Loading...
HomeMy WebLinkAbout83-1872 - Site & Sewage Disposal Plan�- 24' -^{ 1500 GAL. SEPTIC TANK 4'�- 9 max. __° , J1 9 'ELEV.7. DB -6 Dist.BOX SYSTEMM 'PROFILE to scale Q I = G QveStir Q � O o � 4., O cc 4,5 Bench Mark ` \ g Eolt l Ta of t C� EI 5.64 \*,1 �- 48 <y I tai. f �nF r Ni I r�� r 4.4' 4.5 << 411 E ti � 5,3 , t� e 5.4 iF i l t or Fabric 1/8'to 1/2' 4' Perf•Insp Port w/ double washed screw cap and lawn cover stone _ 3/4'toi1/�. daub le xashed- Z �k LEV 7.55 t n - ^ 1' --- 11 5 3 , •; 5, 1 ELEV. -4 X 1 }': 6 Deep A j. High GVJ / STONE FIELD OCA TION MAP 1'17' TEST HOLE iT2. o� J L HSsesso,-S Mai) Por cel G5-4 TEST HOLE D o - Lecmy and s. A 10YR_4/1 8 - Design Flow: 3 bedrooms C _� I 16-- Locm EL. 8 3 D 10YR_-4/E - x 2CO% o p O'ganic Sand Use 1530 5'= --- Lccmy 5od n inr�^ 7.3'- 0.6) - , e 8,_ t OYR� 1 DATE: 8/30/06 PERFORMED BY: Craig P. Short, PE Amy VonHone, HA min. /in ® E Fine Sanc Existing 0.74Ga1 sf = 333 Gal. 5'- 1 GY--- Ry- Lccmy SOrd House & Deck To Be P,emave „ R 1'OYR44 (TCF 4 El?.75) Zone A(.5/06-7 .3') 3 2 -- Fine -Medium EI 1.9 432-2878 Sand M l to YAP1If UTH, C 10YR7/6 n in h_ 12 0 " - j__ 5.4 iF i l t or Fabric 1/8'to 1/2' 4' Perf•Insp Port w/ double washed screw cap and lawn cover stone _ 3/4'toi1/�. daub le xashed- Z �k LEV 7.55 t n - ^ 1' --- 11 5 3 , •; 5, 1 ELEV. -4 X 1 }': 6 Deep A j. High GVJ / STONE FIELD OCA TION MAP 1'17' TEST HOLE iT2. o� EL. L HSsesso,-S Mai) Por cel G5-4 0 - Organic SYJTE�I D o - Lecmy and s. A 10YR_4/1 8 - Design Flow: 3 bedrooms Fine Sand - 10YR7/1 2a I 16-- Locm APPRO'\/ED FILL SOIL. 3.) DESIGN ENGINEER TO CERTIFY SOILS OF D 10YR_-4/E - x 2CO% 34" _ Fine -Medium i C Sand Use 1530 1OYR7/6 Septic Tonk n inr�^ 7.3'- 0.6) - PRIOR TO BACKFILLING. 5.) COM,PCNENTS ARE TO BE WITHIN 3' OF 120" - 0'x 15'x DATE: 8/30/06 PERFORMED BY: Craig P. Short, PE Amy VonHone, HA min. /in ® C Layer IWITNESS: Perc. Rote: =2 0.74Ga1 sf = 333 Gal. j GROUNDWATER ADJ. I Groundwater Found EI 0.8 I Index W-11' MiW-29 941 MAI PJ TREE Zone A(.5/06-7 .3') SO. HARV•�'ICH, tv:A 02661 Adi. G.'A'. death = EI 1.9 D�SIGf�I 1.) EXiSTItIG CESSPOOLS ARE TO B L HSsesso,-S Mai) Por cel G5-4 106 SYJTE�I col da = 330 gal. 110 / y Deed: Bk.213A3, P9. 1, 6 Design Flow: 3 bedrooms 2a Plan: Bk.14E,, Py.79 APPRO'\/ED FILL SOIL. 3.) DESIGN ENGINEER TO CERTIFY SOILS OF Septic Tank: 330 gal. x 2CO% = 660 gal. EXCAVATIONS PRIOR TO SYSTEM INSTALLATION. Lot 7 Use 1530 Gal. Septic Tonk PRIOR TO BACKFILLING. 5.) COM,PCNENTS ARE TO BE WITHIN 3' OF Leechina Facility: 0'x 15'x 6"deep Leaching Field AND ARE TO HAVE A MINIMUM OF 1' OF SOIL COVER. Bottom: .30% 15' x 0.74Ga1 sf = 333 Gal. HEALTH AGENT. OP.AN E Note: Garbage dispos I is not permitted with this design. 941 MAI PJ TREE 4 .7, I p�0 � pGSe ? .01 1-O' h Toa Of Qlab 3.5' r (P EI 9.0 _2 Prov'd1 18'x24"min E c, .Access Door PROPOSED HOUSE Tc: Focndat:cn Toc of Sab yFl B.0 .... /y p 0 � N LOT i " - 41,053 jr 0.94 AC RPs`rve `', i 6 r I Elevations are Based on Level F ------------ Using USGS Ref. Mark RM -25 Trtyt(NGVD 1929 Datum) A:3 Bench Mark and Flood Zones Are on FIRM 250015 00060 78 AT G _-( C; Lawn Box4" Screw Cap v,/Magnetic Tape _- Perforated Pipe Fieldi:I_ To Btm. of Stone 1 Use min.: 2- 3/8" Holes Q 2" vert.spocing ME PORT DETAIL LEACH FIELD DETAIL 30' I n� Fol 13' 13' 13' I 1.5' �-- 15' Jy 5 CFIDHSEPTIC SYSTEM NOTES r REMOVED FOUNDATION VENTING NOTES -ca /'1 1.) 8"x16" Smart Vent brand flood and :entllati vents ore to be installed where shown. 2.) Top of Vents ore to be instcllec below Efe,.tC 3.) Bottom of Vents are to be ,6th;n 12" of Finish -rode. 4.) A Vent is to be installed within 3' of each C'aWI Space corer. 5.} A minimum of 8 vents are to ce Inst^!�ec fo' the Crawi Space. A mirimum of 4 vents are to be installer' frr tie Garage. r vapor barrier Is to be instol'ed nc5' -10,0 sOace flc 6.) 0nil. PE Or m Joints are to be lopped a ir-murn �` 6'�. r 7.) Grade at bback of house is to e at Or t"Ov the ccwl space 1R"vi4' Access Door. 11001 �LMv I- _ E. ITE PLA•N SEWAGE L reponed For EA FR.P,4 tIv A i'JET TLES 88 "✓1hTTACHEE SOUTH YARMOUTH, 'uta PROJ- I �6 SC LE: I "=2 ECT: 09 %' I DATE: I/5/I 1.) EXiSTItIG CESSPOOLS ARE TO B 2 2.) ONSUI"ABLE SOILS ARE TO BE REMOVED AREA AND REPLACED FOR 5' WITH AROUND LEACHING 2a APPRO'\/ED FILL SOIL. 3.) DESIGN ENGINEER TO CERTIFY SOILS OF ALL SA 7.2 EXCAVATIONS PRIOR TO SYSTEM INSTALLATION. 4.) DESIGN ENGINEER TO CERTIFY SYSTEM INSTALLATION PRIOR TO BACKFILLING. 5.) COM,PCNENTS ARE TO BE WITHIN 3' OF FINISH GRADE AND ARE TO HAVE A MINIMUM OF 1' OF SOIL COVER. 6.) DIST. BOX IS TO BE WATER TESTED BY HEALTH AGENT. OP.AN E G l NE E R I NG4 I NC. . i,fSg4Q 2 ppNlEl P. 941 MAI PJ TREE SO. HARV•�'ICH, tv:A 02661 CF'OTEAU t4a 462`3 is 432-2878 �E �.cec Cl9TE M l to YAP1If UTH, aG t SSfON, E ITE PLA•N SEWAGE L reponed For EA FR.P,4 tIv A i'JET TLES 88 "✓1hTTACHEE SOUTH YARMOUTH, 'uta PROJ- I �6 SC LE: I "=2 ECT: 09 %' I DATE: I/5/I