HomeMy WebLinkAbout83-1890BSC GROUP
;uu :••a '� :::.,s r: - :;: _; _�;, _ .> . Yarmouth Conservation 349 Main Street, Unit D
�omrn+ssio West Yarmouth, MA 02673
December 11, 2013 VEC 13 2013
Tel: 508-778-8919
RE _ E t V c D 800-288-8123
Town of Yarmouth Conservation Commission G
1146 Route 28 Fax:508-778-8966
South Yarmouth, MA 02664
Attn: Kerry Muldoon, Agent www.bscgroup.com
RE: Partial As -Built Survey, Orders of Conditions SE83-1890, Water Quality
Certification X236799, Chapter 91 Permit 13321, ACOE Permit NAE-
2011-00710, Salt Pond Maintenance Dredging, West Yarmouth,
Massachusetts, BSC Job #48938.03
Dear Ms. Muldoon and Members of the Conservation Commission:
The BSC Group, Inc. is pleased to submit this partial as -built dredge survey on
behalf of our client, Timothy Grimes, for the property located at 33 Cove Road in
West Yarmouth, MA, more specifically within Salt Pond (the Site). The entrance
channel to Salt Pond was dredge last fall with spoil material placed at the Great
Island disposal site. Due to funding and the higher costs to dispose of the spoils
within the turning basin that portion of the project was postponed until fall 2015.
As such, we are submitting this partial as -built survey plan to show significant
compliance with the portion of the channel, which was previously dredged. For
more information, please refer to the attached Dredging As -Built Plans. As
required, start work notification will go out prior to the start of Phase II, the inner
turning basin.
If you have any questions or require additional information, please contact me at
(508) 778-8919.
Sincerely,
The BSC Group, Inc.
Matthew Creight , PWS Engineers
Project Manager etland Scientist Environmental
Scientists
CC: Timothy Grimes, 84 Dartmouth Street, Boston, MA, 02116 GIS Consultants
Commonwealth of Massachusetts, Water Quality Certification Program, One Winter
Street, Boston, MA 02108, Attn: Ken Chin Landscape Architects
Commonwealth of Massachusetts, Chapter 91 Waterways Program, 20 Riverside Dr., planners
Lakeville, MA 02347, Attn: David Hill
CZM, 1213 Purchase Street — 31 Floor, New Bedford, MA 02740, Attn: Robert Boeri, Surveyors
US ACOE, 696 Virginia Road, Concord, MA 01742, Attn: Richard Kristoff
P:\prj\4893802\Environmental\Permit Applications\2013-12-10 As -Built WQC Ltr.doc
;0'21 BSC GPOUP
September 19, 2012
Town of Yarmouth
Conservation Commission
1146 Route 28
South Yarmouth, MA 026644492
Yarmouth Conservation
Commission
SEP 24 Zp»
RECEIVED
RE: Start Work Notification, 33 Cove Road within Salt Pond, Yarmouth,
Massachusetts, BSC Job No. 4-8938.00
Dear Ms. Muldoon and members of the Conservation Commission,
BSC Group is pleased to submit this start work notification in regards to Mr. Timothy
Grimes' dredging project located at 33 Cove Road within Salt Pond, Yarmouth, MA. Phase I
of the project will include dredging Salt Pond to -4.0 MLW with 1 foot over -dredge by
mechanical removal. Approximately 1,700 cubic yards of material covering 15,050 square
feet are to be removed and used as coastal dune enhancement at the Great Island dredge
disposal site; no spoils will be disposed of below the high water mark. Work is proposed to
start on October 15, 2012 and be completed by November 1, 2012. Gilmore Marine Services
is the contractor for this project, and can be reached at 508-477-7880. Phase II will include
dredging the Salt Pond Mooring Basin, and is scheduled for October 15, 2013 to remove
1,158 cubic yards covering 12,760 square feet.
The following is the list of permits obtained for this project:
401 WQC Transmittal No.: X236799
Army Corps of Engineers Permit No. NAE-2011-00710
Chapter 91 Permit No. 13321
Order -of -Conditions 5E-83-1890
BSC will be on site monitoring progress throughout the project, and will notify you at the
completion of the project. Please do not hesitate to contact me at 508-778-8919 with any
inquiries you may have.
Very truly yours,
BSC GROUP, INC.
rin W. Hayes, P
roject Manager
Senior Associate
349 Main Street
(Route 28), Unit D
West Yarmouth
MA 0*3
Tel: 508-778-8919
800-288-8t23
Fax: 508-778-8966
www.bscgroup.com
Engineers
Environmental
Scientists
GIS Consultants
Landscape
Architects
Planners
Surveyors
P:\prj\4893802\_Project Control\Correspondence\Outgoing\2012-09-18 NWH Start Work Notice. dotx. docx
• Town of Yarmouth Conservation Commission
September 19, 2012
Page 2
cc: David Hill, Massachusetts Department of Environmental Protection, Southeast
Regional Office, 20 Riverside Drive, Lakeville, MA 02347
Ken Chin, Department of Environmental Protection, Division of Wetlands and
Waterways, One Winter Street, Boston, MA 02108
Town of Yarmouth, Division of Natural Resources, Waterways, 597 Forest Road
West Yarmouth, MA 02664
Timothy Grimes, 84 Dartmouth Street, Boston, MA 02116
DEPARTMENT OF THE ARMY
NEW ENGLAND DISTRICT, CORPS OF ENGINEERS
696 VIRGINIA ROAD
CONCORD, MASSACHUSETTS 01742-2751
REPLY TO
ATTENTION OF
June 8, 2011
Regulatory Division
CENAE-R-PEA
File Number: NAE-2011-00710
Timothy Grimes
84 Dartmouth Street
Boston, Massachusetts 02116
Dear Mr. Grimes:
We have reviewed your application to dredge Salt Pond to -4.0 feet at mean low water with
a 1 foot over dredge by mechanical dredging. The amount of dredge material to be removed is
approximately 2,858 cubic yards out of an approximately 27,810 square foot area. Compatible
sands will be used to enhance coastal dunes at the Great Island Dredge Disposal site. All other
material will be disposed of at an approved upland location. No materials will be used as
nourishment or placed seaward of the high tide line. This project is located in Salt Pond at
33 Cove Road, Yarmouth, Massachusetts. The work is shown on the attached plans entitled
"PLANS TO MAINTAINANCE DREDGE 2852 +/- C.Y. OF MATERIALS IN AND OVER
THE WATERS OF SALT POND (LEWIS BAY), WEST YARMOUTH, MA BARNSTABLE
COUNTY", on 5 sheets, and dated "3/18/11".
Based on the information you have provided, we have determined that the proposed
activity will have only minimal individual or cumulative environmental impacts on waters of the
United States, including wetlands. Therefore, this work is authorized as a Category 2 activity
under the attached Federal permit known as the Massachusetts General Permit (GP). This work
must be performed in accordance with the terms and conditions of the GP and also in compliance
with the following special conditions:
1. There shall be dredging or disposal from January 15 to May 15, inclusive, in
order to minimize adverse impacts to spawning winter flounder.
2. Prior to the start of work, shell fish within the dredge area shall be relocated to a
suitable habitat area outside of the dredge work.
The Corps of Engineers has consulted with the National Marine Fisheries Service
(NMFS) regarding the effects of your project on Essential Fish Habitat (EFH) as designated
under the Magnuson -Stevens Fishery Conservation and Management Act. The NMFS has not
provided EFH conservation recommendations.
You are responsible for complying with all of the GP's requirements. Please review the
attached GP carefully, in particular the GP conditions beginning on Page 5, to familiarize
yourself with its contents. You should ensure that whoever does the work fully understands the
requirements and that a copy of the permit document and this authorization letter are at the
project site throughout the time the work is underway.
-2-
Your project is located within, or may affect resources within the coastal zone. In order for
the above determination to become valid, you must obtain Federal consistency concurrence from
the Massachusetts Office of Coastal Zone Management (CZM) if the proposed work is above the
review thresholds of the Massachusetts Environmental Policy Act (MEPA). The CZM address is
provided in the attached GP.
This GP expires on January 21, 2015. Activities authorized under this GP that have
commenced (i.e., are under construction) or are under contact to commence before this GP
expires will have until January 21, 2016 to complete the activity under the terms and general
conditions of the current GP. For work within Corps jurisdiction that is not completed by
January 21, 2016, you will need to reference any reissued GP to see if your project is still
authorized under Category 1 (no application required), or Category 2 (application required). If it
is no longer authorized you must submit an application and receive written authorization before
you can continue work within our jurisdiction. Please contact us immediately if you change the
plans or construction methods for work within our jurisdiction. This office must approve any
changes before you undertake them.
This authorization requires you to complete and return the attached Work Start Notification
Form to this office at least two weeks before the anticipated starting date. You must also
complete and return the enclosed Compliance Certification Form within one month following the
completion of the authorized work and any required mitigation.
This authorization presumes that the work as described above and as shown on your plans
noted above is in waters of the U.S. Should you desire to appeal our jurisdiction, submit a
request for an approved jurisdictional determination in writing to this office.
This permit does not obviate the need to obtain other federal, state, or local authorizations
required by law, as listed on Page 2 of the GP. Performing work not specifically authorized by
this determination or failing to comply with any special conditions provided above or all the
terms and conditions of the GP may subject you to the enforcement provisions of our
regulations.
We continually strive to improve our customer service. In order for us to better serve you,
we would appreciate your completing our Customer Service Survey located at
http://per2.gM.usace.army_mil/survey
Please contact Richard Kristoff, of my staff at 978-318-8171 if you have any questions.
Sincerely,
Philip T. Feir
Colonel, Corps of Engineers
District Engineer
Attachments
-3-
Copies Furnished:
Ed Reiner, U.S. EPA, Region 1, Boston, Massachusetts, reiner.ed@epa.gov
Christopher Boelke, National Marine Fisheries Service, Gloucester, Massachusetts,
christopher.boelke@noaa.gov
Elizabeth F. Kouloheras, DEP SERO, Wetlands and Waterways, Lakeville, Massachusetts,
c/o lisa.ramos@state.ma.us
Robert Boeri, Coastal Zone Management, Boston, Massachusetts, Robert.Boeri@state.ma.us
David Flaherty, Town of Yarmouth Conservation Commission, South Yarmouth, Massachusetts
02664
Matthew Creighton, BSC Group, Inc., West Yarmouth, Massachusetts,
MCreighton@BSCGroup.com
LEWPS
BA Y
NAN17/CKET SOUNL
So. ST \ \ 362? LOCALES ONE
,
IN, \
PARCEL 47
3622 q \ \ \ PARCEL 46
\ SF Fp PA RCEL 45
\ B-'y
NoPARCEL 26 S �i
41,
MOORING PA4RCEL
B 6 BASIN
B-5 AG OA DAB
B-4 Cp / L ICEN 126 SE ¢ M
� MOORING
MOORING
CRAIG A.
FIELD in
No.38039
r
LAND
SCALE: 1 " = 60'
0 30' 60' 120'
PLAN TO MAINTAINENCE DREDGE
2858t C.Y. OF MATERIAL IN
MLW = 0.0' AND OVER THE WATERS OF
M H W = 2.8' SALT POND (LENS BAY),
HTL = 3.1' WEST YARMOUTH, MA
BARNSTABLE COUNTY
THE BSC GROUP, INC. EXISTING
28
W. YARMOUTH,TMA 02673 CONDITIONS
o/
MOORVG
PR
Q Q/-
V
PARCEL 27
�O
AT: SALT POND
IN: WEST YARMOUTH, MA
COUNTY OF: BARNSTABLE
4PPLICANT:
TIMOTHY GRIMES
33 COVE ROAD
W. YARMOUTH, MA 02673
TE: 3/18/11 SHEET 1 OF 5
A\MA) J.
CRI N
cs ci CIVIL
4 No..32112
A (V
lip, MATERIAL TO BE USED FOR DUNE NOURISHMENT
CHANNEL
410.. 15,050:ES.F.
.0 DREDGE DEPTH TO —4.0 MLW--l.250 C.Y.
\s)
r - PAY DEPTH To Ple �4
X
6. TOTAL DREDGE VOL=1.700 C.Y.
All
vir
PARCEL 47
PARCEL 46
7
c;
.4-
PARCEL 4
IV3 E
PARCEL 26
co
C\i
O'q MOORING PAR
. 4
BASIN,
4b-
B-5- AP D
Oro A A
ICENSE
B—.
126
MOORING
MOORING
L*AA-A,A MATERIAL UNSUITABLE FOR 0."'mo
OF DUNE NOURISHMENT MOORV5 --'
MOORING BASIN .01
CRAIG A. 12,760*S.F. Rp
FIELD DREDGE DEPTH TO —4.0 MLW-701 C.Y.
No.38039 PAY DEPTH TO —5.0 MLW--457 G.Y.
TOTAL DREDGE VOL=1.158 C.Y. PARCEL 27
SCALE: 1 60'
0 30' 60' 120'
PLAN TO MAINTAINENCE DREDGE AT: SALT POND
2858± C.Y. OF MATERIAL IN IN: WEST YARMOUTH, MA
MLW = 0.0' AND OVER THE WATERS OF COUNTY OF: BARNSTABLE
M H W = 2.8' SALT POND (LEWIS BAY),
H TL = 3. 1' WEST YARMOUTH, MA APPLICANT:
BARNSTABLE COUNTY TIMOTHY GRIMES
33 COVE ROAD
THE BSC GROUP, INC. PROPOSED W. YARMOUTH, MA 02673
349 ROUTE 28
W. YARMOUTH, MA 02673 CONDITIONS DATE: 3/18/11 SHEET 2 OF 5
OF 25' SETBACK v�
DAVID J. _ TO SALT MARSHCRISPIN
CIVIL. ,
No
1 l l i w� _ j ♦ 'v,
;��; ems' ♦ � `
r"�� ♦♦w
F
��✓,a �;rJ,r>'7 .. a� � d� ` w♦♦♦ _ ♦; 9/w. if
`f N�`y N/F
p� ASSESORS MAP 10 CD
PARCEL 1 qs
b 1 ARNOLD B. CHACE JR. TR. Tql
v 1100 GREAT ISLAND OG
MA 02673 'I'F
CRANE TO BE,,`
DREDGE DISPOSAL SITES, SI11ONED BEHIND
WATERWAYS LICENSE #9382 1IT CONTOUR
DEP FILE -SE 83-1086" REINFORCED
COASTAL DUNE- ONMENTAL
MATTING /
4�Q /
4, /
OF
CRAIGA. I /
FIELD N LJ----------
-------_--
No.38039--"`-'--- GREAT ISLAND ROAD ----------_..._._.— --
- ------------------------
SCALE: 1 " = 60'
0 30' 60' 120'
PLAN TO MAINTAINENCE DREDGE AT: SALT POND
2858f C.Y. OF MATERIAL IN IN: WEST YARMOUTH, MA
MLW = 0.0'
AND OVER THE WATERS OF COUNTY OF: BARNSTABLE
MHW = 2.8' SALT POND (LENS BAY),
HTL = 3.1' WEST YAROUTH, MA
BARNSTABME COUNTY APPLICANT:
TIMOTHY GRIMES
33 ROAD
THE BSC GROUP, INC. DISPOSAL W. YARMOUOTH, MA 02673
349 W. Y RMOUTOH,TMA 02673 AREA DATE: 3/18/11 SHEET 3 OF 5
ME
JETTY
EXISTING
EXISTING CHANNEL
50' WIDE LIC. #3622
........................................................
t1tt17 0SECTION AA DAVID J.
No.38039 CRISPIN
SCALE: 1 "=20' HORIZONTAL aVIL
Na. 3211;
1 "=2' VERTICAL
yAIL
p
PROPOSED DREDGE
..............................I............................... ................................................................... i. , :¢.. 0........
PROPOSED'OVERD16 '
.....................
SECTION BB
................................................. ..................
.....................Y.
i.. ..... .. ......................
�S
........................
SCALE: 1 " = 20'
0 10' 20' 40'
PLAN TO MAINTAINENCE DREDGE AT: SALT POND
2858f C.Y. OF MATERIAL IN IN: WEST YARMOUTH, MA
MLW = 0.0'
AND OVER THE WATERS OF COUNTY OF: BARNSTABLE
M H W = 2.8' SALT POND (LENS BAY),
HTL = 3.1' WEST YARMOUTH, MA APPLICANT:
BARNSTABLE COUNTY TIMOTHY GRIMES
33 COVE ROAD
THE BSC GROUP, INC. W. YARMOUTH, MA 02673
349 ROUTE 28
W. YARMOUTH, MA 02673 SECTIONS DATE: 3/18/11 SHEET 4 OF 5
CHLECK JOURNEYS END CORP
ASSESSORS MAP 14
PARCEL 27
#24 SCALLOP ROAD
N/F
IRENE BRINKMAN
ASSESSORS MAP 14
PARCEL 34
#28 QUAIL LANE
N/F
CAROLYN &
TIMOTHY GRIMES
ASSESSORS MAP 14
PARCEL 45
#33 COVE ROAD
CRAIG A.
FIELD
No.38039
w
NOTES: f
N/F
FIELDS POINT MFG. CORP
ASSESSORS MAP 14
PARCEL 33
QUAIL LANE
N/F
HELEN R. WILSON
ASSESSORS MAP 14
PARCEL 44
#31 COVE ROAD
N/F
DAVID & MARILYN MAHER
ASSESSORS MAP 14
PARCEL 26
#42 SCALLOP ROAD
NF
ROBERT 0 NEIL
ASSESSORS MAP 14
PARCEL 47
#51 COVE ROAD
N/F
FRANCIS NEYLON
ASSESSORS MAP 14
PARCEL 46
#43 COVE ROAD
N/F
FIELDS POINT MFG. CORP
ASSESSORS MAP 14
PARCEL 25
SCALLOP LANE
1. THE INFORMATION DEPICTED ON THIS PLAN WAS A RESULT OF A
HYDROGRAPHIC SURVEY PERFORMED ON MAY 25, 2010 BY THE BSC GROUP, INC.
2. THE ELEVATIONS ON THIS PLAN ARE ON THE MLW DATUM.
3. THE PIERS AND FLOATS DEPICTED ON THIS PLAN WERE COMPILED FROM PLANS
BY OTHERS.
4. SHELLFISH SURVEY SE83-1835 CONFIRMED 12-5-2010.
PLAN TO MAINTAINENCE DREDGE
2858f C.Y. OF MATERIAL IN
MLW = 0.0' AND OVER THE WATERS OF
M H W = 2.8' SALT POND (LEWIS BAY),
HTL = 3.1' WEST YARMOUTH, MA
BARNSTABLE COUNTY
THE BSC GROUP, INC. ABUTTERS/
W. YARMOUTH,TMA 02673 NOTES
AT: SALT POND
IN: WEST YARMOUTH, MA
COUNTY OF: BARNSTABLE
APPLICANT:
TIMOTHY GRIMES
33 COVE ROAD
W. YARMOUTH, MA 02673
TE: 3/18/11 SHEET 5 OF 5
I
. Commonwealth of Massachusetts
Executive Office of Energy & Environmental Affairs
Department of Environmental Protection
One Winter Street Boston, MA 02108.617-292-5500
DEVAL L PATRICK RICHARD K SULLVAN JR.
Governor Secretary
TIMOTHY P. MURRAY KENNETH ? KIMMELL
Lieutenant Governor Commirrzoner
November 21, 2011
Timothy Grimes
84 Dartmouth Street
Boston, MA 02116
Re: 401 WATER QUALITY CERTIFICATION
Application for BRP WW 08, Minor project dredging
At: Salt Pond off Lewis Bay, WEST YARMOUTH
401 WQC Transmittal Ns: X236799
Wetlands File Ns:
ACoE Application X2:
Dear Mr. Grimes:
The Department has reviewed your application for Water Quality Certification (WQC),
referenced above. In accordance with the provisions of Section 401 of the Federal Clean Water
Act as amended (33 U.S.C. §1251 et seq.), MGL c.21, §§ 26-53, and 314 CMR 9.00, the
Department has determined there is reasonable assurance the project or activity will be
conducted in a manner which will not violate applicable water quality standards (314 CMR 4.00)
and other applicable requirements of state law.
The waters of Salt Pond are designated in the Massachusetts Surface Water Quality Standards
as Class SB. Such waters are intended "as habitat for fish, other aquatic life and wildlife and for
primary and secondary contact recreation." Anti -degradation provisions of these Standards
require that "existing uses and the level of water quality necessary to protect the existing uses
shall be maintained and protected."
Background: On April 12, 1954, the Department of Public Works (DPW) issued a Waterway
License #3622 to the Fields Pond Manufacturing Corporation to construct two stone jetties and
to dredge an entrance to a boat basin in Lewis Bay at its property at Yarmouth. License 3622
authorized dredging to a width of 50 feet below mean low water (MLW) in the area between the
jetties and extending through the entrance of the boat basin.
On July 5, 1979, the then Department of Environmental Quality Engineering (DEQE) issued
License no. 577 to Klaus and Irene Brinkman to dredge a portion of Salt Pond at their property
to a depth of -3.5 feet MLW.
This information is available in alternate format. Call Michelle Waters-Ekanem, Diversity Director, at 617-292-5751. TDD# 1.866-539-7622 or 1-617-574-6868
MassDEP Website: www.mass.gov/dep
Printed on Recycled Paper
401 Water Quality Certification, Salt Pond inlet channel and embayment, Yarmouth Transmittal Ns: X236799
Page 2 of 7
On July 23, 1979, DEQE issued License no. 576 to Nino and Phyllis Siracusa to dredge a
portion of Salt Pond at their property to a depth of -3.5 feet MLW
Proposed project: This project entails conducting maintenance dredging at the channel and
Salt Pond to a depth of -5 feet MLW which included one foot overdredge allowance in the
channel and -3.5 feet MLW in Salt Pond. The dredge volume for the channel is approximately
1,700 yd3 and for Salt Pond is approximately 482 yd3.
When dredging the Salt Pond, the sediment will be removed mechanically using conventional
equipment such as a small crane mounted on a barge with a roll -off container. The dredged
material will be placed in the container for dewatering. Once the dredged material is adequately
dewatered, the container will be transported to the Great Island Dune Enhancement Disposal
Site (see Beneficial Reuse of Sediments discussion).
When dredging the channel, a crane will be positioned on a sand berm adjacent to the north
jetty and will place the dredged material in 20 cubic yard rubber tired tractor for transport either
to the Great Island Dune Enhancement Disposal site or to a licensed upland site for beneficial
reuse..
Sediment sampling data: In August 2010, six core samples (131-136) were collected within the
proposed dredge area for gradation analysis. Results of the gradation analysis showed that the
sediment within the channel is less silty than the sediment within Salt Pond.
One composite sample was formed from the three core samples (64, B5 and 66) collected in
the channel and Salt Pond for chemical analysis. Results of the chemical analysis confirmed
the presence of low levels of Chromium, and Zinc. The detected concentrations were below the
Reportable Concentration (RC) S-1 criteria of the Massachusetts Contingency Plan (MCP).
The August 2010 sampling event did not meet the Sampling and Analysis Requirements of 314
CMR 9.07(2)(b)4, which required a minimum of two samples to be "characterized physically and
chemically". The August 2010 sampling event only had one sample for physical and chemical
characterization.
In July 2011, a core sample was collected within the proposed dredge area to supplement the
August 2010 sampling event. Results of the chemical analysis detected the presence of metals
and Polynuclear Aromatic Hydrocarbons (PAHs). The detected concentrations were also below
RC-S1 criteria.
Beneficial Reuse of sediments: For the initial round of dredging, sediment from the channel will
be beneficially reused at the Great Island Dune Enhancement Disposal site where it will be
graded within the existing footprint or used as beach nourishment material under the Town of
Yarmouth's comprehensive WQC (see condition 8). If the dredged material from Salt Pond is
too silty to be reused at the Great Island Dune Enhancement Disposal site, it can be reused as
daily cover material at a licensed upland facility based on the results of the chemical
characterization (see condition 9).
Rare Species and Rare Wildlife Habitat: The site is not located within the Priority Habitats of
Rare Species, Estimated Habitats of Rare Wildlife in accordance with the Massachusetts
Natural Heritage Atlas, 13t' Edition.
401 Water Quality Certification, Salt Pond inlet channel and embayment, Yarmouth Transmittal Ns: X236799
Page 3 of 7
Public Notice: The 401 WQC application public notice was published in the Cape Cod Time on
May 5, 2011 and the Department received no comment during the 21-day public comment
period, which ended on May 26, 2011.
Therefore, based on information currently in the record, the Department grants a 401
Water Quality Certification for this project subject to the following conditions to maintain
water quality, to minimize impact on waters and wetlands, and to ensure compliance with
appropriate state law. The Department further certifies in accordance with 314 CMR 9.00
that there is reasonable assurance the project or activity will be conducted in a manner
which will not violate applicable water quality standards (314 CMR 4.00) and other
applicable requirements of state law. Finally, the Department has determined that upon
satisfying the conditions and mitigation requirements of this approval, the project
provides a level of water quality necessary to protect existing uses and accordingly finds
that the project to be implemented satisfies the Surface Water Quality Standards at 314
CMR 4.00.
1. The Contractor shall take all steps necessary to assure that the proposed activities will be
conducted in a manner that will avoid violations of the anti -degradation provisions of
Massachusetts Surface Water Quality Standards that protect all waters, including wetlands.
2. Prior to the start of work or any portion of the work there after, the Department shall be
notified of any change(s) in the proposed project or plans that may affect waters or
wetlands. The Department will determine whether the change(s) require a revision to this
Certification.
3. Dredging in accord with this Certification may begin following the 21-day appeal period and
once all other permits have been received.
4. Work in waters and wetlands shall conform to the Description of Proposed Dredging Site
and plans, figures submitted in this application to the Department, four sheets prepared by
the BSC Group, Inc., dated March 23, 2011 signed and stamped by Craig Field,
Professional Land Surveyor. The Department shall be notified if there are modifications
and or deletions of work as specified in the plans. Depending on the nature and the scope
of any change, approval by the Department may be required.
5. The Department shall be notified, attention Ken Chin 617-292-5893, one week prior to the
start of in -water work so that Department staff may inspect the work for compliance with the
terms and conditions of this Certification.
6. The Certification remains in effect for the same duration as the federal permit that requires it
or five years from the date of issuance of this Certification whichever comes first.
7. Best Management Practices (BMPs) shall be deployed to minimize turbidity. At a minimum,
bottom -weighted silt curtain shall be used to surround the dredging area or to place down
current of the dredging area at a location that would not bottom out during low tide. Silt
curtain shall be of suitable material or grade appropriate with the current velocity at the site.
Dredging shall be carried out using a closed, environmental bucket if the sediment does not
consist solely of compacted silt/clay.
401 Water Quality Certification, Salt Pond inlet'channel and embayment, Yarmouth Transmittal Ns: X236799
Page 4 of 7
8. For the initial round of dredging, if the dredged material is to be reused as beach
nourishment material under the Town of Yarmouth's Comprehensive WQC, the Department
shall be notified the beach nourishment location(s) prior commencing the placement of the
dredged material.
9. For the initial round of dredging of silty sediment within the Salt Pond, the Department shall
be notified in writing of the name and location of the upland licensed facility accepting the
dredged material for disposal or reuse as daily cover material. If the licensed facility is
located out of state, .documentation shall be provided to the Department that the dredged
material disposal/reuse has been approved by the receiving state in accordance with 314
CMR 9.07(13)(b). The dredged material shall not be transported to the facility without
concurrence of the Department.
10. A Dredged Material Tracking Form (DMTF) or Material Shipping Record (MSR) shall be
used to track the dredged material to the licensed upland facility. A fully executed copy of
the DMTF or MSR shall be provided to the Department within 30 days of final shipment to
the reused location or facility.
11. Best Management Practices (BMPs) shall be implemented during transportation of the
dredged material to the licensed receiving facility. At a minimum, when transported upon
public roadways, all dredged material shall have no free liquid as determined by the Paint
Filter Test or other suitably analogous methodology acceptable to the Department, and a
tarpaulin or other means shall be used to cover the dredged material during transport.
12. Future maintenance dredging of the channel to a depth of -5 feet MLW and Salt Pond to a
depth of -3.5 feet MLW may be conducted as necessary for the duration of this Certification,
provided that:
a. the initial project and any subsequent dredging has been conducted satisfactorily
with no violations of the terms and conditions of this Certification,
b. documentation of the grain -size distribution of the sediment to be dredged contains
less than 10 percent of particles passing the No. 200 U.S. Standard Series Testing
Sieve.
c. If condition 12b is satisfied, all the dredged material shall be reused at the Great
Island Dune Enhancement Disposal site,
d. a due -diligence evaluation to determine that no known spills of oil or other toxic
substances have occurred which could have contaminated the sediment in the
dredge area,
e. a bathymetric survey has been submitted to the Department and Mass CZM in
compliance with condition no. 14
f. the volume of future maintenance dredging does not exceed 2,182 cubic yards,
g. the Department is notified prior to commencement of maintenance dredging.
13. Disposal of any volume of dredged material at any location in tidal waters is subject to
approval by this Department and the Massachusetts Coastal Zone Management office.
14. Within 30 days of the completion of the dredging, a bathymetric survey of the channel and
Salt Pond, depicting post -dredge conditions shall be conducted. At a minimum, the survey
shall include an overlay of the dredge footprint (i.e. top of slope) with sufficient coordinates
in the Massachusetts State Plane (e.g. longitude and latitude) that clearly delineates the
401 Water Quality Certification, Salt Pond inlet channel and embayment, Yarmouth Transmittal Ns: X236799
Page 5 of 7
dredge footprint shall be sent to the Department and a copy to the Massachusetts Coastal
Zone Management office, attention: Robert Boeri.
15. In order to protect spawning, larval and juvenile development of winter flounder, no dredging
shall occur between January 15th and May 31st
16. The applicant, or its contractor, shall make every feasible effort to complete the project
within the permitted timeframe. Should the applicant, or its contractor, fail to complete the
project and wish to request an amendment to the Certification for incursion into the no -
dredge period, the written request shall be received by the Department by January 2"d. The
following information shall be included in the request:
a. project location and transmittal number,
b. the date on which dredging started,
c. the number of days and hours per day the dredge operated,
d. expected daily average production rate and the actual daily average production rate,
e. an explanation of why the project failed to remain on schedule,
f. an account of efforts made to get the project back on schedule,
g. a plan depicting the areas that remain to be dredged,
h. the number of cubic yards that remain to be dredged,
i. an accurate estimate of the number of days required to complete the project,
j. an evaluation of the impact of continued dredging on the species of concern,
k. a description of any efforts that will be made to minimize the impacts of the project
on the species of concern, and a realistic assessment of any societal/financial effects
of a denial of permission to continue dredging.
The Department will share the information with other -resource agencies and a decision to
grant or deny the amendment shall be made by January 15th. Requests for amendment
received after January 2Id will be considered at the Department's discretion.
17. No later than four weeks after issuance of the Permit, the applicant shall submit a
notification procedure outlining the reporting process to the Department for incidents,
relating to the dredging activities, impacting surrounding resource areas and habitats such
as, but not limited to, observed dead or distressed fish, or other aquatic organisms,
observed oily sheen on surface water, sediment spill, turbidity plume beyond the deployed
BMP's, and barging or equipment accident/spill. If at any time during implementation of the
project, all site related activities impacting the water shall cease until the source of the
problem is identified and adequate mitigating measures employed to the satisfaction of the
Department.
This certification does not relieve the applicant of the obligation to comply with other applicable
state or federal statutes or regulations. Any changes made to the project as described in the
previously submitted Notice of Intent, 401 Water Quality Certification application, or
supplemental documents will require further notification to the Department.
Certain persons shall have a right to request an adjudicatory hearing concerning certifications
by the Department when an application is required:
401 Water Quality Certification, Salt Pond inlet channel and embayment, Yarmouth Transmittal Ns: X236799
Page 6 of 7
a. the applicant or property owner;
b. any person aggrieved by the decision who has submitted written comments during the
public comment period;
c. any ten (10) persons of the Commonwealth pursuant to M.G.L. c.30A where a group
member has submitted written comments during the public comment period; or
d. any governmental body or private organization with a mandate to protect the
environment, which has submitted written comments during the public comment period.
Any person aggrieved, any ten (10) persons of the Commonwealth, or a governmental body or
private organization with a mandate to protect the environment may appeal without having
submitted written comments during the public comment period only when the claim is based on
new substantive issues arising from material changes to the scope or impact of the.activity and
not apparent at the time of public notice. To request an adjudicatory hearing pursuant to M.G.L.
c.30A, § 10, a Notice of Claim must be made in writing, provided that the request is made by
certified mail or hand delivery to the Department, with the appropriate filing fee specified within
310 CMR 4.10 along with a DEP Fee Transmittal Form within twenty-one (21) days from the
date of issuance of this Certificate, and addressed to:
Case Administrator
Department of Environmental Protection
One Winter Street, 2"d Floor
Boston, MA 02108.
A copy of the request shall at the same time be sent by certified mail or hand delivery to the
issuing office of the Wetlands and Waterways Program at:
Department of Environmental Protection
One Winter Street, 5t' Floor
Boston, MA-02108.
A Notice of Claim for Adjudicatory Hearing shall comply with the Department's Rules for
Adjudicatory Proceedings, 310 CMR 1.01(6), and shall contain the following information
pursuant to 314 CMR 9.10(3):
a. the 401 Certification Transmittal Number and DEP Wetlands Protection Act File Number;
b. the complete name of the applicant and address of the project;
c. the complete name, address, and fax and telephone numbers of the party filing the
request, and, if represented by counsel or other representative, the name, fax and
telephone numbers, and address of the attorney;
d. if claiming to be a party aggrieved, the specific facts that demonstrate that the party
satisfies the definition of "aggrieved person" found at 314 CMR 9.02;
e. a clear and concise statement that an adjudicatory hearing is being requested;
f. a clear and concise statement of (1) the facts which are grounds for the proceedings, (2)
the objections to this Certificate, including specifically the manner in which it is alleged to
be inconsistent with the Department's Water Quality Regulations, 314 CMR 9.00, and (3)
the relief sought through the adjudicatory hearing, including specifically the changes
desired in the final written Certification; and
g. a statement that a copy of the request has been sent by certified mail or hand delivery to
the applicant, the owner (if different from the applicant), the conservation commission of
the city or town where the. activity will occur, the Department of Environmental
401 Water Quality Certification, Salt Pond inlet channel and embayment, Yarmouth Transmittal Ne: X236799
Page 7 of 7
Management (when the certificate concerns projects in Areas of Critical Environmental
Concern), the public or private water supplier where the project is located (when the
certificate concerns projects in Outstanding Resource Waters), and any other entity with
responsibility for the resource where the project is located.
The hearing request along with a DEP Fee Transmittal Form and a valid check or money order
payable to the Commonwealth of Massachusetts in the amount of one hundred dollars ($100)
must be mailed to:
Commonwealth of Massachusetts
Department of Environmental Protection
Commonwealth Master Lockbox
P.O. Box 4062
Boston, MA 02211
The request will be dismissed if the filing fee is not paid, unless the appellant is exempt or
granted a waiver. The filing fee is not required if the appellant is a city or town (or municipal
agency), county, or district of the Commonwealth of Massachusetts, or a municipal housing
authority. The Department may waive the adj udicatory-hea ring filing fee pursuant to 310 CMR
4.06(2) for a person who shows that paying the fee will create an undue financial hardship. A
person seeking a waiver must file an affidavit setting forth the facts believed to support the claim
of undue financial hardship together with the hearing request as provided above.
Failure to comply with this certification is grounds for enforcement, including civil and criminal
penalties, under MGL c.21 §42, 314 CMR 9.00, MGL c. 21A §16, 310 CMR 5.00, or other
possible actions/penalties as authorized by the General Laws of the Commonwealth.
If you have questions about this decision, please contact Ken Chin at 617-292-5893.
Sincerely,
. Awl.
1011,
Ann Lowery
Deputy Assistant Commissioner
Bureau of Resource Protection
enclosure: Departmental Action Fee Transmittal Form
Material Shipment Record (MSR)
cc:
Karen Adams, Regulatory/Enforcement Division, U.S. Army Corps of Engineers, 696 Virginia
Road, Concord, MA 01742-2751
Robert Boeri, CZM, 251 Causeway Street, Suite 800, Boston, MA 02114
Eileen Feeney, DMF, 1213 Purchase St., 3rd floor, New Bedford, MA 02740-6694
David Hill, Liz Kouloheras, DEP SERO
Yarmouth Conservation Commission, 1146 Route 28, South Yarmouth, MA 02664
Norman Hayes, 349 Main St, Unit D, West Yarmouth, MA 02673
KC/X23 6799
Page 1 of 1
Clark, Sandi
From: Clark, Sandi
Sent: Wednesday, April 20, 2011 2:20 PM
To: Hall, Brad
Subject: FW: Question
From: Matthew Creighton[mailto:MCreighton@BSCGroup.com]
Sent: Wednesday, April 20, 2011 2:18 PM
To: Clark, Sandi
Subject: Question
Hi Sandi:
I have a question for you. Not sure if your still helping with Conservation but I received an Order of
Conditions from Brad before he left (SE 83-1890) for Tim Grimes. When I went to record it we found
out Tim's wife was the listed owner (not Tim) and we couldn't record. I was hoping you could take the
property owners for the abutters off the order and just add Carolyn F. Grimes, 84 Dartmouth Street,
Boston, MA 02116-6013 as the additional property owner. The project is dredging Salt Pond and
originally we had all abutters listed but we are only recording on the Grimes property.
I hope your doing well. Give me a call at 508-778-8919 to discuss.
Thanks your the best,
Matt
Matthew Creighton, WPrr
Environmental Scientist
BSC Group
349 Route 28, Unit D
West Yarmouth, MA 02673
(508) 778-8919
fax. • (508) 778-8966
() vjl/(�
t� 12 / //
4/20/2011
v . 1
Doc 1 Y 166 Y 4 50 05-23-2011 9--50
BARNSTABLE LAND COURT REGISTRY
Massachusetts Department of Environmental Protection
Provided by MassDEP:
of Resource Protection - Wetlands
SE-83-1890
LlBureau
WPA Form 5 — Order of Conditions
MassDEPFile #
Massachusetts Wetlands Protection Act M.G.L. c. 131, 540 eDEP Transaction #
Town of Yarmouth Wetland By -Law, Chapter 143
Yarmouth
Cityrrown
A. Genera! Information
Please note:
Yarmouth
this form has
been modified
1. From:
Conservation Commission
with added
space to
2. This issuance is for a. ®Order of Conditions b. ❑ Amended Order of Conditions
accommodate
(check one):
the Registry
of Deeds
3. To: Applicant:
Requirements
Timothy Grimes
Important:
a. First Name b. Last Name
When filling
out forms
c. Organization
on the
84 Dartmouth Street
computer;
use only the
d. Mailing Address
tab key to
Boston MA
02116-6013
move your
e. Cityfrown f. State
g. Zip Code
cursor - do
not use the
4. Property Owner (if different from applicant):
return key.
Carolyn F. Grimes
,��
— ICI
a. First Name b. Last Name
c. Organization
84 Dartmouth Street
d. Mailing Address
Boston MA
02116-6013
e. Cityrrowri f. State
g. Zip Code
5. Project Location:
33 Cove Road West Yarmouth
a. Street Address b. Cityfrown
14 45
c. Assessors Map/Plat Number d. ParceULot Number
48d38m04s
70d14m25s
Latitude and Longitude, if known:
d. Latitude
e. Longitude
Wpaform5.doc • rev. 0511912010 Page 1 of 12
C�
Massachusetts Department of Environmental Protection
Provided by MassDEP:
of Resource Protection - Wetlands
SE-83-1890
WPA Form 5 — Order of Conditions
LlBureau
MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
eDEP Transaction #
Town of Yarmouth Wetland By -Law, Chapter 143
Yarmouth
Cityfrown
G. Recording Information
Prior to commencement of work, this Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land subject to the Order. In the
case of registered land, this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions. The recording information on this page
shall be submitted to the Conservation Commission listed below.
Yarmouth
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
To:
Yarmouth
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
33 Cove Road, West Yarmouth, MA
Project Location
Has been recorded at the Registry of Deeds of:
Barnstable
County
for: Carolyn F. Grimes
Property Owner
SE-83-1890
MassDEP File Number
Book
and has been noted in the chain of title of the affected property in:
Book
Page
In accordance with the Order of Conditions issued on:
March 9, 2011
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
Page -
If registered land, the document number Identifying this transaction is:
Doc = 1 s 166, P 450 05-23-2011 9 = 50
Document Number BARNSTABLEI $ T R Y
Signature of Applicant
wpeform5.doc • rev. 05/1912010
Page 12 of 12
P
�c �-�7467
Massachusetts uepartirrce,,6 _. _.. _ __ _ Alon
Bureau of Resource Protection - Wetlands
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
A. General Information
Please note: Yarmouth
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
City/Town
una iunn nab I. rl ul I I.
been modified Conservation Commission
with added 2. This issuance is for
space to (check one): a. ®Order of Conditions b. ❑ Amended Order of Conditions
accommodate
the Registry
of Deeds 3. To: Applicant:
Requirements
Timothy Grimes
a. First Name b. Last Name
Important:
When filling
out forms
c. Organization
on the
84 Dartmouth Street
computer,
use only the
d. Mailing Address
tab key to
Boston
move your
e. Cityrrown
cursor - do
not use the
4. Property Owner (if different from applicant):
return key.
See attached sheet for multible owners
4:1
a. First Name
new
c, Organization
d. Mailing Address
e. Cityrrown
5. Project Location:
33 Cove Road West Yarmouth
a. Street Address b. City/Town
14 45
c. Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known: 48d38m04s
d. Latitude
MA
f. State
b. Last Name
f. State
g. Zip Code
70d14m25s
e. Longitude
wpaform5.doc • rev. 05/19/2010
Page 1 of 12
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
A. General Information (cont.)
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
Cityrrown
6. Property recorded at the Registry of Deeds for (attach additional information if more than
one parcel):
Barnstable LCC 123681, LCP 14426-H, Lot 67
8.
a. County
b. Certificate Number (if registered land)
c. Book
d. Page
November 12, 2010
March 3, 2011 March 9, 2011
Dates:
a. Date Notice of Intent Filed
b. Date Public Hearing Closed c. Date of Issuance
Final Approved Plans and Other Documents
(attach additional plan or document references
as needed):
Plan to Accompany a Notice of Intent for Timothy Grimes
a. Plan Title
BSC Group
Craig Field
b. Prepared By
c. Signed and Stamped by
December 5, 2010
1 inch = 20 feet
d. Final Revision Date
e. Scale
f. Additional Plan or Document Title
B. Findings
1. Findings pursuant to the Massachusetts Wetlands Protection Act:
g. Date
Following the review of the above -referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act (the Act). Check all that apply:
a. ❑
Public Water Supply
b. ® Land Containing Shellfish c.
❑ Prevention of
Pollution
d. ❑
Private Water Supply
e. ❑ Fisheries f.
® Protection of
Wildlife Habitat
g. ❑
Groundwater Supply
h. ® Storm Damage Prevention I.
® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
wpaform5.doc • rev. 05/19/2010
Page 2 of 12
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
B. Findings (cont.)
Denied because:
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
Cityrrown
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the
work, or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final Order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CM 10.05(6)(c).
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project
disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a. linear feet
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
a. ❑
Bank
5. ❑
Bordering
Vegetated Wetland
s. ❑
Land Under
Waterbodies and
Waterways
7. ❑ Bordering Land
Subject to Flooding
Cubic Feet Flood Storage
a. ❑ Isolated Land
Subject to Flooding
Cubic Feet Flood Storage
9. ❑ Riverfront Area
Sq ft within 100 ft
Sq ft between 100-
200 ft
a. linear feet b. linear feet c. linear feet d. linear feet
a. ayuaav �cca .�. aya. .v wva ,,. ,,y.. ......... ................._.
a. ayua�c avca v..�y.aa.v .a.c.a ... ,,y.. .....,... ,....y.............
e. c/y dredged f. c/y dredged
a. square feet b. square feet c. square feet d. square feet
e. cubic feet f. cubic feet g. cubic feet h. cubic feet
a. square feet b. square feet
a.. a.uun. 1cca
u. a.-- ..................
........... ......
b. total sq. feet
n tnfal en foot
d. square feet a one fora foot
f. square feet
r cm mra foot
h. square feet i ern inro foot
j. square feet
n cno inro foot
wpaform5.doc • rev 05/19/2010
Page 3 of 12
4
Massachusetts Department of Environmental Protection
LLIBureau of Resource Protection - Wetlands
I WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
B. Findings (cont.)
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
City/Town
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
Proposed
Permitted Proposed Permitted
Alteration
Alteration Replacement Replacement
1o.
❑
Designated Port
Indicate size under Land Under the Ocean, below
Areas
11.
®
Land Under the
27,526
27,526
Ocean
a. square feet
b. square feet
2470
2470
c. c/y dredged
d. c/y dredged
®
Barrier Beaches
Indicate size under Coastal Beaches and/or Coastal Dunes
12.
below
®
Coastal Beaches
5000
5000 1000 cu yd 1000 cu yd
13.
a. square feet
b. square feet c. nourishment d. nourishment
®
Coastal Dunes
9154
9154 500 cu yd 500 cu yd
14.
a. square feet
b. square feet c. nourishment d. nourishment
15.
❑
Coastal Banks
a. linear feet
b. linear feet
16.
❑
Rocky Intertidal
Shores
a. square feet
b. square feet
17.
❑
Salt Marshes
a. square feet
b. square feet c. square feet d. square feet
18.
❑
Land Under Salt
Ponds
a. square feet
b. square feet
c. c/y dredged
d. c/y dredged
19.
®
Land Containing
27,526
27,526
Shellfish
a. square feet
b. square feet c. square feet d. square feet
20.
❑
Fish Runs
Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean,
and/or inland Land Under Waterbodies and
Waterways, above
21. ® Land Subject to
Coastal Storm
Flowage
d. lily uluuycu U. uy %At a Yc
41,680 41,680
a. square feet b. square feet
wpaform5.doc • rev. 05/19/2010
Page 4 of 12
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
B. Findings (cont.)
" #22. If the 22
project is for
the purpose of
restoring or
enhancing a
wetland
resource area 23•
in addition to
the square
footage that
has been C. General Conditions Under Massachusetts Wetlands Protection Act
entered in
Section B.5.c
(BVW) or The following conditions are only applicable to Approved projects.
B.17.c (Salt
Marsh) above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other
please enter
the additional regulatory measures, shall be deemed cause to revoke or modify this Order.
g y
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
City/Town
❑ Restoration/Enhancement *:
a. square feet of BVW
❑ Stream Crossing(s):
a. number of new stream crossings
b. square feet of salt marsh
b. number of replacement stream crossings
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this Order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order.
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have
been completed.
wpaform5.doc • rev. 05/19/2010 Page 5 of 12
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
9. No work shall be undertaken until the Order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located, within
the chain of title of the affected property. In the case of recorded land, the Final Order shall
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final Order
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order, which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP"]
"File Number SE-83-1890 "
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance (WPA Form 8A) to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition #13 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
wpaform5.doc • rev. 05119/2010 Page 6 of 12
Massachusetts Department of Environmental Protection
LlBureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means. At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated
sediments as needed. The applicant shall immediately control any erosion problems that
occur at the site and shall also immediately notify the Conservation Commission, which
reserves the right to require additional erosion and/or damage prevention controls it may
deem necessary. Sedimentation barriers shall serve as the limit of work unless another
limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order (the "Project') is (1) ❑ is not (2) ® subject to the
Massachusetts Stormwater Standards. If the work is subject to the Stormwater
Standards, then the project is subject to the following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post -construction stormwater BMPs
unless and until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii. as -built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
iv. all post -construction stormwater BMPs are installed in accordance with the plans
(including all planting plans) approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post -construction BMPs is suitably established to
withstand erosion.
wpaform5.doc • rev. 05/19/2010 Page 7 of 12
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
c) The landowner is responsible for BMP maintenance until the issuing authority is
notified that another party has legally assumed responsibility for BMP maintenance. Prior
to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the
responsible party (defined in General Condition 18(e)) shall execute and submit to the
issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement)
for the Stormwater BMPs identifying the party responsible for implementing the stormwater
BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the
O&M Plan is complete and will be implemented upon receipt of the Certificate of
Compliance, and ii.) the future responsible parties shall be notified in writing of their
ongoing legal responsibility to operate and maintain the stormwater management BMPs
and implement the Stormwater Pollution Prevention Plan.
d) Post -construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi -Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements of Conditions 18(f) through 18(k) with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f) through
18(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate
of Compliance. In the case of stormwater BMPs that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
wpaform5.doc - rev. 05/19/2010 Page 8 of 12
'L Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
Cityrrown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three (3) consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission') upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the O&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits) shall not be altered without the prior written
approval of the issuing authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text
document):
wpaform5.doc • rev. 0511912010 Page 9 of 12
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
City/Town
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The Yarmouth hereby finds (check one that applies):
Conservation Commission
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
1. Municipal Ordinance or Bylaw 2. Citation
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of Conditions is issued.
b. ® that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
Yarmouth Wetland By -Law Chapter 143
1. Municipal Ordinance or Bylaw 2. Citation
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need
more space for additional conditions, attach a text document):
See attached text page(s)
wpaform5.doc • rev. 05/19/2010 Page 10 of 12
WPA FORM 5-ORDER OF CONDITIONS
SPECIAL CONDITIONS -PAGE 10A OF 12
SE-83-1890, Timothy Grimes,
33 Cove Road, West Yarmouth, MA
1. The applicant shall be responsible for having a copy of the "Orders of
Conditions" on the job site at all times. Failure to do so may result in the
revocation of these "Orders", a fine or both.
2. The Conservation Commission, it's agents or assigns, shall have the express
right of entry upon the job site at all reasonable times for the purposes of
establishing "compliance" with the conditions stated herein.
3. Upon completion of the project, a "Certificate of Compliance" shall be
requested in writing. This "Order of Conditions" shall be considered
incomplete until the "Certificate of Compliance" is issued and recorded at the
Registry of Deeds.
4. Any plan changes whatsoever must be brought to the attention of the
Conservation Administrator prior to implementation of such change. Failure
to do so may result in the revocation of these "Orders, a fine or both.
5. A pre -construction review shall be arranged by the contractor with the
Conservation Administrator. This review shall occur prior to any work.
6. Applicants are reminded that these "Orders" are only valid for 3 years from
their date of issue, unless otherwise specifically noted within the "Orders".
Extension Permit requests must be applied for at least 30 calendar days prior
to the expiration of the original "Orders". Failure to do so will result in a
new "Notice of Intent" filing.
Continued........ .
SPECIAL CONDITIONS CONTINUED
PAGE 10B OF 12
SE 83-1890, Timothy Grimes
33 Cove Road, West Yarmouth, MA
7. Any sand used for beach nourishment shall be of compatible grain size.
8. Any excess material that is excavated from the job site shall be disposed
of at a location approved by the Conservation Administrator.
9. All imported fill shall be clean and not contain any foreign debris such
as cement, bituminous concrete, rubber, metal, trash, bolders, etc.
Bolders will be allowed in specific instances if part of the project design.
10. A "work limit" line shall be established with haybales, silt fence or both.
The Conservation Administrator shall make this final determination of
which material shall be provided and the extent of such material.
11. All shellfish within the footprint of the proposed dredge area shall be removed
under the direction of the Yarmouth Natural Resources Division, at the
applicant's expense.
Massachusetts Department of Environmental Protection
Provided by MassDEP:
Bureau of Resource Protection - Wetlands
S'e-�r 3 — ! 8 t o
WPA Form 5 — Order of Conditions
LI
MassDEP File #
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
eDEP Transaction #
Town of Yarmouth Wetland By -Law, Chapter 143
Yarmouth
CityfTown
E. Signatures
This Order is valid for three years, unless otherwise specified as a specialG��iit
9�10
condition pursuant to General Conditions #4, from the date of issuance.
1. Date of Issu nce
Please indicate the number of members who will sign this form.
CQ
This Order must be signed by a majority of the Conservation Commission.
2. Number of Signers
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Sigl
U Uy rldl,U UUIIvUl y U1I
Date
F. Appeals
Wby certified mail, return receipt
requested, on
jq
Date
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the
land subject to this Order, or any ten residents of the city or town in which such land is located,
are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a
Superseding Order of Conditions. The request must be made by certified mail or hand delivery
to the Department, with the appropriate filing fee and a completed Request of Departmental
Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from
the date of issuance of this Order. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is
not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal
will be required to demonstrate prior participation in the review of this project. Previous participation
in the permit proceeding means the submission of written information to the Conservation
Commission prior to the close of the public hearing, requesting a Superseding Order, or
providing written information to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does not contribute to the protection of the interests identified in
the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the
wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal
ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the
Department has no appellate jurisdiction.
wpaform5.doc • rev. 05/19/2010 Page 11 of 12
Massachusetts Department of Environmental Protection
LlBureau of Resource Protection - Wetlands
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
G. Recording Information
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
Cityrrown
Prior to commencement of work, this Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land subject to the Order. In the
case of registered land, this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions. The recording information on this page
shall be submitted to the Conservation Commission listed below.
Yarmouth
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
To:
Yarmouth
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
33 Cove Road, West Yarmouth, MA SE-83-1890
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
Barnstable
County Book Page
for: Timothy Grimes
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
March 9, 2011
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.doc - rev. 05/19/2010 Page 12 of 12
OWNERSHIP INFORMATION
Timothy Grimes
84 Dartmouth Street
Boston, MA 02116
Bob O'Neil
6 Andover Country Club Lane
Andover, MA 01810
David Maher
900 Capital Park Avenue #202
Salt Lake City, UT 84103
Great Island Homeowners Association
P.O. Box 895
West Yarmouth, MA 02673
I
Massachusetts Department of Environmental Protection
LlBureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
Cityrrown
A. General Information
Please note: Yarmouth
this form has 1. From: been modified Conservation Commission
with added 2. This issuance is for
space to a. ®Order of Conditions b. ❑ Amended Order of Conditions
accommodate (check one):
the Registry
of Deeds 3. To: Applicant:
Requirements
Timothy
a. First Name
Important:
When filling
out forms
c. Organization
on the
84 Dartmouth Street
computer,
use only the
d. Mailing Address
tab key to
Boston
move your
e. City/Town
cursor - do
not use the 4. Property Owner (if different from applicant):
return key.
See attached sheet for multible owners
Q
a. First Name
c. Organization
d. Mailing Address
e. City/Town
5. Project Location:
33 Cove Road
a. Street Address
14
c. Assessors Map/Plat Number
Latitude and Longitude, if known:
Grimes
b. Last Name
MA
f. State
b. Last Name
f. State g. Zip Code
West Yarmouth
b. Cityrrown
45
d. Parcel/Lot Number
48d38m04s
d. Latitude
70d 14m25s
e. Longitude
wpaform5.doc • rev. 05/19/2010
Page 1 of 12
Massachusetts Department of Environmental Protection
L1Bureau of Resource Protection - Wetlands
1 WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By -Law, Chapter 143
Provided by MassDEP:
SE-83-1890
MassDEP File #
eDEP Transaction #
Yarmouth
Cityrrown
A. General Information (cont.)
6. Property recorded at the Registry of Deeds for (attach additional information if more than
one parcel):
Barnstable
LCC 123681, LCP 14426-H, Lot 67
a. County
b. Certificate Number (if registered land)
c. Book
d. Page
November 12, 2010
March 3, 2011 March 9, 2011
7. Dates: a. Date Notice of Intent Filed
b. Date Public Hearing Closed c. Date of Issuance
8. Final Approved Plans and Other Documents (attach additional plan or document references
as needed):
Plan to Accompany a Notice of Intent for Timothy Grimes
a. Plan Title
BSC Group
Craig Field
b. Prepared By
c. Signed and Stamped by
December 5, 2010
1 inch = 20 feet
d. Final Revision Date
e. Scale
f. Additional Plan or Document Title
g. Date
B. Findings
1. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above -referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act (the Act). Check all that apply:
a. ❑ Public Water Supply b. ® Land Containing Shellfish c. ❑ Prevention of
Pollution
d. ❑ Private Water Supply e. ❑ Fisheries f. ® Protection of
Wildlife Habitat
g. ❑ Groundwater Supply h. ® Storm Damage Prevention I. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
wpaform5.doc • rev. 05/19/2010 Page 2 of 12