 3.0'!: HIGH HEAD WASTEWATER PUMP 8" OF CRUSHED STONE OF - - ptACE SEWAGE DISPOSAL SYSTEM DESIGN: SOIL ABSORPTION SYSTEM (END VIEW) 1000 GALLON (H--20) CONCRETE SEPTIC TANK 5.00 I.D. (H-20) CONCRETE PUMP OPERATION TO BE CONTROLLED CHAMBER FIELD INSTALL 115" LAYER (NOT TO SCALE) (NOT TO SCALE) Y NECON D R CONSTR SEPTIC TANK REQUIREMIENT: BY FLOAT SWITCHES •, ESTIMATED HIGH GROUNDWATER EL. - 2.50' `EXCAVATE ' 4Y SCH.40 PVC NON -REINFORCED CONCRETE O O 4"0 SCH.40 PVC POPPED INSPECTION PORT (TYP) 18' CAPPED INSPE:CTON PORT (TW.) OPON SETTINGS: AND REMOVE ALL UNSUITABLE SOILS b) (MIN. 1401b/Cu.Tt. UNIT WT) TOP OF WOOD BOARDWALK EL - III EXCEPTION OF THE DISTAL ORIFICES (1 PER LATERAL) WHICH SHALL BE LOCATED AT THE b) 20'1 TO THE 20' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO FOUNDATION WALL. (O' SETBACK PROPOSED) BETWEEN RETAINING WALL (MEASURED FROM TANK FLOOR) ALL AND FOUNDATION WALL WEIGHT OF SOIL COVER OVER TANK: 3,780 LB -. PROPOSED 2'0 (10.5' SECTION OF F.A.S.. IS O' FROM ITOUNDATION WALL, 24.5' SECTION IS 2't FROM FOUNDATION WALL) (REFERENCE: 310 CMR 15.404:(2)(a) - MAXIMUM FEASIBLE COMPLIANCE TOTAL WEIGHT OF EMPTY TANK AND SOIL COVER (18,280LB) UNTIL CLEAN SANG ENCOUNTERED. " ' '' - �_' •' - "`Y ' ''' I I '+ I •= I HIGH WATER ALARM 01 REPLACE ALL EXCAVATED MATERIAL PATH CLEAN SAND 4. A -L CONSTRUCTION JOINTS BETWEEN PRE -CAST SECTIONS AND RISERS �- f -.• PUMP ON: SUMP (PUMP OFF) 12" CONFORMING TO 31D CMR 15.255(D) 6" OF CRUSHED ST ONE {T �. �.�_ -_ _' A'D" MANIFOLD DIAMETER: 2 INCH DIAMETER o) 10'f' TO THE 10' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO ROAD PROPERTY LINE. (O' SETBACK PROVIDED) 8" OF CRUSHED STONE OF - - ptACE SEWAGE DISPOSAL SYSTEM DESIGN: SOIL ABSORPTION SYSTEM (END VIEW) 1000 GALLON (H--20) CONCRETE SEPTIC TANK 5.00 I.D. (H-20) CONCRETE PUMP CHAMBER (NOT TO SCALE) . (NOT TO SCALE) (NOT TO SCALE) Y NECON D R CONSTR SEPTIC TANK REQUIREMIENT: BUOYANT FORCE ON TAINK (ASSUMING FULLY SUBMERGED): 17,Ei90 LB ' 4Y SCH.40 PVC W 5/4 DECK BOARD (T.) {TW.) O O 4"0 SCH.40 PVC POPPED INSPECTION PORT (TYP) H.D. P.E. 'VALVE WLINE: OF RETAINING BOX ,T.) CAPPED INSPE:CTON PORT (TW.) lye TIMBER SLEEPER FLUSH PATH TOP OF WALL b) 6't TO THE '.O' REQUIRED SETBACK FCR PROPOSED PUMP CHAMBER TO FOUNDATION WALL.. (4't SETBACK PROVIDED) TOP OF WOOD BOARDWALK EL - III _ ��� ,,,•., ..�_ TOP OF UNER/RETAINING WALL EL - 0.0'3 SCH.40 SLOTTED ORIFICE - SOLID 1"4 SCHAD 1'. SCH.40 P11111-1'VC N MA1: 1: SHIELWL D (T.) PVC BETWEEN CHAMBER DISTRIBUTION LATERA - CLEAN SAND BACKFILL 1'41 SWEEP WITH SECTIONS (TW.) THREADfZD PWG (TYP.) TOP OF CHAMBER EL - 6.2'3 O O O Q O 0 O O 0 O O O 0 O - CRIFICE SHIELD TO BIC SLOTTED TWE MANUFACTURED BY - ORENCO SYSTEMS INCORPORATED. ALTERNATE ORIFICE SHIELD MAY BE SUBSTITUTED FDR THE UNIT SHOWN IF APPROVED TO BE EDUIVALENT BY THE DESIGN ENGINEER. --.--� FILTER FABRIC IS TO BE INSTALLED OVER LATERALS AND ORIFICE SHIELDS BEFORE BACKFILLING W MH SAND BACKFILL OVER LAYER OF FILTER FABRIC WITH ON-SITE SAND FELL Se WAMPANOAG ptE. RD. 3 . FILTER F,0BRIC \ 1.00" DIAMETER SANG BACKFILL1' E:CH..40 LATERAL _ NEPTUNE W' is y f a c i > ISI O O /�o,�, 1�y ORIFICE OI VER y� £ /3/4' TO t-1/2 C y A SOUTH SHORE d`_0 ORIFICE DRIVE 01� 1.00' LOCUS 1a SOJ DIAMETER OVE // SCM. 40 - i/LATERAL LOCUS MAP ORIFICE SHIELD DETAIL (NOT TO SCALE) LATERAL INVERT EL. - 7.83' 0 0 0=0 ° o 0 o Q o 0 0 o O o 0 0 0 0 0 0 0 o Q Q o 0 11 1.63' BOTTOM OF CHAMBER EL. 7.50_' III"4 SCH.401/4" ORIFICE: O INVERT (TW.) 1/4' ORIFICE O INVERT (TW.) ,. -EE/ELBOW 'MTM (5 REQUIRED THIS SECTION) EXISTNGAMPORTED CLEAN SANG (11 REQUIRED THIS SECTION) - LAST J/4' ORIFICE IN EACH LATERAL SHAUI AT CRO WN, (TYP.) (1) FULL CULTEC FIELD DRAIN CONTACTOR C4 CHAMBIER- - (1) CUT CULTEC FIELD DRAIN COE.TACTOR C4 CHAMBER _.(3) CULTEC FIELD DRAIN CONTACTOR C4 CHAMBERS - . (EFFECTIVE LENGTH 9A') (EFFECTIVE LENGTH 24.5') 5'O' BOTTOM OF LINER EL 5.0'3 ESTIMATED HIGH GROUNDWATER EL. 2.50' SOIL ABSORPTION SYSTEM (SIDE VIEW) DEEP OBSERVATION HOLE LOGS: (NOT TO SCALE) ���yyy.�'f DRIVE I TEST DATE: TO BE DETERMINED .. }'22/90 � /�/ O�j� TEST BY: CHRIS WICKSON' - CERTIFIED SOIL EVALUA-'OR PRE -CAST CONCRETE TANK SPECIFICATIONS: (MI T 11 TO BE DETERMINED - AGENT FOR BOARD OF HEALTH(/''J� ( T1}r{T PERC RATE: IN MEDIUM SAND < 5 MINUTES PER INCH 1. ALL PRE -CAST CONCRETE STRUCTURES SHALL BE WATERTIGHT AND CAPABLE s\,/ pRI 17A TE) OF WITHSTANDING AASHTO HS20 LOADING. / 1 Ll TESTHOLE #1 ELEVATION ll` 2. A_L SEWER LINE PENETRATIONS INTO PRE -CAST COMPONENTS SHALL BE AS DEPTH ELEVATION HORIZON TEXTURE SHOWN ON PLANS. CONNECTIONS OF PVC PIPING TO CONCRETE STRUCTURES EXISTING SHALL BE MADE BY THE USE OF A FLEXIBLE NEOPRENE BOOT INSTALLED IN OVERHEAD PPOPOSED 1000 GALLON THE PRE -CAST OREP41NG DURING MANUFACTURE. SEALS SHALL BE OF CORRECT SIZE FOR THE PIPE DIAMETER AND INCLUDE STAINLESS STEEL CLAMPS. UTILITIES H-20 CONCRETE 3. THE CONTRACTOR AND MANUFACTURER ARE RESPONSIBLE FOR ASSURING THATSEPTIC TANK APPROXIMATE LOCATION OF EXISTING HIGHEST OBSERVED GROUNOWATER IN ON-SITE MONITORING WELL e ALL PRE -CAST COMPONENTS ARE INSTALLED WATERTIGHT. A'ATER SERVICE 1/4 INCH DIAMETER 2'-0" ON CENTER 17 PERFORATIONS DURING: PERIOD 2/10/13 to 2/19/13) 4. A -L CONSTRUCTION JOINTS BETWEEN PRE -CAST SECTIONS AND RISERS SHALL 4. 5. LATERAL DIAMETER: LATERAL SPACING: P1 FVATION -, 2,5' BE INSTALLED WITH BUTYL SEALS OR HYDRAULIC CEMENT. SLEEVE EXISTING WATER LINE FROM CURB STOP TO INSIDE _' A'D" MANIFOLD DIAMETER: 2 INCH DIAMETER o) 10'f' TO THE 10' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO ROAD PROPERTY LINE. (O' SETBACK PROVIDED) E OF - - ptACE SEWAGE DISPOSAL SYSTEM DESIGN: 10'1 TO THE 10' REQUIRED SETBACK FOR PROPOSED PUMP CHAMBER I'D ROAD PROPERTY LINE. (O' SETBACK PROVIDED) CRAWL SPACE ---`j ov s Cpg,91, S ya DAlll• DEcIGN FLOW: 2 BEDROOMS C9 110 GALLONS PER DAY PER BEDROOM 220 GALLONS SEPTIC TANK BUOYANCY CALCULATION: ____..._--••"""'. Jr. V Y NECON D R CONSTR SEPTIC TANK REQUIREMIENT: BUOYANT FORCE ON TAINK (ASSUMING FULLY SUBMERGED): 17,Ei90 LB EXISTING 9't TO THE 50' REQUIRED SETBACK FCR PROPOSED SOIL ABSORPTION TO SIDE PROPERTY LINE. (1't SETBACK: PROVIDED) O O 220 GALLONS x 2001 - 440 GALLONS MINIMUM CAPACITY REQUIRED WEIGHT OF EMPTY TANK: 14,500 LB TIMBERS I b) 6't TO THE '.O' REQUIRED SETBACK FCR PROPOSED PUMP CHAMBER TO FOUNDATION WALL.. (4't SETBACK PROVIDED) EXCEPTION OF THE DISTAL ORIFICES (1 PER LATERAL) WHICH SHALL BE LOCATED AT THE b) 20'1 TO THE 20' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO FOUNDATION WALL. (O' SETBACK PROPOSED) INSTALL 1,000 GALLON H-20 CONCRETE SEPTIC TANK WEIGHT OF SOIL COVER OVER TANK: 3,780 LB -. PROPOSED 2'0 (10.5' SECTION OF F.A.S.. IS O' FROM ITOUNDATION WALL, 24.5' SECTION IS 2't FROM FOUNDATION WALL) (REFERENCE: 310 CMR 15.404:(2)(a) - MAXIMUM FEASIBLE COMPLIANCE TOTAL WEIGHT OF EMPTY TANK AND SOIL COVER (18,280LB) ,SCH.40 PVC FORCEs' 2. THE LATERALS SHALL. BE INSTALLED LEVEL TO ALLOW DRAINING FOLLOWING EACH DOSE CYCLE. SOIL ABSQRPTION SYSTEM REQUIREMENT: EXCEEDS BUOYANT FORCE ON FULLY SUBMERGED TANK (17,6901-13) MAIN 40.68 All PERCOLATION RATE <5 MINUTES PER INCH IN MEDIUM SAND 7':1: TO THE 50' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO MEAN HIGH WATER. (43'1 SETBACK PROVIDED) I Al2 EL 12 g) 257 REDUCTION IN REQUIRED SUBSURFACE AREA DESIGN REQUIREMENT : PUMP CHAMBER BUOYANCY CALCULATION. � V15i EL'16F , �1, '.. (REFERENCE: 310 CMR 15.40:i: (c) -• CONTENTS OF LOCAL UPGRADE APPROVAL GENERAL NOTES: PROPb5EO 4"m BUOYANT FORCE ON CHAMBER (ASSUMING FULLY SUBMERGED): 11,910 LB SCH.40 PVC GRAVITY t?E DROOM 1 (220 Gpd / 0.74 Gpd/Sq.Ft.) = 297 Sq.Ft. REQUIRED AT FULL ,SIZE: AND PUMPING 65 GPM HID 19 FT. T.D.H. SEWER (TIP.) MUNICIPAL WA -ER IS AVAILABLE ° E'UMP MODEL SPECIFIED: WEIGHT OF EMPTY CHAMBER WITH ADDITIONAL CONCRETE: 9,980 LB PIPE PITCH: 1/8" PER FOOT MINIMUM ON 4" SCH. 40 PVC MYERS WHR5H 1/2HP HIGH HEAD WASTEWATER PUMP, 115 VOLT SINGLE PHASE 297 'Sq.Ft. x 757.223 Sq.Ft. REQUIRED WITH 25% RIEDUCTION DESIGN LOADING FOR ALL PRE -CAST UNITS: AASHTO-H-10-44, H-20-44 WHERE VEHICLE LOADS ARE ANTICIPATED 2. -�- _ 1•g3 } OR WHEN SUBJECT TO 4 FT, OR MORE OF COVER. WEIGHT OF SOIL COVER OVER CHAMBER: 2,543 LB _ - USING CULTEC CHAMBERS IN A BED CONFIGURATION WITHOUT AGGREGATELLQ FORCE MAIN SHALL BE 2" DIA. SCH. 40 P.V.C. PIPE - PLACE 1C.F. OR EQUIVALENT 5. BATH WALL AS SPECIFIED IN 310 CMR 15.251 (1)(e), THE SYSTEM SHALL BE SIZED USING TOTAL WEIGHT OF EMPTY CHAMBER AND SOIL COVER (12.523LB) PROPOSED STAIRS 4. B AN EFFECTIVE LEACHING AREA OF E.7 Sq.1=t/LIn.Ft. FOR FIELD CRAIN CONTACTOR. EXCEEDS BUOYANT FORCE ON FULLY SUBMERGED CHAMBER (1'„91OLB) AND PLATFORM .- - _ 2' C4 CHAMBER. 5. EQUIVALENT SYSTEM COMPONENTS BY OTHER MANUFACTURERS MAY BE SUBSTITUTED ONLY REFERENCE: CERTIFICA"PION FOR GENERAL USE ISSUED 3Y MaDEP TO CULTIC, INC. UPON APPROVAL OF THE DESIGN ENGINEER. REMOVE EXISTING STAIRS & NO KNCWN WELLS PROVIDING WATER FOR HUMAN CONSUMPTION ARE KNOWN TO EXIST WITHIN 100' OF PROPOSED TRANSMITTAL No. WO37676, REVISED DATE OF ISSUE FEBRUARY 22, 2010, PRESSURE DISTRIBUTION SYSTEM SPECIFICATIONS: PLATFORM IN THIS AREA N ALL SYSTEM COMPONENTS ARE TO BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. SOil ABSORPTION BED CONFIGL RATIOP4 c- �TC1�E 10. IZJ EG-� TOTAL LENGTH OF CULTEC FIELD DRAIN CONTACTOR C4 CHAMBER - 34.0' 34.0'F►xP76.7 Sq.Ft./LIn.Ft. = 227 Sc.Ft. PROPOSED > 223 Sq.Ft. REQUIRED 1. 2. 3. PERFORATION SIZE. PERFORATION SPACING: PERFORATIONS PER LATERAL: 1/4 INCH DIAMETER 2'-0" ON CENTER 17 PERFORATIONS $ENCHMARK TOP OF FIRST FLOUR ELEVATION = 9.52' DATUM = 1929 NGVD Lfyfl<fG � 10009 DECK '!REDUCTIONS' REQUESTED UNDER 'TITLE 5: '', 31 O ('MR 15 404'. MAXIMUM FEASIBLE COMPLIANCE -APPROVALS FOR UPGRADES 4. 5. LATERAL DIAMETER: LATERAL SPACING: 1 INCH DIAMETER 1 FT. ON CENTER EXISTING SINGLE FAMILY RESIDENCE (CRA WLSPACE FOZINDATION) BO�Di4A STING (2)(a). A SEPTIC TANK WITH AN EFFECTIVE. LIQUID CAPACITY PROVICING NO LESS THAN 24 HOURS 6. LATERAL LENGTH: 34.0 FEET OF RETENTION TIME OR 1000 GALLONS HAS BEEN PROVIDED WHERE A 1500 GALLON TANK IS NORMALLY REQUIRED. 1 7. TOTAL LATERALS: 3 LATERALS 310 0R 15.405CONTENTS OF LOCAL' UPGRADE APPROVAL 8. MANIFOLD DIAMETER: 2 INCH DIAMETER o) 10'f' TO THE 10' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO ROAD PROPERTY LINE. (O' SETBACK PROVIDED) 9. MANIFOLD LENGTH: 2.0 FEET a) 10'1 TO THE 10' REQUIRED SETBACK FOR PROPOSED PUMP CHAMBER I'D ROAD PROPERTY LINE. (O' SETBACK PROVIDED) PARCEL 9 a) 6't TO THE ':O' REQUIRED SETBACK. FOR PROPOSED PUMP CHAMBER TO SIDE PROPERTY LINE. (4't SETBACK PROVIDED) 4't TO THE `O' REQUIRED SETBACK. FOR PROPOSED SOIL ABSORPTION SYSTEM TO ROAD PROPERTY LINE. (6'f: SETBACK PROVIDED) o) 9't TO THE 50' REQUIRED SETBACK FCR PROPOSED SOIL ABSORPTION TO SIDE PROPERTY LINE. (1't SETBACK: PROVIDED) PRESSURE DISTRIBUTION SYSTEM NOTES: b) 6't TO THE '0' REQUIRED SETBACK' FOR PROPOSED SEPTIC TANK TO FOUNDATION WALL. (4' SETBACK ZROVIDED) 1. ALL ORIFICES SHALL BE LOCATED AT THE INVERT OF THE DISTRIBUTION LATERAL WITH THE b) 6't TO THE '.O' REQUIRED SETBACK FCR PROPOSED PUMP CHAMBER TO FOUNDATION WALL.. (4't SETBACK PROVIDED) EXCEPTION OF THE DISTAL ORIFICES (1 PER LATERAL) WHICH SHALL BE LOCATED AT THE b) 20'1 TO THE 20' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO FOUNDATION WALL. (O' SETBACK PROPOSED) CROWN TO ALLOW AIR WITHIN THE: LATERAL TO BE PURGED DURING EACH DOSE. (10.5' SECTION OF F.A.S.. IS O' FROM ITOUNDATION WALL, 24.5' SECTION IS 2't FROM FOUNDATION WALL) 2. THE LATERALS SHALL. BE INSTALLED LEVEL TO ALLOW DRAINING FOLLOWING EACH DOSE CYCLE. c) A 25% REDUCTION 1-0 THE REQUIRED SUBSUR=ACE SEWAGE: DISPOSAL AREA DESIGN REQUIREMENT. 3. THE FORCE MAIN SHALL BE PITCHED BACK TO THE PUMP CHAMBER TO ALLOW COMPLETE f) 7':1: TO THE 50' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO MEAN HIGH WATER. (43'1 SETBACK PROVIDED) CRAINING FOLLOWING EACH DOSE CYCLE. g) 5't TO THE `IO' REQUIRED SETBACK FCR PROPOSED SEPTIC TANK TO WATERLINE. (5t SETBACK PROVIDED) DOS114G PUMP SYSTEM SPECIFICATIONS: GENERAL NOTES: 1. SYSTEM REQUIREMENT: SUBMERSIBLE SIMPLEX SEWAGE PUMP CAPABLE OF PASSING 1.-W, SOLIDS, 1. DATUM S N.G.V.D. AND PUMPING 65 GPM HID 19 FT. T.D.H. 2. MUNICIPAL WA -ER IS AVAILABLE E'UMP MODEL SPECIFIED: ''. 3. PIPE PITCH: 1/8" PER FOOT MINIMUM ON 4" SCH. 40 PVC MYERS WHR5H 1/2HP HIGH HEAD WASTEWATER PUMP, 115 VOLT SINGLE PHASE 4. DESIGN LOADING FOR ALL PRE -CAST UNITS: AASHTO-H-10-44, H-20-44 WHERE VEHICLE LOADS ARE ANTICIPATED 2. PUMP LEVELS SHALL BE CONTROLLED BY FLOAT SWITCHES OR APPROVED EQUIVALENT. OR WHEN SUBJECT TO 4 FT, OR MORE OF COVER. 3. FORCE MAIN SHALL BE 2" DIA. SCH. 40 P.V.C. PIPE - PLACE 1C.F. OR EQUIVALENT 5. MINIMUM GROUND COVER OVER ALL SEWAGE LEACHING FACILITIES: (0.75) FT. CONCRETE THRUST BLOCKS AT ALL FORCE MAIN ANGLE POINTS. 6. '. THIS DESIGN DOES NOT PROVIDE FOR THE INSTALLATION OF GARBAGE GRINDERS. 4. THE CONTROL PANEL AUDIO AND VISUAL. HIGH WATER ALARM SHALL BE POWERED BY '.. 7. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH CCMM. OF MASS. STATE ENVIRONMENTAL CODE TITLE 5. A SEPARATE CIRCUIT FROM THE PUMP. 8. CONTRACTOR 1'0 NOTIFY OIC -SAFE PRIOR TO CONSTRUCTION. (1 -888 -DIG -SAFE) 5. EQUIVALENT SYSTEM COMPONENTS BY OTHER MANUFACTURERS MAY BE SUBSTITUTED ONLY UPON APPROVAL OF THE DESIGN ENGINEER. 9. NO KNCWN WELLS PROVIDING WATER FOR HUMAN CONSUMPTION ARE KNOWN TO EXIST WITHIN 100' OF PROPOSED SOIL ABSORPTION SYSTEM. 6. ALL SYSTEM COMPONENTS ARE TO BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. ALL ELECTRICAL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICIAN UNDER A PERMIT 10. THIS SITE PLAN IS INTENDED FOR SEWAGE SYSTEM DESIGN PURPOSES ONLY. UNDER NO CIRCUMSTANCES ARE ISSUED BY THE TOWN OF YARMOUTH. BEARINGS, DISTANCES, OR FEATURES SHOWN TO BE USED TO ESTABLISH PROPERTY LINES. INCLUDING TOPOGRAPHY AND BUILDING LOCATION TAKEN FROM SITE PLAN DATED MARCH 19, 2013 7. A SEPARATE EXTERIOR ELECTRICAL DISCONNECT SWITCH SHALL BE PROVIDED WITHIN :SIGHT PRIOR 70 ACCESS. 11. EXISTING SITE FEATURES DISTANCE OF THE PUMP CHAMBER TO DE -ENERGIZE THE PUMP PREPARED BY SLADE ASSOCIATES, INC. FOR DAWN KAROL. r I � 1 0VEROIG UNSUITABLE J SOBS (SEE DBTALV 1 ( ' Lfhf; 1 I ' I PROPOSED 5 I D. H-20 PUMP CHAMBER EXISTING CESSPOOL TO -BE REMOVED _EXISTING WOOD RETAINING WALL _ PROPOSED PRESSURE DOSED SOIL ABSORPTION SYSTEM (1) FULL CULTEC C-4 CHAMBER & (1) CUT CULTEC C-4 CHAMBER OVERALL LENGTH 9.5' PROPOSED RETAINING WALL ,I TOP c7F WALL ELEV=9. 0' PROPOSED BOARDWALK OVER S. A S. AREA BETWEEN HOUSE AND RETAINING WALL(REMO (REMOVABLE FOR ,S. A. S. MAINTENANCE) INSTALL 4FT. TALL VINYL LINER ALONG BLOCK FOUNDATION WALL AND INSIDE OF RETAINING WALL PROPOSED PRESSURE DOSED SOIL ABSORPTION SYSTEM (3) CULTEC C-4 CHAMBERS ` OVERALL LENGTH 24.5' � I OWORK 1 <��C ��RIP-RAPS DJC D�� �� TAL BEACH PARCEL 8 3,5 75 SQ. F.T. f 4�29�13 NANTUCKET SO UND PROPOSED STRAW BALE DEWATERING PIT PARCEL 7 ■ '■ '57 ( -Z ( 13 DATE East Cape Engineering/ Inc. CIVIL ENGINEERS LAND SURVEYORS # 44 Route 28, Orleans. Mass. (508) 255-7120 SITE PLAT SANITARY SUBSURFACE SEWAGE DISPOSAL SYSTEM LOCATION: 53 MOUTH SHORE DRIVE YARMOUTH, MA REFERENCE: ASSESSORS MAP 19 PARCEL 8 PREPARED FOR: DAWN KAROL 1 2 3 No. Revision/Issue Date Project IOB# 03-050 Sheet 03050SSP.dwg Date 05/21/13 1 OF 1 Scale FIRST FLOOR 8"f 4" DIA. PVC VATION - 9.52' GRAVITY SEWER MIN. 1/4" PER FT. PITCH EXISTING SEWER UNE NEOPRENE 5.3't IN ELEV. 3.67' HIGH GROUNDWATER ELEVATION 2.5' TAKEN FROM ON SITE MONITORING WELL -FROM 2/10/13 UNTIL 2/19/13 '.1'd,'.'-.T`aT 3,500 GALLON 7'x17' CONCRETE H-20 2.5' IN INLE` TEE (10' MIN.) INSTALL 24' DIAMETER (H-20) RISER AND CAST IRON GASKETED AND BOLTED COVER TO FINISH GRADE AT ACCESS PORTS SEAL FLOAT 2'-1 I" %I 9' MINIMUM COVER 36' MA MUNI COVER FLOAT LEVEL SEWAGE HOLDING TANK /22/80 T17,11ti%OJJ GRADE - 6.0'* o VAl E) ELE V. APPROXIMATE LOCATION OF EXISTING BENCHMARK I WATER SERVICE TOP OF FIRST FLOOR SLEEVE EXISTING WATER LINE ELEVATION = 9.52 DATUM = 1929 NG N 7-1- FROM CURB STOP TO INSIDE VD/ I I CRAWL SPACE PROVIDE 6" COMPACTED) L3,500 GALLON 7'x17' REINFORCED CRUSHED STONE BASE CONCRETE H-20 TIGHT TANK TANK PROFILE VIEW NOT TO SCALE TIGHT TANK BUOYANCY CALCULATION: 7'-0' 6'-0' INSTALL 24' DIAMETER (H-20) RISER AND CAST IRON GASKETED AND BOLTED COVER TO FINISH GRADE AT ACCESS PORTS :..4111 W:l zanI VOLUME OF TANK DISPLACED BY HIGH GROUNDWATER - 842 CUBIC FEET (ASSUMES TOTAL SUBMERSION) BUOYANT FORCE IN POUNDS EXERTED VERTICALLY ON TANK - 52,500 LBS. ADD 10% FACTOR OF SAFETY - 57.750 LBS. EMPTY TANK WEIGHT (FROM MANUFACTURER) - 38.240 LBS. WEIGHT OF SOIL COVER ABOVE TANK - 8.000 LBS• WEIGHT OF ADDITIONAL CONCRETE - 12,150 LBS BUOYANT FORCE EXERTED ON TANK OF 57,750 LBS. IS LESS THAN TOTAL WEIGHT OF 3,500 GALLON TANK AND SOIL COVER AND CONCRETE (58,390 LBS.) OK TO USE • 500 GALLON H-20 TIGHT TANK SHOWN ABOVE FOR THIS APPLICATION PROVIDE 3 CUBIC YARDS SOF CONCRETE FOR BUOYANCY EXISTING OVERHEAD U=Fs TIMBERS PROPOSED 4"0 SCK40 PVC GRAVITY - SEWER (TYP.) PARCEL 9 DRIVE EXISTING CESSPOOL TO BE REMOVED EpGE Of pe.� v_. 1 WLACE V. G11,91S �y EXISTING WOOD n VER S C UPON o RET ANG WALL 1} CONC• _ $ NB0 29 00"E S z< _ INSTALL SHEET PILING DURING CONSTRUCTION FOR 40.66' _ FOUNDATION PROTECTION AND DEWATERING _ 3 PROPOSED 3,500 GALLON 1 (ELF6 H-20 CONCRETE TIGHT TANK REMOVE & RECONSTRUCT BEDROOM �1 WOOD STEPS 1 1 D BE C-111BATH EXISTING SINGLE FAMILY RESIDENCE (CRA WLSPACE FOUNDATION) 1 SCHEN 1, PARCEL 7 4. ROOM b to ci DECK '� 1 ARD BOWALK PROPOSED STRAW BALE -I- ' DEWATERING PIT REDUCTIONS REQUESTED UNDER TITLE 5 REGULATIONS: (310 CMR 15.405: CONTENTS OF LOCAL UPGRADE APPROVAL) a) 10't TO THE 10' MINIMUM SETBACK REWIRED FOR PROPOSED TIGHT TANK TO ROAD PROPERTY UNE. (0't SETBACK PROVIDED) a) 7't TO THE 10' MINIMUM SETBACK REWIRED FOR PROPOSED TIGHT TANK TO SIDE PROPERTY UNE. (3't SETBACK PROVIDED) b) 17't TO THE 20' MINIMUM SETBACK REWIRED FOR PROPOSED TIGHT TANK TO CRAWLSPACE FOUNDATION. (3't SETBACK PROVIDED) HIGH LEVEL ALARM SPECIFICATIONS: 1. AN AUDIO AND VISUAL HIGH WATER ALARM PANEL SHALL BE PROVIDED IN AN EASILY ACCESSIBLE LOCATION. 2. THE ALARM SHALL BE CONTROLLED BY A SINGLE FLOAT SWITCH SET TO OPERATE THE AUDIO AND VISUAL FEATURES WHEN THE TANK REACHES 3/5 CAPACITY. 3. ALL WIRING FOR THE ALARM SYSTEM SHALL BE PERFORMED BY A LICENSED ELECTRICIAN. AND INSPECTED BY THE TOWN OF YARMOUTH ELECTRICAL INSPECTOR. 4. PROPER OPERATION OF THE ALARM SHALL BE INSPECTED BY THE DESIGN ENGINEER AND REPRESENTATIVE OF THE LOCAL APPROVING AUTHORITY PRIOR TO FINAL CERTIFICATION. PRE -CAST CONCRETE TIGHT TANK SPECIFICATIONS: 1. THE PROPOSED TIGHT TANK SHALL BE CONSTRUCTED OF REINFORCED CONCRETE. WITH A H-20 DESIGN LOADING. 2. MINIMUM TANK CAPACITY SHALL BE 500% OF DAILY FLOW BUT NO LESS THAN 2.000 GALLONS. EXISTING 674 S.F. LIVING AREA INCLUDING 1 PRIVATE BEDROOM O 1109pd PER BEDROOM - 110gpd ESTIMATED DAILY FLOW. (11009pd x 500% - 550 GALLONS). A 3.500 GALLON TANK IS PROPOSED. 3. TANK SHALL BE PROVIDE[) WITH TWO 24' MINIMUM DIAMETER ACCESS PORTS LOCATED OVER INLET TEE AND OPPOSITE END OF TANK. 4. A 24' MINIMUM DIAMETER GASKETED AND BOLTED CAST IRON COVER LABELED 'SEWER' SHALL BE PROVIDED TO FINISH GRADE OVER THE BOTH ACCESS PORTS IN THE PRE -CAST TANK TOP. THE CAST IRON COVERS SHALL REST ON CONCRETE RISERS SEALED TO THE TANK TOP AND CAST IRON FLANGES BY HYDRAULIC CEMENT. 5. ELECTRICAL CONDUIT PENETRATIONS THROUGH THE CONCRETE RISER OR PRE -CAST TANK FOR THE ALARM SHALL BE SEALED TO PREVENT THE INFILTRATION OF GROUND WATER. 6. THE TANK SHALL BE PROVIDED WITH A SINGLE INLET KNOCKOUT FOR A 4'DIA. INLET UNE. NO OUTLET SHALL BE PROVIDED. 7. A 4' NEOPRENE BOOT SHALL BE PROVIDED AT THE INLET KNOCKOUT OF THE PRE -CAST TANK. THE BOOT SHALL BE FITTED LOUTH A STAINLESS CLAMP TO PROVIDE A WATERTIGHT SEAL TO THE *'PVC INLET UNE. 8. THE PRE -CAST TANK MANUFACTURER SHALL PROVIDE A WATERTIGHT TANK BY IMPLEMENTING SUFFICIENT METHODS FOR THE SEALING OF ALL CONCRETE SURFACES. AND SEAUNG OF ALL SEAMS BETWEEN TANK SECTIONS AND ANY PENETRATIONS. BOTH AT THE FACTORY AND IN THE FIELD. GENERAL NOTES' 1. THE HOLDING TANK SHOWN HAS BEEN DESIGNED IN ACCORDANCE WITH COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATION 310 CMR 15.260(2) 2. THE TIGHT TANK SHALL RECEIVE WASTE FROM ALL FIXTURES WITHIN THE EXISTING DWELLING. 3. THE DESIGN ENGINEER SHALL INSPECT THE INSTALLATION OF THE TIGHT TANK AND CERTIFY THAT IT HAS BEEN INSTALLED WATERTIGHT. CONTACT ENGINEER PRIOR TO CONSTRUCTION TO SCHEDULE INSPECTIONS. 4. NO FLOW SHALL BE DISCHARGED TO THE TIGHT TANK UNTIL THE DESIGN ENGINEER HAS CERTIFIED THE INSTALLATON TO THE LOCAL APPROVING AUTHORITY AND THE MaDEP. S. THE TGHT TANK SHALL BE PUMPED AT 3/5 CAPACITY BY A LICENSED SEPTAGE HAULER AND THE CONTENTS DISPOSED OF AT AN APPROVED WASTEWATER TREATMENT PLANT. 6. THE OWNER SHALL RECORD THE APPROVAL ISSUED BY L(aDEP OR IF THE DEPARTMENT ISSUES A PRESUMPTIVE APPROVAL. THE LOCAL APPROVAL SHALL BE RECORDED AT THE REGISTRY OF DEEDS IN THE CHAIN OF PROPERTY TITS. 7. NO WELLS OR POTABLE WATER SUPPLIES EXIST WITHIN 50' OF HOLDING TANK. S. DATUM IS N.G.VD. 9. EXISTING SITE FEATURES AND TOPOGRAPHY TAKEN FROM SITE PLAN FOR DAWN KAROL PREPARED BY SLADE ASSOCIATES. INC. 10. ANY CHANGES TO THIS PLAN MUST BE APPROVED BY EAST CAPE ENGINEERING. INC. 11. ENGINEER TO STAKE OUT TANK LOCATION FOR CONSTRUCTION. 12. ENGINEER TO VERIFY TANK LOCATION FOLLOWING CONSTRUCTION. APPROVED DATE 13. THERE IS A 1-1/4' DIAMETER PIPE RUNNING THROUGH THE CESSPOOL. BELIEVED TO BE AN ABANDONED WATERLINE EXCAVATE CAREFULLY TO VERIFY. r' 4. OFI / 1 o COASTAL ,,, "PARCEL 8 - 3,575 SQ. FT. f , 03 1*1 NOTE: THE ENTRE PROJECT IS WITHIN 100FT. OF NANTUCKET SOUND. i ' NANTUCKET - ' SOUND - =SITE PLAN= DZ 13East Cape Engineering Inc. CIVIL ENGINEERS .DATE LAND SURVEYORS Ip 44 Route 28, Orleans, Mass. (508) 255-7120 BOARD OF HEALTH YARMOUTH , MA WASTEWATER TIGHT TANK DESIGN LOCUS: 53 SOUTH SHORE DRIVE YARMOUTH, MA REF: ASSESSOR'S MAP 19, PARCEL 8 PREPARED FOR: DAWN KAROL SCALE: 1"=10' DATE: 03/21/2013 REVISED: 04/02/2013 FIRST FLOOR 8't 4" DIA. PVC :NATION - 9.52' GRAVITY SEWER I MIN. 1/4" PER FT. PITCH EXISTING SEWER UNE NEOPRENE 5.5. IN ELEV. 3.67' ELEVATION HIGH GROUNDWATER ELEVATION 2.5' TAKEN FROM ON SITE MONITORING WELL FROM 2/10/13 UNTIL 2/19/13 2.5' INLET IEE .LE V. ;• (10" MIN.) 5'-8" INSTALL 24" DIAMETER (H-20) RISER AND CAST IRON GASKETED AND BOLTED COVER TO FINISH GRADE AT ACCESS PORTS 9- MINIMUM COVER 36" MAXIMUM COVER PROVIDE WATERTIGHT SEAL TO TANK TOP (TYP.) FLOAT LEVEL SEWAGE HOLDING TANK EXISTING GRADE - e.O'f T7'-1 ''.. PROVIDE 6" COMPACTEDJ L3,500 GALLON 7'x17' REINFORCED CRUSHED STONE BASE CONCRETE H-20 TIGHT TANK TANK PROFILE VIEW NOT TO SCALE INSTALL 24" DIAMETER (H-20) RISER AND NEOPRENE Boar CAST IRON GASKETED AND BOLTED COVER TO FINISH GRADE AT ACCESS PORTS , IN U - 3,500 GALLON 7'07' REINFORCED CONCRETE H-20 TIGHT TANK TANK PLAN VIEW NOT TO SCALE PROVIDE 3 CUBIC YARDS SOF CONCRETE FOR BUOYANCY ,f22/80 SO UTTI ,y 'f %O1? E �pRI VA TE) APPROXIMATE LOCATION OF EXISTING _ I WATER SERVICE SLEEVE EXISTING WATER LINE FROM CURB STOP TO INSIDE CRAWL SPACE EXISTINC OVERHEAD UTILITIES pAPEMEN7, TIMBERS - PROPOSED 4"0 SCH.40 PVC GRAVITY' SEWER (TIP.) PARCEL 9 BENCHMARK TOP OF FIRST FLOOR ELEVATION = 9.52' DATUM = 1929 NGVD 1 REPLACE Y REMgRB �OY�O V WRYAS 77ON / -5. X804 fib f Al i6 V15i BEDROOM CT cT1 4. d CZ 4z 0 TIGHT TANK BUOYANCY CALCULATION: REDUCTIONS REQUESTED UNDER TITLE 5 REGULATIONS: VOLUME OF TANK DISPLACED BY HIGH GROUNDWATER - 642 CUBIC FEET (ASSUMES TOTAL SUBMERSION) (310 CMR 15.405: CONTENTS OF LOCAL UPGRADE APPROVAL) BUOYANT FORCE IN POUNDS EXERTED VERTICALLY ON TANK - 52,500 LBS. a) 10't TO THE 10' MINIMUM SETBACK REQUIRED FOR PROPOSED TIGHT TANK TO ROAD PROPERTY UNE. ADD 10% FACTOR OF SAFETY - 57,750 LBS. (0't SETBACK PROVIDED) I EMPTY TANK WEIGHT (FROM MANUFACTURER) 38,240 LBS. a) 7't TO THE 10' MINIMUM SETBACK REWIRED FOR PROPOSED TCHT TANK TO SIDE PROPERTY UNE. (3't SETBACK PROVIDED) WEIGHT OF SOIL COVER ABOVE TANK - 8.000 LES. b) 17't TO THE 20' MINIMUM SETBACK REWIRED FOR PROPOSED TIGHT TANK TO CRAWLSPACE FOUNDATION. WEIGHT OF ADDITIONAL CONCRETE - 12,150 LBS (3'1: SETBACK PROVIDED) BUOYANT FORCE EXERTED ON TANK OF 57,750 LBS. 15 LESS THAN TOTAL WEIGHT OF 3,500 GALLON TANK AND SOIL COVER AND CONCRETE (58.390 LBS.) �I OK TO USE 3-500 GALLON H-20 TIGHT TANK SHOWN ABOVE FOR THIS APPLICATT HIGH LEVEL ALARM SPECIFICATIONS: 1. AN AUDIO AND VISUAL HIGH WATER ALARM PANEL SHALL BE PROVIDED IN AN EASILY ACCESSIBLE LOCATION. 2. THE ALARM SHALL BE CONTROLLED BY A SINGLE FLOAT SWITCH SET TO OPERATE THE AUDIO AND VISUAL FEATURES WHEN THE TANK REACHES 3/5 CAPACITY. 3. ALL HIRING FOR THE ALARM SYSTEM SHALL BE PERFORMED BY A LICENSED ELECTRICIAN, AND INSPECTED BY THE TOWN OF YARMOUTH ELECTRICAL INSPECTOR. 4. PROPER OPERATION OF THE ALARM SHALL BE INSPECTED BY THE DESIGN ENGINEER AND REPRESENTATIVE OF THE LOCAL APPROVING AUTHORITY PRIOR TO FINAL CERTFICATON. PRE -CAST CONCRETE TIGHT TANK SPECIFICATIONS: 1. THE PROPOSED TIGHT TANK SHALL BE CONSTRUCTED OF REINFORCED CONCRETE, WITH A H-20 DESIGN LOADING. 2. MINIMUM TANK CAPACITY SHALL BE SOOR OF DAILY FLOW BUT NO LESS THAN 2.000 GALLONS. EXISTING 674 S.F. LIVING AREA INCLUDING I PRIVATE BEDROOM O 110ppd PER BEDROOM 1109pd ESTIMATED DAILY FLOW. (1100gpd x 500% w 550 GALLONS). A 3,500 GALLON TANK IS PROPOSED. i 3. TANK SHALL BE PROVIDED WITH TWO 24" MINIMUM DIAMETER ACCESS PORTS LOCATED OVER INLET TEE AND OPPOSITE END OF TANK. 4. A 24" MINIMUM DIAMETER GASKETED AND BOLTED CAST IRON COVER LABELED "SEWER" SHALL BE PROVIDED TO FINISH GRADE OVER THE BOTH ACCESS PORTS IN THE PRE -CAST TANK TOP. THE CAST IRON COVERS SHALL REST ON CONCRETE RISERS SEALED TO THE TANK TOP AND CAST IRON FLANGES BY HYORAUUC CEMENT. 5. ELECTRICAL CONDUIT PENETRATIONS THROUGH THE CONCRETE RISER OR PRE -CAST TANK FOR THE ALARM SHALL BE SEALED TO PREVENT THE INFILTRATION OF GROUND WATER. 6. THE TANK SHALL BE PROVIDED WITH A SINGLE INLET KNOCKOUT FOR A 4"DIA. INLET LINE. NO OUTLET SHALL BE PROVIDED. 7. A 4" NEOPRENE BOOT SHALL BE PROVIDED AT THE INLET KNOCKOUT OF THE PRE -CAST TANK. THE BOOT SHALL BE FITTED WITH A STAINLESS CLAMP TO PROVIDE A'WATERTIGHT SEAL TO THE 4"PVC INLET UNE. S. THE PRE -CAST TANK MANUFACTURER SHALL PROVIDE A WATERTIGHT TANK BY IMPLEMENTING SUFFICIENT METHODS FOR THE SEALING OF ALL CONCRETE SURFACES. AND SEALING OF ALL SEAMS BETWEEN TANK SECTIONS AND ANY PENETRATIONS. BOTH AT THE FACTORY AND IN THE FIELD. GENERAL NOTES: 1. THE HOLDING TANK SHOWN HAS BEEN DESIGNED IN ACCORDANCE WITH COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATION 310 CMR 15.260(2) 2. THE TGHT TANK SHALL RECEIVE WASTE FROM ALL FIXTURES WITHIN THE EXISTING DWELLING. 3. THE DESIGN ENGINEER SHALL INSPECT THE INSTALLATON OF THE TIGHT TANK AND CERTIFY THAT IT HAS BEEN INSTALLED WATERTIGHT. CONTACT ENGINEER PRIOR TO CONSTRUCTION TO SCHEDULE INSPECTIONS. 4. NO FLOW SHALL BE DISCHARGED TO THE TIGHT TANK UNTIL THE DESIGN ENGINEER HAS CERTIFIED THE INSTALLATION TO THE LOCAL APPROVING AUTHORITY AND THE MnDEP. 5. THE TIGHT TANK SHALL BE PUMPED AT 3/5 CAPACITY BY A LICENSED SEPTAGE HAULER AND THE CONTENTS DISPOSED OF AT AN APPROVED WASTEWATER TREATMENT PLANT. e. THE OWNER SHALL RECORD THE APPROVAL ISSUED BY M9DEP OR IF THE DEPARTMENT ISSUES A PRESUMPTIVE APPROVAL THE LOCAL APPROVAL SHALL BE RECORDED AT THE REGISTRY OF DEEDS IN THE CHAIN OF PROPERTY TITLE. 7. NO WELLS OR POTABLE WATER SUPPLIES EXIST WITHIN 50' OF HOLDING TANK. 8. DATUM IS N.G.V.D. 9. EXISTING SITE FEATURES AND TOPOGRAPHY TAKEN FROM SITE PLAN FOR DAWN KAROL PREPARED BY SLADE ASSOCIATES. INC. 10. ANY CHANGES TO THIS PLAN MUST BE APPROVED BY EAST CAPE ENGINEERING. INC. 11. ENGINEER TO STAKE OUT TANK LOCATION FOR CONSTRUCTION. 12. ENGINEER TO VERIFY TANK LOCATION FOLLOWING CONSTRUCTION. 13. THERE ISA 1-1/4" DIAMETER PIPE RUNNING THROUGH THE CESSPOOL, BELIEVED TO BE AN ABANDONED WATERLINE. EXCAVATE CAREFULLY TO VERIFY. APPROVED DATE 0 TALL _ ' 1 BED DRIVE EXISTING CESSPOOL TO BE REMOVED EXISTING WOOD RETAINING WALL NEPTUNE I.N. pSa W'AMPANOA9 RD. SHORE Ct DRIVE d 0 Lows LOCUS MAP INSTALL SHEET PILING DURING CONSTRUCTION FOR FOUNDATION PROTECTION AND DEWATERING PROPOSED 3,500 GALLON H-20 CONCRETE TIGHT TANK REMOVE & RECONSTRUCT 1 WOOD STEPS 1 1 S 1 10TC110 1 1 tok ROM 1, DECK 11 .6ALK 0 Df z / i ,,1g OF � �•T 1 �-cel'. !\ 7 EXISTING SINGLE FAMILY RESIDENCE (CRA WLSPACE FOUNDATION) 14 C> COASTALEA�/� 1�+ "PARCEL 8 3575 SQ. FT. t , , ' ' Al 1813 8 W oi/�,� , PARCEL 7 PROPOSED STRAW BALE DEWATERING PIT o� NOTE: THE ENTIRE PROJECT IS WITHIN 10OFT. OF NANTUCKET SOUND. 1 NANTUCKET SO UND =SITE PLAN= - p2 l3East Cape Engineering, Inc. CIVIL ENGINEERS DALE LAND SURVEYORS 111 44 Route 28, Orleans, Mass. (508) 255-7120 BOARD OF HEALTH YARMOUTH . MA WASTEWATER 11GHT TANK DESIGN LOCUS: 53 SOUTH SHORE DRIVE YARMOUTH, MA REF: ASSESSOR'S MAP 19, PARCEL 8 PREPARED FOR: DAWN KAROL 1"-10' DATE: 03/21/2013 SCALE: DWG: 03050TTP REVISED: 04/02/201 1 03-050 FIRST FLOOR 8'd= 4" DIA. PVC ;VATION 9.52' GRAVITY SEWER I MIN. 1/4" PER FT. PITCH EXISTING SEWER UNE NEOPRENE BOOT 5.5'd IN ELEV. 3.67' ELEV. 2.5' INUET TEE (10' MIN.) ELEV. HIGH] 5' -8 - GROUNDWATER I '�- ELEVATON HIGH GROUNDWATER ELEVATION 2.5' TAKEN FROM ON SITE MONITORING WELL FROM 2/10/13 UNTIL 2/19/13 DIAMETER (H-20) RISER AND 4SKETED AND BOLTED COVER GRADE AT ACCESS PORTS 9' MINIMUM COVER //// Se' MAXIMUM COVER FLOAT LEVEL 2•-1r SEWAGE HOLDING TANK GRADE _ 6.W* T-/-/77/7 PROVIDE 6" COMPACTEDJ L3,500 GALLON 7'x17' REINFORCED CRUSHED STONE BASE CONCRETE H-20 TIGHT TANK TANK PROFILE VIEW NOT TO SCALE PROVIDE 3 CUBIC YARDS SOF CONCRETE FOR BUOYANCY NOTE: THE ENTRE PROJECT IS WITHIN 10OFT. OF NANTUCKET SOUND. ,{72180 DRIVE E RE D i S p UTH �p NATE) APPROXIMATE LOCATION EXISTING CESSPOOL TO OF EXISTING WATER /BE REMOVED SLEEVE EXISTING WATER LINE-SERP7CI FROM CURB STOP TO INSIDE __---- EXISTING CRAWL SPACE 0VERHEAD UT=IES E of -- OyE AND BSS aNE EXISTING WOOD -------- - ESTING CO NECESSARY RETAINING WALL AyPDRIVER'AyONSTRUCTION o II FOR 1+ C_0 *� =STING TIMBERS 77-0 PROPOSED 4"A SCH40 PVC GRAVITY SEWER (TIP) INSTALL 24' DIAMETER (H-20) RISER AND NEOPRENE BOOT CAST IRON GASKETED AND BOLTED COVER TO FINISH GRADE AT ACCESS PORTS IN 6'-0' 7'-0' ;4 PARCEL 9 e TIGHT TANK BUOYANCY CALCULATION: VOLUME OF TANK DISPLACED BY HIGH GROUNDWATER - 842 CUBIC FEET (ASSUMES TOTAL SUBMERSION) BUOYANT FORCE IN POUNDS EXERTED VERTICALLY ON TANK - 52,500 LBS. ADD 105 FACTOR OF SAFETY - 57,750 LBS. EMPTY TANK WEIGHT (FROM MANUFACTURER) - 38,240 LBS. WEIGHT OF SOIL COVER ABOVE TANK 8.000 LBS. WEIGHT OF ADDITIONAL CONCRETE - 12.150 LBS BUOYANT FORCE EXERTED ON TANK OF 57,750 LBS IS LESS THAN TOTAL WEIGHT OF 3,500 GALLON TANK AND SOIL COVER AND CONCRETE (58,390 LBS.) OK TO USE • 500 GALLON H-20 TIGHT TANK SHOWN ABOVE FOR THIS APPUCATON GALLON 7'x17' REINFORCED ETE H-20 TIGHT TANK Ns0 o s8 "E Al2( 126) V15( ON CT x 4. c�1 Az O GENERAL NOTES: 1. ENGINEER TO STAKE OUT TANK FOR CONSTRUCTION. 2. ENGINEER TO VERIFY LOCATION FOLLOWING CONSTRUCTION. 3. THERE IS A 1 1/4' t PIPE RUNNING THROUGH THE CESSPOOL BELIEVED TO BE AN ABANDONED WATER LINE. EXCAVATE CAREFULLY TO VERIFY. HIGH LEVEL ALARM SPECIFICATIONS: 1. AN AUDIO AND VISUAL HIGH WATER ALARM PANEL SHALL BE PROVIDED IN AN EASILY ACCESSIBLE LOCATION. 2. THE ALARM SHALL BE CONTROLLED BY A SINGLE FLOAT SWITCH SET TO OPERATE THE AUDIO AND VISUAL FEATURES WHEN THE TANK REACHES 3/5 CAPACITY. 3. ALL WIRING FOR THE ALARM SYSTEM SHALL BE PERFORMED BY A LICENSED ELECTRICIAN, AND INSPECTED BY THE TOWN OF YARMOUTH ELECTRICAL INSPECTOR. 4. PROPER OPERATION OF THE ALARM SHALL BE INSPECTED BY THE DESIGN ENGINEER AND REPRESENTATIVE OF THE LOCAL APPROVING AUTHORITY PRIOR TO FINAL CERTIFICATION. PRE -CAST CONCRETE TIGHT TANK SPECIFICATIONS: 1. THE PROPOSED TIGHT TANK SHALL BE CONSTRUCTED OF REINFORCED CONCRETE. WITH A H-20 DESIGN LOADING. 2. MINIMUM TANK CAPACITY SHALL BE 5005 OF DAILY FLOW BUT NO LESS THAN 2,000 GALLONS. EXISTING 874 S.F. LIVING AREA INCLUDING 1 PRIVATE BEDROOM O 110gpd PER BEDROOM - 1109pd ESTIMATED DAILY FLOW. (1100gpd x 5005 - 550 GALLONS). A 3,500 GALLON TANK IS PROPOSED, 3. TANK SHALL BE PROVIDED WITH TWO 24' MINIMUM DIAMETER ACCESS PORTS LOCATED OVER INLET TEE AND OPPOSITE END OF TANK. 4. A 24' MINIMUM DIAMETER GASKETED AND BOLTED CAST IRON COVER LABELED 'SEWER' SHALL BE PROVIDED TO FINISH GRADE OVER THE BOTH ACCESS PORTS IN THE PRE -CAST TANK TOP. THE CAST IRON COVERS SHALL REST ON CONCRETE RISERS SEALED TO THE TANK TOP AND CAST IRON FLANGES BY HYDRAULIC CEMENT. 5. ELECTRICAL CONDUIT PENETRATIONS THROUGH THE CONCRETE RISER OR PRE -CAST TANK FOR THE ALARM SHALL BE SEALED TO PREVENT THE INFILTRATION OF GROUND WATER. 6. THE TANK SHALL BE PROVIDED PATH A SINGLE INLET KNOCKOUT FOR A 4"DIA. INLET UNE. NO OUTLET SHALL BE PROVIDED. 7. A 4' NEOPRENE BOOT SHALL BE PROVIDED AT THE INLET KNOCKOUT OF THE PRE -CAST TANK. THE BOOT SHALL BE FITTED WITH A STAINLESS CLAMP TO PROVIDE A WATERTIGHT SEAL TO THE 4 -PVC INLET UNE. 8. THE PRE -CAST TANK MANUFACTURER SHALL PROVIDE A WATERTIGHT TANK BY IMPLEMENTING SUFFICIENT METHODS FOR THE SEALING OF ALL CONCRETE SURFACES, AND SEALING OF ALL SEAMS BETWEEN TANK SECTIONS AND ANY PENETRATIONS, BOTH AT THE FACTORY AND IN THE FIELD. GENERAL NOTES: 1. THE HOLDING TANK SHOWN HAS BEEN DESIGNED IN ACCORDANCE WITH COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATION 310 CMR 15.260(2) 2. THE TIGHT TANK SHALL RECEIVE WASTE FROM ALL FIXTURES WITHIN THE EXISTING DWELLING. 3. THE DESIGN ENGINEER SHALL INSPECT THE INSTALLATION OF THE TIGHT TANK AND CERTIFY THAT IT HAS BEEN INSTALLED WATERTIGHT. CONTACT ENGINEER PRIOR TO CONSTRUCTION TO SCHEDULE INSPECTIONS. 4. NO FLOW SHALL BE DISCHARGED TO THE TIGHT TANK UNTIL THE DESIGN ENGINEER HAS CERTIFIED THE INSTALLATION TO THE LOCAL APPROVING AUTHORITY AND THE MaDEP. 5. THE TIGHT TANK SHALL BE PUMPED AT 3/5 CAPACITY BY A LICENSED SEPTAGE HAULER AND THE CONTENTS DISPOSED OF AT AN APPROVED WASTEWATER TREATMENT PUNT. 6. THE OWNER SHALL RECORD THE APPROVAL ISSUED BY MaDEP OR IF THE DEPARTMENT ISSUES A PRESUMPTIVE APPROVAL THE LOCAL APPROVAL SHALL BE RECORDED AT THE REGISTRY OF DEEDS IN THE CHAIN OF PROPERTY TITLE. 7. NO WELLS OR POTABLE WATER SUPPLIES EXIST WITHIN 50' OF HOLDING TANK. 8. DATUM IS N.G.V.D. 9. EXISTING SITE FEATURES AND TOPOGRAPHY TAKEN FROM SITE PLAN FOR DAWN KAROL PREPARED BY SLADE ASSOCIATES, INC. 10. ANY CHANGES TO THIS PLAN MUST BE APPROVED BY EAST CAPE ENGINEERING. INC. L - INSTALL SHEET PILING DURING CONSTRUCTION FOR f FOUNDATION PROTECTION AND DEWATERING PROPOSED ?500 GALLON H-20 CONCRETE TIGHT TANK REMOVE & RECONSTRUCT 1 WOOD STEPS 1 SIND �N LY �II S 1 1 � 1 w 1 FF 1 DECK 11 BOARDNA� � i a / G�1 7 ( LJMIT OF APPROVED DATE TOP OF FIRST FLOOR ELEVATION = 9.52' DATUM = 1929 NG VD PARCEL 7 STRAW BALE DEWATERING PIT BEACH O COASTAL FT -PARCEL 8 - 3,575 SQ. FT. -t- 03 03 , NANTUCKET SOUND =SITE PLAN= WASTEWATER TIGHT TANK DESIGN East Cape Engineering, Inc. CIVIL ENGINEERS DATE LAND SURVEYORS. M 44 Route 28. OHeons, Mase. (508) 255-7120 BOARD VY HEALIH YARMOUTH , MA LOCUS: 53 SOUTH SHORE DRIVE YARMOUTH, MA REF: ASSESSOR'S MAP 19, PARCEL 8 PREPARED FOR: DAWN KAROL SCALE: 1 "=10' DATE: 03/21 /2013