Loading...
HomeMy WebLinkAbout83-1967F'°'o m (ifPKz mm�aFCN�m m aa3F Q� o3»f m°wm�a� wpm w n�Xm0�9j11 ani 3� m� n a.c1O G' 3 a—m do= VQda'- n o 30 OS m peon 6uiuielaa lR Alennpaeoq pelsui 'oildes epea6dn As'anud ajous glnos £5 mc�o�s Mowe�BOMyv'xmv. _.- il�Yn '.ri$Od ew 311"IINI e� 96Q6JN3yU10C1 lti1g7110l __ - ---. _. 43q.1�lN:Yd - 310VNItllSfK mo o�an3'g KKSna m.vna nF °'nmoa �m owmmo'm �'o cmpc m arnc m mym'�'am b.0 2mm NNW o d5_v� m n.m»» ma Fmmo� wrn s .mp 3=S3m" �...<l SSmD 3S2. �ohD 3n wox efa�3 n» anAimO �ao3 Fns mm3 San oFc �<g nm�o 03; mm ma mw o.w 'o 56, sem. »> m?aim wso m»¢�ml »mmo am m imp F'°'o m (ifPKz mm�aFCN�m m aa3F Q� o3»f m°wm�a� wpm w n�Xm0�9j11 ani 3� m� n a.c1O G' 3 a—m do= VQda'- n o 30 OS m peon 6uiuielaa lR Alennpaeoq pelsui 'oildes epea6dn As'anud ajous glnos £5 FIELD INSTALL 16" LAYER BY FLOAT SWITCHES HIGH GROUNDWATER EL. - 2.5' ;. - NON -REINFORCED CONCRETE t6 (MIN. 1401b/Gust. UNIT WT) OPERATION c TTN .c� _ D REMOVE A NSUITABLE SOILS Ftl_LY"a TOP ' -(MEASURED -, R FR M TANK ) O FLOPC�OUNOwTOH B LAYERS) BETWEEN RErwINING WALL W VNTL CLEAN SAND ALL ' - B •, . �.- t ' ' A HIGH WATER ALARM ON: -22" NTERM. 6" OF CRUSHED STONE 7 FOR D SIGN L.-2.5' PUMP ON:- Ia- )� SUMP (PUMP OFF 12"CUR RO LACIMI OL EX3,tVATED MATERIALWT" CLEAN SAND SLEEVE EXISTING WATER LINE 3. 6" OFCRUSHEDSTONE-- PROPOSED SOIL ABSORPTION BED CONFIGURATION: SOIL ABSORPTION SYSTEM (END VIEW) 2 1000 GALLON (H-20) CONCRETE SEPTIC 2 (H-20) CONCRETE PUMP CHAMBER 2. PERFORATION SPACING: CRAWL SPACE DAILY DESIGN FLOW: 2 (NOT TO SCALE) (NOT TO SCALE) _ (NOT TO SCALE) REDUCTIONS REQUESTED UNDER TITLE 5: SEPTIC TANK REQUIREMENT p BUOYANT FORCE ON TANK (ASSUMING FULLY SUBMERGED): 17,690 LB EXISTING 5. .. 4"P PVC WEIGHT OF EMPTY TANK: 14,500 5/4 DECK BOARD (TIP.) 4'1 SCH.40 PVC H.O.sox VALVE UNE OF RETAININ BOX [TYP.) CAPPED POPPED INSPECTION '.. PORT (TVP.) H-20 CONCRETE SEPTIC TANK 2x6 TIMBER SLEEPER (TVP.) rFLUSM WITH TOP OF WALL CAPPED INSPECTION PORT (TYP.) r I I TOP OF WOOD BOARDWALK £L. - 9.2't LATERAL LENGTH: TOP OF FINISH FLOOR 1. PROPOSED 2'A NORMALLY REQUIRED. TOTAL WEIGHT OF EMPTY TANK AND SOIL COVER (18,28011 TOTAL LATERALS: 0 SPECIFICATIONS. 0 REQUIREMENT: EXCEEDS BUOYANT FORCE ON FULLY SUBMERGED TANK (17,69OLS) 2 INCH DIAMETER MAIN 40.1 PERCOLATION RATE <5 MINUTES PER INCH IN MEDIUM SAND 2.0 FEET 3. . 'O F SUBSURFACE AREA DESIGN REQUIREMENT i a) 6't TO THE 10' REQUIRED SETBACK FOR PROPOSED PUMP CHAMBER TO SIDE PROPERTY LINE. (4't SETBACK PROVIDED) DESIGN LOADING FOR ALL PRE -CAST UNITS: AASHTO-H-10-44, H-20-44 WHERE VEHICLE LOADS ARE ANTICIPATED 9.52' ELEV. (REFERENCE: 310 CMR INSTALL (H-20) TO WITHIN 6" RISER AND COVER OF FINISH GRADE PROPOSED 4 INSTALL (H-20) RISER AND 30" DIAMETER COVER PUMP LEVELS SHALL BE CONTROLLED BY FLOAT SWITCHES OR APPROVED EQUIVALENT. z p z is �F BE 1. ALL ORIFICES SHALL BE LOCATED AT THE INVERT OF THE DISTRIBUTION LATERAL WITH THE b) 6'f TO THE 10' REQUIRED SETBACK FOR PROPOSED PUMP CHAMBER TO FOUNDATION WALL. (4't SETBACK PROVIDED) EXCEPTION OF THE DISTAL ORIFICES (1 PER LATERAL) WHIr^H SHALL BE LOCATED AT THE b) 20't TO THE 20' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO FOUNDATION WALL. (0' SETBACK PROPOSED) CROWN TO ALLOW AIR WITHIN TO FINISH GRADE ► [y 'EXISTING p�p O PARKING AREA 5/4 DECK BOARD (TVP.) '., ELEVATION - 6.0'* w 2 CYAN SAND aACKF1LL FINISH FLOOR 7 3 FLU TIMBER SLEEPER (Tl?,) FLUSH WITH TOP OF WALL _ TOP OF WOOD BOARDWALK EL - 0.2' CONNECTIONS CALTHROUGH / / -.. ., TOP OF LINER/RETAINING WALL El. - $'3 4" SCH.40 9" MINIMUM TALL O BE ROUTED I PVC SEWER 9" MINIMUM JUNCTION BOX / SLOTTED CRIFICe 1"o SCH.40 PVC FILTER FABRIC- 1'3 4" SCH.40 SHIELD (TIP.) - OISTRISUTCN LATERAL. (TYP. TOP OF CHAMBER EL - 19.2'3 PVC SEWER (TVP. 5.00' REMOVE SHINGLES ON EXISTING IN - FOUNDATION AND PROVIDE OUT- ELEV. FLASHING AND VINYL LINER LATERAL INVERT EL. - 7.193' IN r- t ELEV. 3.83' UFT CHAIN+- 20'3 2" SCH.40 33' �_-� _ 3" 3.58' PVC FORCE MAIN - - �- ELEV. 3.50 2'03 ; aOTTOM OF CHAMBER EL. - 7.50' ELEV. TRUE UNION 3.50'3 INSTALL INLET TEE ELEV. BALL VALVE ELEV, o. o• 1/4" cmncE 3/4" TO 1-1/2" DOUBLE 0.0' (10" MIN.) ESTIMATED HIGH O INVUT (TVP.) WASHED STONE (TVP.) INSTALL OUTLET TEE GROUNDWATER ELEV-2.5" 3/6' BLEEDER ` 2" DIA. SCH.40 - e-OOSTWG/IMPORTED CLEAN SAND -0 1 WITH GAS BAFFLE 1 38" CHECK VALVE PVC FORCE MAINx CTYP.) 5.0' (14" MIN.) CVLTEC FIELD DRAIN CONTACTOR C4 CHAMBER STgtAOE CA ACITY ABOVE PUMP LEVEL SIMPLEX MYERS WHR5H CHAMBER WIDTH - 4.0' 81" 270 GALLONS HIGH HEAD WASTEWATER PUMP - - BOTTOM OF LINER E4 - 5.0'3 PUMP OPERATION TO BE CONTROLLED FIELD INSTALL 16" LAYER BY FLOAT SWITCHES HIGH GROUNDWATER EL. - 2.5' ;. - NON -REINFORCED CONCRETE t6 (MIN. 1401b/Gust. UNIT WT) OPERATION c TTN .c� _ D REMOVE A NSUITABLE SOILS Ftl_LY"a TOP ' -(MEASURED -, R FR M TANK ) O FLOPC�OUNOwTOH B LAYERS) BETWEEN RErwINING WALL W VNTL CLEAN SAND ALL ' - B •, . �.- t ' ' A HIGH WATER ALARM ON: -22" NTERM. 6" OF CRUSHED STONE 7 FOR D SIGN L.-2.5' PUMP ON:- Ia- )� SUMP (PUMP OFF 12"CUR RO LACIMI OL EX3,tVATED MATERIALWT" CLEAN SAND SLEEVE EXISTING WATER LINE 3. 6" OFCRUSHEDSTONE-- PROPOSED SOIL ABSORPTION BED CONFIGURATION: SOIL ABSORPTION SYSTEM (END VIEW) 2 1000 GALLON (H-20) CONCRETE SEPTIC TANK 5.00 I.D. (H-20) CONCRETE PUMP CHAMBER 2. PERFORATION SPACING: CRAWL SPACE DAILY DESIGN FLOW: 2 (NOT TO SCALE) (NOT TO SCALE) _ (NOT TO SCALE) REDUCTIONS REQUESTED UNDER TITLE 5: SEPTIC TANK REQUIREMENT L BUOYANT FORCE ON TANK (ASSUMING FULLY SUBMERGED): 17,690 LB EXISTING 5. .. 4"P PVC WEIGHT OF EMPTY TANK: 14,500 5/4 DECK BOARD (TIP.) 4'1 SCH.40 PVC H.O.sox VALVE UNE OF RETAININ BOX [TYP.) CAPPED POPPED INSPECTION '.. PORT (TVP.) H-20 CONCRETE SEPTIC TANK 2x6 TIMBER SLEEPER (TVP.) rFLUSM WITH TOP OF WALL CAPPED INSPECTION PORT (TYP.) r I I TOP OF WOOD BOARDWALK £L. - 9.2't 2.0 SCH.40 SLOTTED ORIFICE PVC MANIFOLD ELD (TYP.) 0 O 14qt OOO0 O O 0 0 0 0 0 0 00002- SCH.40 ORIFICE O INVERT (TYP.) TEE/ELBOw WITH (5 R£OUIRED THIS SECTION) EXISTING/IMPORTED CLEAN SONO 2': 1" BUSHING (1) FULL CULTEC FIELD GRAIN CONTACTOR C4 CHAMBER (1) CUT CULTEC FIELD DRAIN CONTACTOR C4 CHAMBER (Ef ECTVE LENGTH 9.5') R-11111i1Y1Y-i ELEVATION U V 1.00" DIAMETER TOP ' NEEN CHAMBER DISTRIBUTION LATERAL DETAIL 18"-30", (NOT TO SCALE) B LOAMY SAND tR!0_A1 3.5'-(-1.0') .. CHAM_ Iloilo w'�',�'m'�'�'�'�' FOR D SIGN L.-2.5' �'Ill�'�1�'Il�'I�'�'ilk 7. SLEEVE EXISTING WATER LINE 3. PLA TFORM-1N_TWS ,AREA PROPOSED SOIL ABSORPTION BED CONFIGURATION: 1. - INSIDE SEWAGE DISPOSAL SYSTEM DESIGN: 2. PERFORATION SPACING: CRAWL SPACE DAILY DESIGN FLOW: 2 BEDROOMS ® 110 GALLONS PER DAY PER BEDROOM e 220 GALLONS BOTTOM OF CHAMBER EL. - 7.50' _ • 5.46 -_-----------•- REDUCTIONS REQUESTED UNDER TITLE 5: SEPTIC TANK REQUIREMENT BUOYANT FORCE ON TANK (ASSUMING FULLY SUBMERGED): 17,690 LB EXISTING 5. 220 GALLONS x 200% - 440 GALLONS MINIMUM CAPACITY REQUIRED WEIGHT OF EMPTY TANK: 14,500 LB TIMBERS-� UPON APPROVAL OF THE DESIGN ENGINEER. INSTALL '.1,000 GALLON ORIFICE SHIELD TO BE SLOTTED TYPE MANUFACTURED BY ORENCO SYSTEMS INCORPORATED. ALTERNATE ORIFICE SHIELD MAY BE TED FOR THE UNIT SHOWN IF APPROVED BE EQUIVALENT BY THE DESIGN ENGINEER. BE FILTER FABRIC IS TO BE INSTALLED OVER LATERALS AND ORIFICE SHIELDS BEFORE SACKFlLUNG IWTH SAND BACKFILL OVER LAYER OF FILTER FABRIC Wn ON-SITE SAND FILL FILTER FABRIC. 1.00" DIAMETER BAND BACKFILL SCH. 40 LATERAL - - ♦<i FIC ELEVATION U V 1.00" DIAMETER �1 R n6ovE // SCH. 40 LATERAL ORIFICE SHIELD DETAIL 18"-30", (NOT TO SCALE) B 3 `ULA` (EFFEOTVVE"LENGTH CONTACTORCHAMBERS - -5.0' CONTRACTOR TO REVIEW ON-SITE WITH OWNER BOTTOM OF LINER EL. - 5.0'3 PRIOR TO CONSTRUCTION _ HIGH GROUNDWATER EL - 25' DEEP OBSERVATION HOLE LOGS: SOIL ABSORPTION SYSTEM (SIDE VIEW) DRIVE (% TEST DATE: JUNE 3, 2013 (NOT TO SCALE) s2P/60 j, � '+�-' TEST BY: CHRIS WICKSON - CERTIFIED SOIL EVALUATOR �Oir/JL 'BRUCE MURPHY - AGENT FOR BOARD OF HEALTH PERC RATE: IN MEDIUM OR FINE SAND < 2 MINUTES PER INCH (ASSUMED) PRE -CAST CONCRETE TANK SPECIFICATIONS: - TESTHOLE #1 ELEVATION - 6.0' TESTHOLE #2 ELEVATION - 5.5' 1. ALL PRE -CAST CONCRETE STRUCTURES SHALL BE WATERTIGHT AND CAPABLE SD � BENCHMARK OF WITHSTANDING AASHTO HS20 LOADING. NAIL SET IAr CORNER BOARD DEPTH ELEVATION HORIZON TEXTURE GROUNDWATER ELEVATION MONITORED 6.0'-4.5' FILL WINDBLOWN SAND 18"-30", 4.5'-3.5' B LOAMY SAND 18"-84" 3.5'-(-1.0') C MEDIUM SAND DEPTH ELEVATION HORIZON TEXTURE. GROUNDWATER ELEVATION MONITORED 5.5'-0.7' C MEDIUM SAND REFERENCE: CERTIFICATION FOR GENERAL USE ISSUED BY MaDEP TO CULTEC, INC. THE LATERALS SHALL BE INSTALLED LEVEL TO ALLOW DRAINING FOLLOWING EACH DOSE CYCLE. SET AT TESTHOLE p1 AT 20min. INTERVALS FROM 6/05/2013 TO 6/12/2013 4. ALL CONSTRUCTION JOINTS BETWEEN PRE -CAST SECTIONS AND 2. ALL SEWER LINE PENETRATIONS INTO PRE -CAST COMPONENTS SHALL BE AS ELEVATION = O:_' ' - SHOWN ON PLANS. CONNECTIONS OF PVC PIPING TO CONCRETE STRUCTURES EXISTING SHALL BE MADE BY THE USE OF A FLEXIBLE NEOPRENE BOOT INSTALLED IN OVERHEAD PROPOSED 1000 GALLON THE PRE -CAST OPENING DURING MANUFACTURE. SEALS SHALL BE OF CORRECT RO CONCRETE SIZE FOR THE PIPE DIAMETER AND INCLUDE STAINLESS. STEEL CLAMPS. UTILITIES r 3. THE CONTRACTOR AND MANUFACTURER ARE RESPONSIBLE FOR ASSURING THAT/ SEPTICTANK APPROXIMATE LOCATION OF EXISTING OpIG P. Y. DAC (220 Gpd / 0.74 Gpd/Sq.Ft.) - 297 Sq.Ft. REQUIRED AT FULL SIZE BUOYANT FORCE ON CHAMBER (ASSUMING FULLY SUBMERGED). 11,910 LB SCH. 40 PVC GRAVITYt. 5 " " 104ts' O 297 Sq.Ft. x 75% - 223 Sq.Ft. REQUIRED WITH 25% REDUCTION WEIGHT OF EMPTY CHAMBER WITH ADDITIONAL CONCRETE: 9,980 LB SEWER (TYR) - WEIGHT OF SOIL COVER OVER CHAMBER: 2,543 LB BATH 1.83 + USING CULTEC CHAMBERS IN A BED CONFIGURATION WITHOUT AGGREGATE .. �- AS SPECIFIED IN 310 CMR 15.251 (1)(e), THE SYSTEM SHALL BE SIZED USING TOTAL WEIGHT OF EMPTY CHAMBER AND SOIL COVER 1`12 523LB) WA11 AN EFFECTIVE LEACHING AREA OF 6.7 Sq.Ft/LIn.Ft• FOR FIELD DRAIN CONTACTOREXCEEDS ALL PRE -CAST COMPONENTS ARE INSTALLED WATERTIGHT. PROPOSED -STAIRS-- WATER SERVICE GROUNDWATER ELEVATION MONITORED IN ON-SITE MONITORING WELL AND -PLATFORM! REFERENCE: CERTIFICATION FOR GENERAL USE ISSUED BY MaDEP TO CULTEC, INC. THE LATERALS SHALL BE INSTALLED LEVEL TO ALLOW DRAINING FOLLOWING EACH DOSE CYCLE. SET AT TESTHOLE p1 AT 20min. INTERVALS FROM 6/05/2013 TO 6/12/2013 4. ALL CONSTRUCTION JOINTS BETWEEN PRE -CAST SECTIONS AND RISERS SHALL TRANSMITTAL No. W037676, REVISED DATE OF ISSUE FEBRUARY 22. 2010. PRESSURE DISTRIBUTION HIGH GROUNDWATER ELEVATION FOR D SIGN L.-2.5' BE INSTALLED WITH BUTYL SEALS OR HYDRAULIC CEMENT. 7. SLEEVE EXISTING WATER LINE 3. PLA TFORM-1N_TWS ,AREA PROPOSED SOIL ABSORPTION BED CONFIGURATION: 1. FROM CURB S71CR 7t7 INSIDE SEWAGE DISPOSAL SYSTEM DESIGN: 2. PERFORATION SPACING: CRAWL SPACE DAILY DESIGN FLOW: 2 BEDROOMS ® 110 GALLONS PER DAY PER BEDROOM e 220 GALLONS SEPTIC TANK BUOYANCY CALCULATION: _ • 5.46 -_-----------•- REDUCTIONS REQUESTED UNDER TITLE 5: SEPTIC TANK REQUIREMENT BUOYANT FORCE ON TANK (ASSUMING FULLY SUBMERGED): 17,690 LB EXISTING 5. 220 GALLONS x 200% - 440 GALLONS MINIMUM CAPACITY REQUIRED WEIGHT OF EMPTY TANK: 14,500 LB TIMBERS-� UPON APPROVAL OF THE DESIGN ENGINEER. INSTALL '.1,000 GALLON H-20 CONCRETE SEPTIC TANK WEIGHT OF SOIL COVER OVER TANK: 3,780 LB 6. LATERAL LENGTH: (REFERENCE: 310 CMR 15.404:(2)(c) - MAXIMUM FEASIBLE COMPLIANCE OF RETENTION TIME E OR1000GALLONS HAS BEENPROVIDED WHERE A 1500 GALLONTANK IS 1. PROPOSED 2'A NORMALLY REQUIRED. TOTAL WEIGHT OF EMPTY TANK AND SOIL COVER (18,28011 TOTAL LATERALS: SCH. 40 PVC FORCE SPECIFICATIONS. SOIL ABSORPTION SYSTEM REQUIREMENT: EXCEEDS BUOYANT FORCE ON FULLY SUBMERGED TANK (17,69OLS) 2 INCH DIAMETER MAIN 40.1 PERCOLATION RATE <5 MINUTES PER INCH IN MEDIUM SAND 2.0 FEET 3. . 'O 257 REDUCTION IN REQUIRED SUBSURFACE AREA DESIGN REQUIREMENT PUMP CHAMBER BUOYANCY CALCULATION: a) 6't TO THE 10' REQUIRED SETBACK FOR PROPOSED PUMP CHAMBER TO SIDE PROPERTY LINE. (4't SETBACK PROVIDED) DESIGN LOADING FOR ALL PRE -CAST UNITS: AASHTO-H-10-44, H-20-44 WHERE VEHICLE LOADS ARE ANTICIPATED ,gl (REFERENCE: 310 CMR 15.405:(c) - CONTENTS OF LOCAL UPGRADE APPROVAL a) 4't TO THE 10' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO ROAD PROPERTY LINE. (6't SETBACK PROVIDED) PROPOSED 4 _ PUMP LEVELS SHALL BE CONTROLLED BY FLOAT SWITCHES OR APPROVED EQUIVALENT. a) 9't TO THE 10' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION TO SIDE PROPERTY LINE. (1't SETBACK PROVIDED) PRESSURE DISTRIBUTION SYSTEM NOTES: 5. BE OpIG P. Y. DAC (220 Gpd / 0.74 Gpd/Sq.Ft.) - 297 Sq.Ft. REQUIRED AT FULL SIZE BUOYANT FORCE ON CHAMBER (ASSUMING FULLY SUBMERGED). 11,910 LB SCH. 40 PVC GRAVITYt. 5 " " 104ts' O 297 Sq.Ft. x 75% - 223 Sq.Ft. REQUIRED WITH 25% REDUCTION WEIGHT OF EMPTY CHAMBER WITH ADDITIONAL CONCRETE: 9,980 LB SEWER (TYR) - WEIGHT OF SOIL COVER OVER CHAMBER: 2,543 LB BATH 1.83 + USING CULTEC CHAMBERS IN A BED CONFIGURATION WITHOUT AGGREGATE .. �- AS SPECIFIED IN 310 CMR 15.251 (1)(e), THE SYSTEM SHALL BE SIZED USING TOTAL WEIGHT OF EMPTY CHAMBER AND SOIL COVER 1`12 523LB) WA11 AN EFFECTIVE LEACHING AREA OF 6.7 Sq.Ft/LIn.Ft• FOR FIELD DRAIN CONTACTOREXCEEDS BUOYANT FORCE ON FULLY SUBMERGED CHAMBER (11,910L6) PROPOSED -STAIRS-- C4 CHAMBER. 55 t--: DRIP -j JAA AND -PLATFORM! REFERENCE: CERTIFICATION FOR GENERAL USE ISSUED BY MaDEP TO CULTEC, INC. THE LATERALS SHALL BE INSTALLED LEVEL TO ALLOW DRAINING FOLLOWING EACH DOSE CYCLE. .��'�� f 33 REMO VE --EMTING ' SLURS -& TRANSMITTAL No. W037676, REVISED DATE OF ISSUE FEBRUARY 22. 2010. PRESSURE DISTRIBUTION SYSTEM SPECIFICATIONS: Commissiotl / p /--\Z- 7. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH COMM. 3. PLA TFORM-1N_TWS ,AREA PROPOSED SOIL ABSORPTION BED CONFIGURATION: 1. PERFORATION SIZE: 1/4 INCH DIAMETER TOTAL LENGTH OF CULTEC FIELD DRAIN CONTACTOR C4 CHAMBER - 34.0' 2. PERFORATION SPACING: 2'-0" ON CENTER 5't TO THE 10' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO WATERLINE. (5't SETBACK PROVIDED) 34.0' x 5.7 Sq.Ft./LIr1.Ft. - 227 Sq.Ft. PROPOSED > 223 Sq.Ft. REQUIRED 3. PERFORATIONS PER LATERAL: 17 PERFORATIONS CONTRACTOR TO NOTIFY DIG -SAFE PRIOR REDUCTIONS REQUESTED UNDER TITLE 5: 4. LATERAL DIAMETER: 1 INCH DIAMETER Al 310 CMR 15,404, MAXIMUM FEASIBLE COMPLIANCE -APPROVALS FOR UPGRADES 5. LATERAL SPACING: 1 FT. ON CENTER EXISTING SINGLE FAMILY RESIDENCE GENERAL NOTES: UPON APPROVAL OF THE DESIGN ENGINEER. -' ( CRAWLSPACE FOUNDATION) (2)(a) K WITHN EFFECTIVELIQUID CAPACITY PROVIDING LESS THAN 24HOURS 6. LATERAL LENGTH: 34.0 FEET OF RETENTION TIME E OR1000GALLONS HAS BEENPROVIDED WHERE A 1500 GALLONTANK IS 1. DATUM IS N.G.V.D. NORMALLY REQUIRED. 7. TOTAL LATERALS: 3 LATERALS SPECIFICATIONS. 310 CMR 15,405• CONTENTS OF LOCAL UPGRADE APPROVAL 8. MANIFOLD DIAMETER: 2 INCH DIAMETER a) 10't TO THE 10' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO ROAD PROPERTY LINE. (0' SETBACK PROVIDED) 9. MANIFOLD LENGTH: 2.0 FEET 3. a) 10'3 TO THE 10' REQUIRED SETBACK FOR PROPOSED PUMP CHAMBER TO ROAD PROPERTY LINE. (O' SETBACK PROVIDED) MYERS WHRSH 1/2HP HIGH HEAD WASTEWATER PUMP, 115 VOLT SINGLE PHASE E FOR SEWAGE PARCEL 9 a) 6't TO THE 10' REQUIRED SETBACK FOR PROPOSED PUMP CHAMBER TO SIDE PROPERTY LINE. (4't SETBACK PROVIDED) DESIGN LOADING FOR ALL PRE -CAST UNITS: AASHTO-H-10-44, H-20-44 WHERE VEHICLE LOADS ARE ANTICIPATED _;-fes a) 4't TO THE 10' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO ROAD PROPERTY LINE. (6't SETBACK PROVIDED) OR WHEN SUBJECT TO 4 FT. OR MORE OF COVER. _ PUMP LEVELS SHALL BE CONTROLLED BY FLOAT SWITCHES OR APPROVED EQUIVALENT. a) 9't TO THE 10' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION TO SIDE PROPERTY LINE. (1't SETBACK PROVIDED) PRESSURE DISTRIBUTION SYSTEM NOTES: 5. b) 6't TO THE 10' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO FOUNDATION WALL. (4' SETBACK PROVIDED) 1. ALL ORIFICES SHALL BE LOCATED AT THE INVERT OF THE DISTRIBUTION LATERAL WITH THE b) 6'f TO THE 10' REQUIRED SETBACK FOR PROPOSED PUMP CHAMBER TO FOUNDATION WALL. (4't SETBACK PROVIDED) EXCEPTION OF THE DISTAL ORIFICES (1 PER LATERAL) WHIr^H SHALL BE LOCATED AT THE b) 20't TO THE 20' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO FOUNDATION WALL. (0' SETBACK PROPOSED) CROWN TO ALLOW AIR WITHIN THE LATERAL TO BE PURGED DURING EACH DOSE. BED '1'o AtsR9A T.H.; �TCHEN � 56 PROPOSED 51 D. ... H-20 PUMP CHAMBER EXISTING CESSPOOL TO- UE O-BE REMOVED EXISTING WOOD RETAINING WALL a � CONC' -PROPOSED PRESSURE DOSED - SOIL ABSORPTION SYSTEM .6, (1) FULL CULTEC C-4 CHAMBER & (1) CUT CULTEC C-4 CHAMBER OVERALL LENGTH 9.5' PROPOSED RETAINING WALL TOP OF WALL'-ELEV.=9.0' 4 PROF05ED BOARDWALK`OYER SA.S... AREA BETWEEN HOUSE AND -RETAINING 1,WALL (REdfOVABLE-FOR-;SAS- MAINTENANCE) INSTALL 4FT. TALL VINYL LINER ALONG BLOCK FOUNDATION WALL AND INSIDE OF RETAINING WALL yIp1G PROPOSED PRESSURE DOSED SOIL ABSORPTION SYSTEM ROOM (3) CULTEC C-4 CHAMBERS DECK �a OVERALL LENGTH 24.5' WALK � � � � EXISTING PILINGS TO REMAIN TO THE STING BOARD - " .6 EXTENT POSSIBLE. 5. #2 PROPOSED"STRAW.BALR� sB 'RE " ILL &r DEWATERING -=P PO EF P' y 'LAYER BE7TF" HOUSE �] ( AND RETADIING MALL T OF I � (--'� 11 EXISTING SURFACE., 5 !LO 1 ELEVATION (TYP) S. (10.5' SECTION OF S.A.S.. IS O' FROM FOUNDATION WALL, 24.5' SECTION IS 2't FROM FOUNDATION WALL) INSTALLATION OF GARBAGE GRINDERS. 55 t--: DRIP -j JAA rMouth Conservation 2. THE LATERALS SHALL BE INSTALLED LEVEL TO ALLOW DRAINING FOLLOWING EACH DOSE CYCLE. .��'�� f 33 C) A 257 REDUCTION TO THE REQUIRED SUBSURFACE SEWAGE DISPOSAL AREA DESIGN REQUIREMENT. POWERED BY 11 NANTUCKET Commissiotl / p /--\Z- 7. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH COMM. 3. THE FORCE MAIN SHALL BE PITCHED BACK TO THE PUMP CI AMBER TO ALLOW COMPLETE��� //�""--�---J PARCEL 7 f) 7't TO THE 50' REQUIRED SETBACK FOR PROPOSED SOIL ABSORPTION SYSTEM TO MEAN HIGH WATER. (43't SETBACK PROVIDED) DRAINING FOLLOWING EACH DOSE CYCLE. g) 5't TO THE 10' REQUIRED SETBACK FOR PROPOSED SEPTIC TANK TO WATERLINE. (5't SETBACK PROVIDED) SOUND ,i�///' #CH CONTRACTOR TO NOTIFY DIG -SAFE PRIOR TO CONSTRUCTION. (1 -888 -DIG -SAFE) 5. EQUIVALENT SYSTEM COMPONENTS BY OTHER MANUFACTURERS MAY BE SUBSTITUTED ONLY Al JUN 25 7M. DOSING PUMP SYSTEM SPECIFICATIONS: CORS L GENERAL NOTES: UPON APPROVAL OF THE DESIGN ENGINEER. -' 9. 1. SYSTEM REQUIREMENT: SUBMERSIBLE SIMPLEX SEWAGE PUMP CAPABLE OF PASSING 1-Y4" SOLIDS, 36 1. DATUM IS N.G.V.D. AND PUMPING 65 GPM ® 19 FT. T.D.H. SOIL ABSORPTION SYSTEM. .--' PARCEL 8 3 2. MUNICIPAL WATER IS AVAILABLE SPECIFICATIONS. PUMP MODEL SPECIFIED: �/ C n t�/29/1 ALL ELECTRICAL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICIAN UNDER A PERMIT 3. PIPE PITCH: 1/8" PER FOOT MINIMUM ON 4" SCH. 40 PVC MYERS WHRSH 1/2HP HIGH HEAD WASTEWATER PUMP, 115 VOLT SINGLE PHASE E FOR SEWAGE /-575 SQ. FT.f 9 -fl 4. DESIGN LOADING FOR ALL PRE -CAST UNITS: AASHTO-H-10-44, H-20-44 WHERE VEHICLE LOADS ARE ANTICIPATED _;-fes OR WHEN SUBJECT TO 4 FT. OR MORE OF COVER. 2. PUMP LEVELS SHALL BE CONTROLLED BY FLOAT SWITCHES OR APPROVED EQUIVALENT. 5. MINIMUM GROUND COVER OVER ALL SEWAGE LEACHING FACILITIES: (0.75) FT. 3. FORCE MAIN SHALL BE 2" DIA. SCH. 40 P.V.C. PIPE - PLACE 1C.F. OR EQUIVALENT` CONCRETE THRUST BLOCKS AT ALL FORCE MAIN ANGLE POINTS 1` ` S. THIS DESIGN DOES NOT PROVIDE FOR THE INSTALLATION OF GARBAGE GRINDERS. rMouth Conservation 4. THE CONTROL PANEL AUDIO AND VISUAL HIGH WATER ALARM SHALL BE POWERED BY 11 NANTUCKET Commissiotl 7. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH COMM. OF MASS. STATE ENVIRONMENTAL CODE TITLE 5. A SEPARATE CIRCUIT FROM THE PUMP. SOUND ,i�///' 8. CONTRACTOR TO NOTIFY DIG -SAFE PRIOR TO CONSTRUCTION. (1 -888 -DIG -SAFE) 5. EQUIVALENT SYSTEM COMPONENTS BY OTHER MANUFACTURERS MAY BE SUBSTITUTED ONLY Al JUN 25 7M. UPON APPROVAL OF THE DESIGN ENGINEER. -' 9. NO KNOWN WELLS PROVIDING WATER FOR HUMAN CONSUMPTION ARE KNOWN TO EXIST WITHIN 100' OF PROPOSED SOIL ABSORPTION SYSTEM. 6. ALL SYSTEM COMPONENTS ARE TO BE INSTALLED PER MANLFACTURERS SPECIFICATIONS. �/ C n ALL ELECTRICAL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICIAN UNDER A PERMIT F IV E D E FOR SEWAGE SYSTEM DESIGN PURPOSES ONLY UNDER NO CIRCUMSTANCES ARE _;-fes 10. THIS SITE PLAN IS INTEND D ISSUED BY THE TOWN OF YARMOUTH. 09 I...-_ BEARINGS, DISTANCES, OR FEATURES SHOWN TO BE USED TO ESTABLISH PROPERTY LINES. \, 11. EXISTING SITE FEATURES INCLUDING TOPOGRAPHY AND BUILDING LOCATION TAKEN FROM SITE PLAN DATED MARCH 19, 2013 7. A SEPARATE EXTERIOR ELECTRICAL DISCONNECT SWITCH SHALL BE PROVIDED WITHIN SIGHT - PREPARED BY SLADE ASSOCIATES, INC. FOR DAWN KAROL. DISTANCE OF THE PUMP CHAMBER TO DE -ENERGIZE THE PUMP PRIOR TO ACCESS. NEI LN. I LOCUS T"5P LOCUS MAP J. <�' j It3 13 DA+E East Cape Engineering, Inc. CIVIL ENGINEERS LAND SURVEYORS # 44 Route 28, Orleans, Mass. (508) 255-7120 SITE PLAN SANITARY SUBSURFACE SEWAGE DISPOSAL SYSTEM or LOCATION: 53 SOUTH SHORE DRIVE YARMOUT'He MA REFERENCE: ASSESSORS MAP 19 PARCEL 8 PREPARED FOR: DAWN KAROL 1 2 3 No. Revision/Issue Date �Otecr' JOB{ 03-050 Sheet 03050SSP. dwg Date 06/13/13 1 OF 1 Scale 1 "=10'