Loading...
HomeMy WebLinkAboutEngineered Plan - 2016TOP OF FOUNDATION ELEV. 103.00- 10 FT. MINIMUM 3.00 4" CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4" PER FT. ELEV. 100_00- ELEV. LEGEND: 1/8 TO 1/2" WASHED STONE !A 6" ,. 102.0 `MAX.. OR FILTER FABRIC :VENT 6 X 90.75 WIN. NOT REQUIRED FLOW TEE z LEVELERS DEPTH HORIZ TEXTURE COLOR MOTT; :. OTHER 0-10" 0/A LOAMY SAND 10YR5/1 NO 10'.31" B LOAMY SAND 10YR6/6 31-77" C1 LOAMY SAND 10YR7/4 77-132" C2 MEDIUM SAND 2.5Y8/4 _ FLOW LINE " .TEXTURE COLOR 139.0 OTHER ' 0-10" 0/A LOAMY- SAND NO WATER ENCOUNTERED AT _� f 32` ELEV. _ 90.7 10 10-30" ;- B LOAMY SAND 10YR6/6 C.P. Q _ LOAMY SAND 10YR7/4 MIN.-' 60-120" C2 2'0" o o G .:- �: _ _ -� _._ -<: _ -:-_ o « o _ OSSEI�ATIO�� 2 ELEV._ 102.0 GAS ELEV. _ _9€I.�5�,� ,. LEVEL 88.67 6 SUMP ELEV. _ 95.50 o o . -- .� -__, _-,-- _ ---. _ __ _._ _. ___ _ ___ u 10 97.67 ELEV. = ___ :, PERCOLATION RATE < 2 MIN./INCH AT -`60 z -- INCHES BAFFLE _ • --- -- ELEV. - _ _ DISTRIaUTIO I �. r_., DEPTH. HORIZ .TEXTURE COLOR MOTT: OTHER ' 0-10" 0/A LOAMY- SAND 1OYR5/1 NO G 10-30" ;- B LOAMY SAND 10YR6/6 C.P. Q 30-60" C1 LOAMY SAND 10YR7/4 60-120" C2 MEDIUM SAND : 2.5Y8/4 REV. _ 4 t tt1 14 INGHtS iu tit wni�r< i��iw 11' X 35' X 10" TRENCH FORMATION M 5 FEET 19 INCHES ! , �,' IF MORE THAN ONE OUTLET 6 FEET 24 INCHES 1500 GALLON - 7FEET 29 INCHES (TO BE PLACED ON FIRM BASE) SOIL � �® PTION WELL N A N 8 FEET 34 INCHES SEPTIC TANK ZONE 3/4" TO 1 1/2" CLEAN INDEX ; NO WATER:ENCOUNTERED AT 120 ELEV. = 92.0 SYSTEM ,(SAS) DOUBLE WASHED STONE_ ADJUST - OF FINE & SILT -FREES S - •:.. USGS PROBABLE ER TABLE ELEV. SEVIAGE DISPOSAL SYSTEM PROFILE. OBSERVED WATER TABLE ( / / ) ELEV. - NOT TO SCALE BOTTOM OF TEST :HOLE ELEV. DESIGN CALCULATIONS'NOTES. NUMBER' OF BEDROOMS MANSHi AND MA . 3 1. ALL WpRK P. MATERIALS SHALL CONFORM TO DEP GARBAGE DISPOSAL UNIT Mi TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR TOTAL ESTIMATED FLOW UR DISPOSALOF SEWAGE. • { 110 GAL/CR./bAY X ER.) �,,6'?f�_ GAL./DAY COVERS TO SANITARY UNITS SHALL BE BROUGHT TO ,THE " Or FINISHED GRADE. - 2. ALL REQUIRED SEPTIC TANK CAPACITY H GAL: 3• ALLCOMPONENTSOF THE SANITARY SYSTEM SHALL BE CAPABLE OF ACTUAL SIZE OF SEPTIC TANTS 15# 0 GAL.. _ R OR WITHIN S011_ CLASSIFICATION: l� WITHSTANDING H 10 LOADING UNLESS ARE UNDER SIGN PERCOLATION RATE < MI I 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL: BE DE 0 -_5_ N / N. KING AREAS USED .UNDER :OR WITHIN 10 FT. OF DRIVES OR PAR EFFLUENT LOADING RATE lae�- :GAL./DAY/SIF. 4 UNITS ` LEACHING -AREA 414.3.1 SQ:, FT. . ANY I�4ASONA,RY USED TO BRING COVERS TO GRADE SHALL :•+ _r _ BE MORTARED 'IN PLACE. (1lX>, )+(47X2X10/12} - 5.:N0 DETERMINATION HAS BEEN MADE AS TO COMPLIANCr !""TH LEACHING CAPACITY (AREA X RATE) -MtPQ GAL./DAY : DEEDED OR ZONING REGULATIONS." OV',TIER / APPLICANT IS TO 474.33 X 0.74 DETERMINATION FROM APPROPRIATE AUTHORITY. RESERVE LEACHING CAPACITY MIN. GAL. -/DAY OBTAIN SUCH . f 05.00 ,SOIL �, � - --� 6. U1ILITIES SHOWN AREAPPROXIMATE ONLY, EXCAVATION: CONTRACTOR : 101.00 0 TEST 2 36.0 x [{7.5X4'3)+(55.5X2X10/12)] X 0.74 IS TO CALL DIG -SAFE . AT 1-888-344-7233 AT LEAST 2 HOURS SOIL ..�' COMMENCING WORK ON SITE. ' 0 T PRIOR . O CO . 0.0� 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS. WELL AS TEST 1 SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY:VARIATION IS TOBEBROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER D IMMEDIATELY. OX rte, tea A'" S. PARCEL IS IN FLOOD ZONE_ X VE - .,7 _ - -- - - Q9 1500 GALLON u, it SEPTIC TANK o,• f' ,N„{;'`�` ' v � �-O1r'�v viv 5`t�a A Y.. .y LOT 99 i; F 11,550 S.F. �,w o- gH .� X 105.95 • 104.58 24,5 v � E♦ i POs+roR00M5 �� a / R08!N��'�,' o RQ ED '�r / r R &u fu B +,�� 1St itL1Ay..%rrY 4 O \1 4J �'.ter, n - v 100.50 - HEALTH DEPT 'D: BOARD. -OF KALTH APPROVE klp... x 99.65 DATE AGENT EXISTING SPOT ELEVATION 00,0 EXISTING. CONTOUR ----00---- FINAL SPOT ELEVATION 00.0 FINAL CONTOUR 00 - SOIL TEST LOCATION UTILITY POLE __0_ TOWN WATER -W=� W - CATCH BASIN \®� GAS LINE G CLEAN OUT C.O. CESSPOOL C.P. Q C.• �S8�PROJ�7709-00�dw_q�7709-SAS,DWG 0 2016 SWEETSER ENGINEERING ARMO �. SETUCKET fu ?0 �f�.1�P�� �G w NpG1-E BPR LEEN i !f FOR: JOE MI g �r�? 1� LOC. _ . s�BAP. ply 203 SETUCKET ROAD 508- SOUTH `ODE OX 71MASS. 385-6900 02660 DATE MAY 19, 2016 SCALE 1 „ _ 20' REV. JOB NO, 0963_00 LOCATION MAP REV. SHEET 1 OF 1- C.• �S8�PROJ�7709-00�dw_q�7709-SAS,DWG 0 2016 SWEETSER ENGINEERING