Loading...
HomeMy WebLinkAbout83-1908 - Buffer Zone Restoration PlanNOTES: 1: SEE PLAN BOOK 197, PAGE 91, LOT 13 2: ELEVATIONS REFER TO AN ASSUMED DATUM. THE WATER SURFACE OF PERCH POND WAS ASSIGNED AN ELEVATION OF 19. £xlspNc 04VLLING £L S36 0 r FLOOR Pn 0 4)o goo on 4 t; x r A��ble RE -SUPPORT WALKWA Exrsnti,G PECK FOR POST -SUPPORTED it•g LANDINGS W/ POST -SUPPORTED STEPS r ^ W — 30 \ Tqp OF SIOp - k32 �3-s - ... �'/ STOh'£ SLOPEVv,.,�C/ . i STEP_ ao�9 Q WAC�OSfOE - AREA TO BE LEFT --y ., .,,\;. PGRASSED\ SAF L 7`5 F7 NrONE ONLY TO REGROW EXISTING T� F : . D S< SHRUB COVER n,Y .Za^SiE�^tom Zip' i 80p i J' EW1 OF ?2.t • .. AREA TO BE PLANTED AS PER PLAN NOTES rmT PAL, OI B..x 1E 0 r No �1Xoo?rMQ WE . 4l N R0. AO P6A !]4QE IIS NAolm. us r siod rar ix�os YM'IIO PM r,r wFs ui � ./ rr w sw w SEC77ON PROFILE STAIR DETAILS NO SCALE VTSTAIR AND LANDING NOTES /E 1. THE PROPOSED STAIRWAYS AND LANDINGS SHALL BE CONSTRUCTED OF STANDARD DIMENSIONED LUMBER AS INDICATED IN GENERAL ON THE TYPICALDETAIL THE FRAME TMER STOCK SHALL BE OF A PRESSURE TREATEE (ACQ OR APPROVED EQUAL) CONSTRUCTION GRADE FIR OR YELLOW PINE. SUBSTL'TUTION OF COMPOSITE. MATERIALS FOR ANY TIMBER COMPONENTS IS SUBJECT TO APPROVAL BY THE OWNER AND ENGINEER 2. HARDWARE SHALL BE STEEL, AOT -DIP GALVANIZED. ALL BOLTS SHALL BE THRU-BOLTS WITH NUTS AND WASHERS. USE OF LAG BOLTS SHALL BE UPON OWNERS' ENGINEER APPROVAL 3. HANDRAIL MAY BE OF A SOFTER WOOD OR COMPOSITE VARIETY SUBJECT TO OWNERS APPROVAL 4. MATERIAL DELIVERY, REFUSE AND DEBRIS COLLECTION, STORAGE AND PICKUP SHALL FROM THE UPPER BANK UTILIZING AS MUCH AS POSSIBLE THE COMPLETED PORTIONS OF THE STAIRWAY. 5. TO THE E'EGREE POSSIBLE FABRICATE STAIR FRAME, TREAD AND RAIL COMPONENTS AWAY FROM THE SLOPED AREA. 6. OWING TO MINOR TOPOGRAPHIC VARIATIONS THE PROPOSED STAIRWAY ELEVATION LAYOUT MAY BE SUBJECT TO ADJUSTMENT. THE STAIRWAY STRINGERS MAY BE BEST FITTED TO THE SLOPE WHERE NECESSARY IN GE :TERM, ACCORDANCE WITH THE PLAN. 7. EACH D & Y TETE SITE SHALL 6E CLEANED OF DEBRIS SUCH AS DISCARDED WOOD MATERIAL. THE REFUSE SHALL BE PLACED INA CLOSED BTN OR DUMPSTER AT THE SITE OUT OF THE BUFFER ZONE. THIS REQLIREMIENT SHALL Bii: SUBJECT TO REGULAR INSPECTION. S. POST SUPPORT INSTALLATION SHALL BE ACCOMPLISHED BY SUITABLE POST HOLE CORER, COMPACTED IN PLACE, OF A MINIMUM OF 4 FT. DEPTH AS MEASUR?D FROM ANY POINT ON THE SLOPE, POST BACKFILL SHALL BE HAND TOOL COMPACTED IN 4 INCH LIFTS SUBJECT TO INSPECTION FOR PROPER FIXITY. EXCESS SOIL SHALL BE REMOVED. 9. ANY ARE4 DISTURBED BY CONSTRUCTION FOOT TRAFFIC OR OTHERWISED OBSERVED SHALL RECEIVE A DENSE OVER -SEEDING WITH A NATIVE FESCUE GRASS SFED MIX AND WARM SEASON GRASS SEED AT RESPECTIVE SUITABLE TIMES OT THE SEASON. SEI? RESTORATION NOTES. Ae � H �OF t -'EW2 '00� - Q � 30 r^/c FESCUE SEED W/ EROSION MIX EROSION CONTROL SEED Mlx (SEE NOTES) - PLAN/ yy� fl PROPOSED DRY-LAD FIELDSTONE WALL r ,.s (1 �7^tz\" 10 5 0 10----ZO--- HEIGHT 1 inch 10ft 2cvJf. �i ! 11 �! - _ ..•...- -_� ..^ mo Q /w/- 1 u lam,• rr/'��' �', -� "`` `� ,, c� 2 •,.•• w a � r 0 5 10 15 20 25 30 35 PRG'FILE A -A - 1N- - 4r: FREEHLING.DWG f 7 LOCUS I KEY MAP NO SCALE I� EXIT YARMOUTH, MA RESTORATION NOTES • GENE M__DESCRIP1 0N-- ♦ RESTORATION IN THE AREA SHOWN ON ME PLAN SHALL BE PLANTED AS FOLLOWS. ♦ All VINYL MESH SHALL BE REMOVED IMMEDIATELY PRIOR TO COMMENCING THE RESTORATION WORK ♦ THE SPECIFIC PLANT SPACING FOR SHRUBS SHALL BE CONSISTENT WITH THE SCALED PLAN APPROX. 4 FT. O.C. AND IN ACCORDANCE. WITH NORMAL NURSERYMENS' PRACTICE TO ACHIEVE AN INITIAL SUITABLE DENSITY OWING TO THE PROSPECT OF PROPER GROWTH ALLOWING FOR PLAINTS FILLING IN. GROUPINGS OF SUCH SUITABLE NATIVE SHRUBS AS ARROWOOD VIBURNUM, SWEET PEPPERBUSH, NORTHERN BAYBERRY, HIGHBUSH BLUEBERRY, ETC. ARE REQUIRED. ♦ THE WEST SIDE OF THE STAIRS SHALL BE LEFT TO RECOVER BY REGROWTH OF EXISTING SHRUB ROOT SYSTEMS AND 3E LEFT UNDISTURBED. ♦ SHRUB SIZE SHALL BE NO LESS THAN 3 GALLON. ♦ SHRUB PLANTING HOLES SHALL BE PRO?ERLY PREPARED IN ACCORDANCE WITH STANDARD LANDSCAPE PRACTICE. ♦ PROVIDE WATER AT REGULAR INTERVALS TO ALL PLANTINGS. DEEP WATERING IS RECOMMENDED FOR THE FIRST 4 WEEKS, AND APPROX. I- OF f ITER PER WEEK_DTTRING THF FIRST GROWP,NG SEASON. Z • 1 A SPECIFIC SEED MLX: -"7EW ENGLAND EROSION CONTRO IRESTO AR TION �•/MIX FOR DETENTION BASIS AND MOIST SITES" SHALL BE FULLY AND AGGRESIVELY ESTABLISHED IN ALL DISTURBED AREAS BELOW THE PROPOSED FIELD STONE BUTTRESS WALLAND WITHIN ALL AREAS FOR NATURAL REGROWTH AND PROPOSED SHRUBS. ♦ A COOL SEASON, NATIVE GRASS SEED MIX, PREDOMINANTLY NATIVE FESCUES MAY BE MIXED IN DISTURBED AREAS ABOVE THE LOWER BANK TOPSOIL MAY BE AMENDED TO THE DEGREE TO ENRICH THE UPPER 6INCHES AT GROUND SURFACE TO FOSTER IM PROWD GROUND COVER ♦ ENGLISH IVY MAY BE CONTROLLED TO', HE DEGREE NECESSARY. ♦ REFER TO THE ORDER OF CONDITIONS FOR ADDITIONAL WORK REQUIREMENTS. BUFFER ZONE RESTORATION PLAN SHOWING PROPOSED POND ACCESS STAIRS AT 21 RIDGEWOOD DRIVE YARMOUTHPORT, MA PREPARED FCR JOSEPH FREEHLING JANUARY 3, 2012 SCALE - AS NOTED PREPARED BY CAPE COD ENGINEERING, INC. M .• ROBERT M. PERRY, P.E. 3� a P.O. BOX 1517 EAST DENNIS, MA 02641 505-385-1445 41