HomeMy WebLinkAbout83-1916 - Beach Nourishmentr-4
Beach Beach
i 1
Max Side slope
1
Proposed Note: Should Rip—Rap Placement
Channel be necessary Min Stone size
6"-12" or SHA Class I
SECTION B -B
NTS
/
EX`
0,14
\ G�6� /
3 � �
Lawn Area /
\ LOT 1
7
1
LOT 23A
�k
s ; `4 s
� o
o
�
a
BEACH ARE GGF /
ti I 011
Gpt3`'lll� /
\ I 0 \ 4
a ,\ 2 3
N `l
CD
1 I
7
I I 1 1 v
i i j1
1
LEWIS BAY'
t I
I z
1 j i
r j
�1
ti t a f
I`
1
1
1
I
1
LOT 23B
g�ppg /
pF Q/
�(�p�'6•
q1
CoaS \ �Oeae)n
G
i
a " � .., �i fiat• �`4t�
OC r
SGVx M44ASv%
x
eoo , �h
A Q\Q
NICE
LOT 13 P1,13PS &13P6
PLAN VIEW
BEACH AREA Scale
Area of Exeovoflon
1 "=30'
SECTION A -A
H:1 `20'
V:1 "=10'
GENERAL NOTES
1. ELEVATIONS REFER T NGVD OF`192D
2. YORK LIMIT SHALL BE STAKED PRIOR TO CONSTRUCTION
3. NO CONSTRUCTION ACTIVITY OR CONSTRUCTION EQUIPMENT
SHALL ENCROACH ON THE SALT MARSH OR BE SEWARD OF THE
WORK LIM1T LINES AS DEPICTED ON THE PLANS.
4. ALL UNUSABLE DREDGED MATERIAL SHALL BE DISPOSED OF
IN AN APPROPRIATE LOCATION. CLEAN SAND DREDGE MATERIAL
MAY BE PLACED ON THE BEACH ABOVE THE EHW.I
5. ALL SAND FILL USED FOR BEACH NOURISHMENT SHALL BE
CLEAN SAND, CONSISTENT COLOR, AND GRAIN SIZE TO THE
EXISTING SAND ON Tip£ BEACH.
G. ALL SAND FILL PLACED SHALLBE FIRMLY COMPACTED
DURING AND AFTER PLACEMENT.
7. SNOW FENCING WILL BE PLACED ON THE BEACH FOR STABILIZATION
AFTER CONSTRUCTION'. APPLICANT SHALL CONSUKLT WITH YARMOUTH
CONSERVATION OFFICER REGARDING PLACEWTIT`tOMION.
a. ALL WORK SHALL COMPLY WITH MASSDEP BEACH NOURISHMENT
GUIDE AND BEST MANAGEMENT PRACTICES. (MARCH 20070
9. BASEMAP PREPARED BYSCHOFIELDD BROTHERS — ENTITLED
"PLAN OF PROPOSED OR€DGENING & FILLING" DATED 1994.
10. CONTRACTOR SHALL MEET WITH YARMOUTH CONSERVATION AGENT
PRIOR TO CONSTRUCTION TO REVIEW MEANS AND METHODS OF WORK.
EROSION & SEDIMENT CONTROL NOTES
1 ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE DONE IN ACCORDANCE WITH THE MASSACHUSETTS
ENVIRONMENTAL PROTECTION STANDARDS.
2. THOSE AREAS UNDERGOING ACTUAL CONSTRUCTION WILL BE LEFT IN AN UNTREATED OR UNVEGETATED
CONDITION FOR A WNIMUM TIME. AREAS SHALL BE PERMANENTLY COMPACTED & STABILIZED WITHIN
15 DAYS OF FINAL GRADING AND TEMPORARILY STABILIZED .
3. SEDIMENT BARRIERS (SNOW FENCE, MAY BARRIERS, ETC.) SHOULD BE INSTALLED PRIOR TO ANY SOIL DISTURBANCE
OF THE CONTRIBUTING DRAINAGE AREA ABOVE THEM. MULCH NETTING SHALL BE USED TO ANCHOR
MULCH IN ALL AREAS WITH SLOPES GREATER THAN 15%. AFTER OCTOBER 1ST, THE SAME APPLIES
FOR ALL SLOPES GREATER THAN 8%,
4, INSTALL SEDIMENT BARRIERS AT TOE OF SLOPE TO FILTER SILT FROM RUNOFF. SEE DETAILS FOR PROPER
INSTALLATION. SEDIMENT BARRIERS WILL REMAIN IN PLACE PER NOTE J5.
5. ALL EROSION CONTROL STRUCTURES WILL BE INSPECTED, REPLACED AND/OR REPAIRED EVERY 7 DAYS AND
IMMEDIATELY FOLLOWING ANY SIGNIFICANT RAINFALL OF SNOW MELT OR WHEN NO LONGER SERVICEABLE DUE
TO SEDIMENT ACCUMULATION OR DECOMPOSURE. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH
STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE HALF THE HEIGHT OF
THE BARRIER. SEDIMENT CONTROL DEVICES SHALL REMAIN IN PLACE AND BE MAINTAINED BY THE CONTRACTOR
UNTIL AREAS UPSLOPE APE STABILIZED BY TURF.
B. NO SLOPES, EITHER PERMANENT OR TEMPORARY, SHALL BE STEEPER THAN TWO TO ONE (2 TOI).
7. DURING THE CONSTRUCTION PHASE, INTERCEPTED SEDIMENT WILL BE RETURNED TO THE SITE AND REGRADED
ONTO OPEN AREAS.
&. WINTER CONSTRUCTION PERIOD: NOVEMBER 1 THROUGH APRIL 15.
9. EXPOSED AREA SHOULD BE LIMITED SO THAT IT CAN BE WORKED IN ONE DAY PRIOR TO ANY SNOW EVENT.
10. CONTINUATION OF EARTHWORK OPERATION ON ADDITIONAL AREAS SHALL NOT BEGIN UNTIL THE EXPOSED SOIL
SURFACE ON THE AREA BEING WORKED HAS BEEN STABILIZED SUCH THAT NO LARGER AREA OF THE SITE IS
WITHOUT EROSION CONTROL PROTECTION AS LISTED IN ITEM ABOVE,
RONALD
T1BEM
No. 94775
TITLE:
BEACH NOURISHMENT
[SCALE: AS NOTE)[DATE:
12/12/11
SHEET No:
DRAWN BY: PROJECT No:
SOG 2011-223
CHECKED BY: RT CAD I.D. #: i
CroweII0.dwq OF 1 I
PROFESSIO AL ENGINEER
MASSACHUSETTS LICENSE No. 34773 CONSTRUCTION CHECK DATE
; 1
s
1
t
1
{
1 I
I
I`
1
1
1
I
1
LOT 23B
g�ppg /
pF Q/
�(�p�'6•
q1
CoaS \ �Oeae)n
G
i
a " � .., �i fiat• �`4t�
OC r
SGVx M44ASv%
x
eoo , �h
A Q\Q
NICE
LOT 13 P1,13PS &13P6
PLAN VIEW
BEACH AREA Scale
Area of Exeovoflon
1 "=30'
SECTION A -A
H:1 `20'
V:1 "=10'
GENERAL NOTES
1. ELEVATIONS REFER T NGVD OF`192D
2. YORK LIMIT SHALL BE STAKED PRIOR TO CONSTRUCTION
3. NO CONSTRUCTION ACTIVITY OR CONSTRUCTION EQUIPMENT
SHALL ENCROACH ON THE SALT MARSH OR BE SEWARD OF THE
WORK LIM1T LINES AS DEPICTED ON THE PLANS.
4. ALL UNUSABLE DREDGED MATERIAL SHALL BE DISPOSED OF
IN AN APPROPRIATE LOCATION. CLEAN SAND DREDGE MATERIAL
MAY BE PLACED ON THE BEACH ABOVE THE EHW.I
5. ALL SAND FILL USED FOR BEACH NOURISHMENT SHALL BE
CLEAN SAND, CONSISTENT COLOR, AND GRAIN SIZE TO THE
EXISTING SAND ON Tip£ BEACH.
G. ALL SAND FILL PLACED SHALLBE FIRMLY COMPACTED
DURING AND AFTER PLACEMENT.
7. SNOW FENCING WILL BE PLACED ON THE BEACH FOR STABILIZATION
AFTER CONSTRUCTION'. APPLICANT SHALL CONSUKLT WITH YARMOUTH
CONSERVATION OFFICER REGARDING PLACEWTIT`tOMION.
a. ALL WORK SHALL COMPLY WITH MASSDEP BEACH NOURISHMENT
GUIDE AND BEST MANAGEMENT PRACTICES. (MARCH 20070
9. BASEMAP PREPARED BYSCHOFIELDD BROTHERS — ENTITLED
"PLAN OF PROPOSED OR€DGENING & FILLING" DATED 1994.
10. CONTRACTOR SHALL MEET WITH YARMOUTH CONSERVATION AGENT
PRIOR TO CONSTRUCTION TO REVIEW MEANS AND METHODS OF WORK.
EROSION & SEDIMENT CONTROL NOTES
1 ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE DONE IN ACCORDANCE WITH THE MASSACHUSETTS
ENVIRONMENTAL PROTECTION STANDARDS.
2. THOSE AREAS UNDERGOING ACTUAL CONSTRUCTION WILL BE LEFT IN AN UNTREATED OR UNVEGETATED
CONDITION FOR A WNIMUM TIME. AREAS SHALL BE PERMANENTLY COMPACTED & STABILIZED WITHIN
15 DAYS OF FINAL GRADING AND TEMPORARILY STABILIZED .
3. SEDIMENT BARRIERS (SNOW FENCE, MAY BARRIERS, ETC.) SHOULD BE INSTALLED PRIOR TO ANY SOIL DISTURBANCE
OF THE CONTRIBUTING DRAINAGE AREA ABOVE THEM. MULCH NETTING SHALL BE USED TO ANCHOR
MULCH IN ALL AREAS WITH SLOPES GREATER THAN 15%. AFTER OCTOBER 1ST, THE SAME APPLIES
FOR ALL SLOPES GREATER THAN 8%,
4, INSTALL SEDIMENT BARRIERS AT TOE OF SLOPE TO FILTER SILT FROM RUNOFF. SEE DETAILS FOR PROPER
INSTALLATION. SEDIMENT BARRIERS WILL REMAIN IN PLACE PER NOTE J5.
5. ALL EROSION CONTROL STRUCTURES WILL BE INSPECTED, REPLACED AND/OR REPAIRED EVERY 7 DAYS AND
IMMEDIATELY FOLLOWING ANY SIGNIFICANT RAINFALL OF SNOW MELT OR WHEN NO LONGER SERVICEABLE DUE
TO SEDIMENT ACCUMULATION OR DECOMPOSURE. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH
STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE HALF THE HEIGHT OF
THE BARRIER. SEDIMENT CONTROL DEVICES SHALL REMAIN IN PLACE AND BE MAINTAINED BY THE CONTRACTOR
UNTIL AREAS UPSLOPE APE STABILIZED BY TURF.
B. NO SLOPES, EITHER PERMANENT OR TEMPORARY, SHALL BE STEEPER THAN TWO TO ONE (2 TOI).
7. DURING THE CONSTRUCTION PHASE, INTERCEPTED SEDIMENT WILL BE RETURNED TO THE SITE AND REGRADED
ONTO OPEN AREAS.
&. WINTER CONSTRUCTION PERIOD: NOVEMBER 1 THROUGH APRIL 15.
9. EXPOSED AREA SHOULD BE LIMITED SO THAT IT CAN BE WORKED IN ONE DAY PRIOR TO ANY SNOW EVENT.
10. CONTINUATION OF EARTHWORK OPERATION ON ADDITIONAL AREAS SHALL NOT BEGIN UNTIL THE EXPOSED SOIL
SURFACE ON THE AREA BEING WORKED HAS BEEN STABILIZED SUCH THAT NO LARGER AREA OF THE SITE IS
WITHOUT EROSION CONTROL PROTECTION AS LISTED IN ITEM ABOVE,
RONALD
T1BEM
No. 94775
TITLE:
BEACH NOURISHMENT
[SCALE: AS NOTE)[DATE:
12/12/11
SHEET No:
DRAWN BY: PROJECT No:
SOG 2011-223
CHECKED BY: RT CAD I.D. #: i
CroweII0.dwq OF 1 I
PROFESSIO AL ENGINEER
MASSACHUSETTS LICENSE No. 34773 CONSTRUCTION CHECK DATE