HomeMy WebLinkAbout83-1882 - Site Plan002TOP OF FOUNDATION
ELEV.: 98.3
LEGEND:
20 FT. MINIMUM FROM CELLAR
10 FT, MINIMUM 10 FT. MINIMUM FROM SLARB OR CRAWL SPACE OPOSED I DOSI7NG
CONCRETE
COVERS 4" SCHEDULE 40 PVC PIPE
7 MIN. PITCH 1/8" PER FT.
4" CAST IRON PIPE
(OR EQUAL) MINIMUM
PITCH 1/4" PER FT.
TEE
CLEAN SAND
INSPECTION PORT
LOAM AND SEED
2" LAYER OF
1/6" TO 1/2"
WASHED STONE
93.02 MIN. PNOTTRQUIRED
FLOW UNE 92.27---o ELEV. - 92'3
ELEV.
-f'MIN. 2 o e _
I LEV, 9275 Li
o _ �_ _ �10- ` 90.94 40 ML VINYL.
ELEV. - _$ �Q_ GAS ELEV 91 94 6" SUMP ELEV. 91.n � o ELEY. a LINER
BAFFLE =DISTRIBUTION ELEV. 89.35
BOX 91.77 ELEV. e
(TO BE PLACED ON FIRM BASE) f 6 j H16H WACITr hVQl7RATORS N 7 STOVE � 5.00TO BE WATER TESTED 7N AN 11' 48' 10 ' 7R£NCH £GRAM PON
1500 GALLON IF MORE THAN ONE OUTLET
(TO BE PLACED ON FIRM BASE) SOIL ABSORPTION
WELL--MW-DO
SEPTIC TANK ZONE C
3/4" E 1 1/2" CLEAN SYSTEM (SAS) INDEX 22.5
DOUBLE WASHED STONE ADJUST 20
FREE OF FINES do SILT USING 1.74
USING PARTIAL USGS PROBABLE WATER TABLE ELEV. - -M$4_
SEWAGE DISPONOT SAL SCALE SYSTEM PROFILE OBSERVUSGS PROBABLE WATER TABLE ELEV. - ED WATERT BLE (12/28/05) ELEV. _ _NyaPOND)
BOTTOM OF TEST HOLE ELEV. s 76.2Q-
- o �l `56.
9
X400' 00'BQ r \ 3.7 10, 94.1 /
6
4:1 �I 96.3 T \
$ f \
' it's - ,�- W �-j ' W W9.I �
1 9 .84
I a \\ \
-'95 3 a.6 / i I .li �s4.o /• � '/ ,` I, \ 9,n \
. _ � •y�3
• 99.69 98.fi1g• �y G �V19U ' - / i 91.0 / / I / _ .6 \ SOIL
TEST 1
LOUISE LA -ATE ��I/ _.,I i
EXISTING SPOT ELEVATION 00,0
EXISTING CONTOUR----00----
FINAL SPOT ELEVATION 00.
FINAL CONTOUR
SOIL TEST LOCATION
-UTILITY POLE -0-
TOWN WATER -W---W
CATCH BASIN \ul
GAS LINE G'
CESSPOOL
CLEANOUT0.
k95.7 BOX\\
og,� / \ 93.8 � �,/ 94.2 � I 14J76' � / / `U}TTT 61•'5'
®98.7 /. _. �(g4)/ 93. /` ( 94.8 \ I / OVERDIG \�/
• 93.T`- h
�6 \ 67. B6" - �- _ 95.6 ' r;0 95.0 a \ 40 ML MNYL UN
\9117 9 r5 ry 1 /
9 CF 94.5 \ EXIST�NG
• 99.4 S 1 SEPTC TANK 95.1
\ \ \ S \ V 94.4 .95.0 20. B' -� 4 r i
'2 . 5.9 S 94.2 94 I A
I / 9 1
L " ` \ �\ / I ` s I 95 3 \ 95.04 I / .96.4
_ - _
\ \W. FxiSA 1�3.b sa.a J'
(9b) \ r �EXf L__ / /
N T I h 4 6 G DWELLING\ i %- BOX ST 4 LIMIT 97.2
a l\ 9.5.
cq'l 93 6 h DRY{4£LL ROOMS OVER151-C
FlORr 4.6 ^1j
\ ~ W93 9 3 95.X �`l 4 7 0� 1(96)'
/� • 97.6
a14•
\ - W AEW•RELOCATED
1n\ ggglll 1500�SALLON
?o
93.6 .93.2 ��� 4:1 451 \ \SEPTIC iANIL
\I \/ -- -- - 93.6
/O
4-594.7 94. FG%E \ \ w 9 7. 0
86.3 •�7.3 ' \
44
4.9 A\ \
85.0 89.1 �(901�
84.1 - 4.9 87.2 \ \ \ \
\\\-5•\ �\ 8.0
`^ k \ \ \ • 95.6
86.7 Z]�8.1 \ 6,• \ \�9gJ \
I \ \
rk \
\92.1 92.8 \
\\ \ \
4100*40
\�• \'� \
-\\. \ LOT 76
\\ 2E, 10 S.F
I 20' WIDE
DRAINAGE
III EASEMENT
I:
17.00
�I
OBSERVATION
HOLE
1 ELEV.
89.7
PERCOLATION RATE
5-2-
MIN./INCH IN
C2 CORIZON
DEPTH
HORIZ
TEXTURE
COLOR
MOTT.
OTHER
0-144
A
FILL
B LOAMY SAND
5-29 B
NO
STUMPS
144-156
Cl
BOG IRON
MEDIUM/
2.5Y7/3
41-120
CEMENTED
156-162
C2
MEDIUM
SAND
SCALE 1 = 20'
COARSE SAND
WATER ENCOUNTERED AT _ IDE_ ELEV. - __A02
SOIL TEST (LOTS 75 & 77)
DATE OF SOIL TEST DECEMBER 28, 2005
SOIL TEST DONE BY SWEETSER ENGINEERING
WITNESSED BY L. MULKEEN &_-g �IURP�IY
OBSERVATION HOLE 2 ELEV.-_ 89.7 OBSERVATION HOLE 3 ELEV.-_ 88.7
PERCOLATION RATE 1 2_ MIN./INCH AT _ 72_ INCHES PERCOLATION RATE < 2 MIN./INCH IN C CORIZON
J
DEPTH HORIZ
TEXTURE
COLOR
MOTT.
OTHER
0-5 O/E
MEDIUM SAND
10YR8/2
NO
B LOAMY SAND
5-29 B
LOAMY SAND
10YR6/6
C MEDIUM SAND
ROOTS
29-120 C
MEDIUM/
2.5Y7/3
41-120
C
MEDIUM/
COARSE SAND
°"'E APR. 16, 2009
WATER ENCOUNTERED AT __1DB"_ ELEV, - 80-2-
SOIL
aZSOIL TEST (LOT 76)
DATE OF SOIL TEST JANUARY 17, 2008
SOIL TEST DONE BY SWEETSER ENGINEERING
WITNESSED BY A. VON HOS
OBSERVATION HOLE 2 ELEV.=_95_2
PERCOLATION RATE Ste__ MIN./INCH AT _ 53 INCHES
DEPTH
HORIZ I TEXTURE
COLOR
MOTT. OTHER
0-4
',Ap LOAMY SAND
10YR5/2
NO
4-19
B LOAMY SAND
i0YR6/4
PROJECT LOCATION LOT 76
/1176 HASTINGS AVE., W. YAR.
19-120
C MEDIUM SAND
2.5Y7/2
10YR6/6
NO WATER ENCOUNTERED AT - 120" ELEV. = __BLZ_
T. A.
DUMAS
No. 619
DEPTH
HORIZI
TEXTURE
COLOR
MOTT.
OTHER
0-14
0/E
MEDIUM SAND
10YR8/1
NO
PROJECT LOCATION LOT 76
/1176 HASTINGS AVE., W. YAR.
14-41
B
LOAMY SAND
10YR6/6
ROOTS
41-120
C
MEDIUM/
2.5Y7/2
°"'E APR. 16, 2009
SCALE 1 = 20'
COARSE SAND
-
WATER ENCOUNTERED AT _96_ ELEV. - 80.7
DESIGN CALCULATIONS
NUMBER OF BEDROOMS 4
GARBAGE DISPOSAL UNIT �T6_
TOTAL ESTIMATED FLOW
( 110 GAL/BR./DAY X 4 9R.) _944- GAL./DAY
REQUIRED SEPTIC TANK CAPACITY X=- GAL.
ACTUAL SIZE OF SEPTIC TANK 1500 GAL.
SOIL CLASSIFICATION - I
DESIGN PERCOLATION RATE i¢_ MIN./IN.
EFFLUENT LOADING RATE __Qj GAL./DAY/S.F.
LEACHING AREA 628• _ SQ. FT.
(11X48)+(59X2)10/12)
LEACHING CAPACITY (AREA X RATE) _q3._0 GAL./DAY
828.33 X 0.74
RESERVE LEACHING CAPACITY NONE GAL./DAY
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR
THE SUBSURFACE DISPOSAL OF SEWAGE.
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
WTHIN 6" OF FINISHED GRADE,
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF
WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN
10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
4. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE SHALL
BE MORTARED IN PLACE.
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
IS TO CALL 'DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE.
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
IMMEDIATELY.
B. PARCEL IS IN FLOOD ZONE _ �
9. LOT IS SHOWN ON ASSESSORS MAP 76 AS PARCELS 236
10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR
A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED
WITH SAND AS SPECIFIED IN 310 CMR 15.255:(3).
11. ALL STUMPS, BRUSH, AND TREE DEBRIS ARE TO BE REMOVED FROM
UNDER ALL SEPTIC COMPONENTS AND BE REPLACED PER NOTE 10.
REPLACED WITH CLEAN COMPACTED FILL.
12. VARIANCES TO TITLE 5 AND YARMOUTH REGULATIONS:
A. USE OF ONLY A PORTION OF USGS WATER TABLE ADJUSTMENT.
B. NO RESERVE AREA.
13, EXISTING SEPTIC TANK IS TO BE PUMPED AND RELOCATED WHERE SHOWN.
14. GUTTERS, DOWNSPOUTS, AND DRYWELLS ARE TO BE INSTALLED.
15. HAYBALE WORKLIMIT IS TO BE INSTALLED AND REMAIN IN PLACE UNTIL
ITS REMOVAL IS AUTHORIZED BY THE CONSERVATION AGENT.
16. ALL DISTURBED AREAS ARE TO BE STABILIZED AND REVEGETATED.
ALTERNATIVE ADDRESS:
16 LOUISE LANE
WEST YARMOUTH
APPROVED: BOARD OF HEALTH
DATE
AGENT
02009 SWEETSER ENGINEERING
OLD TOWNHOUSE
� CONSTANCE
r
3 U
SHEFFIELD
SUFFOLK
LOUISE
n \ Val
LOCUS
D
PROPOSED SITE PLAN
FOR
LISA V. STILL, TR.
PROJECT LOCATION LOT 76
/1176 HASTINGS AVE., W. YAR.
SWEETSER EWGLN�V
203 SETUCKET ROAD
508- SOUTH . BOIS,713
385-6900 02660
°"'E APR. 16, 2009
SCALE 1 = 20'
JOB N0. 6311-01
REV.
LOCATION MAP
REV.
SHEET 1 OF 1
02009 SWEETSER ENGINEERING