HomeMy WebLinkAbout83-1964 - Topographic Plan0021
0
i
0 10
i
PARCEL 73 1
DICARLO
ff" � PGS / /
�'Ci` I / WOOD
OBOX:
A//✓/
%
i
O f
\ I
1
IL
il' I'
'\ \
\V -
I1Q9y
y�o01 P,\
-
i —
/ i —
/_ 2p A
c
J.
"X,` y
I — 1!
D SAN,,- _
DREDGE_
BE PLACED - r� �F• f /
TD O ..• .. SALTMARSH
PLAN
SCALE: 1" = 20' 1 MLW EL. _ -1.5
I NOT SHOWN � DREDGIN�G�-0• PARCEL I18
S
` (_';<f3 \ ,� — VILENISKiS
i \ i ROW OF PILINGS 10 REMAIN -
0
95't
BEACH NOURISHMENT
AREA
PROFILE
HORIZONTAL SCALE: 1" = 20'
VERTICAL SCALE: 1' = 2'
30 40 80 60
ta'
DREDGING
0.5't AREA
80 90 100 110 120 130
YARMOUIH, MA I
KEY MAP
NO SCALE
NOTES
L ELEVATIONS REFER TO NGVD
2. CONTACT CAPE COD ENGATERING, INC PRIOR TO TNITIATiNG WORK FOR
CONMNIA77ON OF ELEVATION BENCHMARK, HORIZONTAL CONTROL„ AND FOR
REVIF.W'OF ADDITIONAL REQUIREMENTS.
3. ACCESS ACTIVITY FOR DREDGING AND RELATED SAND TRANSPORT SHALL BE DIRECTLY
�OVER THE EXISTING SAND ROUTE LEADING TO THE WORK SITE FROM CROWELL ROAD.
4-J ACCESS ROUTE SHALL BE STAKED PRIOR TO INITIATING ACCESS ACTIVITY. USE THE
WORK LIMIT DESIGNATED ON THE PLAN.
5. ALL EDGES OF VEGETATION SHALL BE CLEARLY STAKED TO CORDONS OFF THESE
AREAS DURING THE WORK TERM.
THE ROUTE SHALL BE RAKED OUT AND RESTORED TO A PRE -CONSTRUCTION
TOPOGRAPHIC CONDITION UPON COMPLETION OF WORK
7. FOLLOW ADDITIONAL GUIDELINES INCLUDED IN THE TOWN OF YARMOUTH
CONSERVATION COMMISSION ORDER OF CONDITIONS, MASS DEP DREDGING PERMIT AND
OTHER AUTHORIZATIONS CONDITIONING THE WORK ACTIVITY.
& RELATED SAND NOURISHMENT WITH USE OF THE EXCAVATED MATERIAL IS PROPOSED
WHERE SHOWN.
9. THE DREDGED AND EXCAVATED SAND MATERIAL MAY BE PLACED AS NOURISHMENT
IMMEDIATELY UPON REMOVAL
10. ADDITIONAL SMD VOLUME IS PERMITTED ABOVE THE HIGH WATER LINE SUBJECT TO
SOURCE APPROVAL SAND SHALL BE CLEAN MEDIUM SAND, OF A SUITABLE LIGHT
COLOR SCREENED AS NECESSARY.
vnic.'ai,inin-i TC """FT.1vI^ri, uW +lAni.I. BE V. I'.. TLA Tv TnvT'"rICTI TIiF,
$?.v r.
REMAINING FOREDUNE WHERE SHOWN.
11 AT COMPLETION, THE, WORK AREA AND BEACH BERM SHALL BE LEFT IN A SMOOTH,
UNIFORM CONDITION RESEMBLING THE PRE -CONSTRUCTION CONDITION.
V TOPOGRAPHIC PLAN
SHOWING
PROPOSED DREDGING AND BEACH NOURISHMENT
AT
138 CROWELL ROAD, WEST YARMOUTH, MA
ASSESSORS MAP 17, PARCEL 72
PREPARED FOR
WEYPET LIMITED PARTNERSHIP
11 HEATHER DRIVE MILTON, MA 02186
APRIL 29, 2013 SCALE - AS NOTED
PREPARED 13Y
CAPE COD ENGINEERING, INC.
ROBERT M. PERRY, P.E.
P.Q. BOX 1517
EAST DENNIS, MA 02641
508-385-1445
SOBELOWG
OF
IIMA
V TOPOGRAPHIC PLAN
SHOWING
PROPOSED DREDGING AND BEACH NOURISHMENT
AT
138 CROWELL ROAD, WEST YARMOUTH, MA
ASSESSORS MAP 17, PARCEL 72
PREPARED FOR
WEYPET LIMITED PARTNERSHIP
11 HEATHER DRIVE MILTON, MA 02186
APRIL 29, 2013 SCALE - AS NOTED
PREPARED 13Y
CAPE COD ENGINEERING, INC.
ROBERT M. PERRY, P.E.
P.Q. BOX 1517
EAST DENNIS, MA 02641
508-385-1445
SOBELOWG