Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2016LOCATION MAP ASSESSORS MAP: PARCEL: ?j2 FLOOD ZONE: 00-T AwUuR)j& REFERENCE:( tu�2DC0 /,,7 permit valid for REPAIR OF SEPTIC SYSTEM ONLY; due to State and l.oc:►I septic variances. Board. of health review and approval is required for ally. future additions/ren- ations/a iterations to sewage facilities and/or structures/dwelling. V.arniouth llealtb I)epartttient game: wo 112.35' GARDEN I I SAND PLAYGROUND LOT 1 22495E SF 6 p N�UtI �P •� TcH�" �1 I E�24 6. 26" PINE -IN/ 0 W Ce O I Z W Z DRAINAGE ESMT. EXIST -DN FL• 28.4' TOP sz F • ISI T I I zi 4ti 4" TR 1� 0 IL i a 60 100 _ Z CAP T. SMALL ROAD 1 BENCHMARK: CORNER BH AT EL 26.9, CONC• BND (HELD) CONC. BND f. BENCH0NAwfDRANT BOLT _ TEST !-TOLE LOGS SOIL EVALUATOR: lAov rn WITNESS:, MSI DATE: 60 1 PERCOLATION RATE,' /_ 2 Mj 1 atv 7-I i L Niy gTN-I TN -2 j� f 1��AA W' \ P�1� 12y�,Iq QP+ to >c-1 � J i SEPTIC SYSTEM DESIGN FLOW ESTIMATE. 3 BEDROOMS AT IID GAL/DAY/BEDROOM GAL/DAY SEPTIC TANK �MGAL/DAY x 2 DAYS GAL USE D) GALLON SEPTIC TANK so I L ABSi;R�T I ON—SYSTEI,� U5�, 2�> � Omk x ZDi U -)1 SIDE AREA: LII—Fiz-xne BOTTOM AREA: X Z a v,� SEPTIC SYSTEM SECTION -"T 1•Ib1 �: i'�tTt12�� l� W OvUl,�tt� T -- - 0 DATE ft­4­ff� 1d4� raw", i110" hI'Ii i 5- b _ GAL / SEPTIC TANK.,.. r HEALTH AGENT 1) `(`Ile installation shall eornp� Willi Title V aud Town of l tujalloard 01 Ileallh Regulations. I 2) The installer shall verify the location of utilities, sewer inverts and septic components prior to installation and setting base elevations. 3) All gravity septic piping to be 4 inch Sch ,I(1 PVC at 1/8" per foot.The lust two feet Ont of the d -box to the leaching shall be level. 4) This plan is not to be utilized for property line determination nor any other ; purpose other than the proposed system installation. 5) All septic components must meet Title V specifications. 6) Parking shall not be constructed over I I10 septic components. ' 7) "rhe property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based on (lie plan shall be deemed approval of the design flow by the owner.. 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Pilose within the proposed SAS shall be removed along Willi contaminated soil.and replaced with clean sant) per Title V specs. 10) System components to be 10 feet from water line. Sewer lines crossing the water line shall be sleeved with 4 inch SCI I 40 PVC with ends grouted if applicable. `file proposed SAS is being installed below the water service line. The line is to be sleeved as aforementioned rind maintained in place. 1 1) If a garbage grinder exists it is to be removed and is the responsibility of the owner to ensure such. 12)The installer is to take caution in excavation around the gas line if sucli exists. 13)'fiie instoller shall verily the l()Ctilit)n, witintily and elevulion ol'Iliu sewer lines exiting (lie dwellin6"prior to the installation. 14) This plan is representative only that a system call (it on a property meeting 'Title V requirements. 15 �IWSPi�'fltl�.l -wJ --3„ 14Df f k7 v _ SITE .AND SEWAGE PLAN L OCAT ION: - 17D Iir J 4WIwu —, (?_t>\4- (7 PREPARED FOR: �'0 l0U SCALE DAVID B. MASONtR DATE: DBC ENVIRONMENTAL DESIGNS EAST SANDWICH. MA (508) 833-2177 v, F�Amfo �tc 6�O j1�J ti p Ivyl �'ir,