Loading...
HomeMy WebLinkAbout83-1916 - Beach Nourishment0033� vt 2�-,. Lawn Area \ ` , \k _ CLO23A I i 4 31` I l , 1 4 \ Ok I \ 1 \ s 4 i I V � ' I \ \: ,BEACH BAREPGG�S`' \ ` shy`.' \, `I` i j ;1 ��'�� / \ PA 9110 ` \ , \ 0 LEWIS BAY ��� �l � i -r� t? p 4' Beach Beach 1 Side slope Proposed Note: Should Rip—Rap Placement Channel be necessary Min Stone size 6"-12" or SHA Class I SECTION B -B NTS \ 1 �ssfan� e� �I 4 C 0 BEACH H—AR Sea Grass Planting Area 4 LOT 23B j (►� 6� 0 S a 0 , S cp r o\o� L ^' CI PLIANT VIEW Scale : 1 "=30' LOT 13 P1,13PS &13P6 SECTION A—A H:1 "-20' V:1 "=10, GENERAL NOTES 1., ELEVATIONS REFER TO NGVD OF 1929. 2. WORK LIMIT SHALL BE STAKED PRIOR TO CONSTRUCTION 3. NO CONSTRUCTION ACTIVITY OR CONSTRUCTION EQUIPMENT SHALL ENCROACH ON THE SALT MARSH OR BE SEWARD OF THE WORK LIMIT LINES AS DEPICTED ON THE PLANS. 4. ALL UNUSABLE DREDGED MATERIAL SHALL BE DISPOSED OF IN AN APPROPRIATE LOCATION, CLEAN SAND DREDGE MATERIAL MAY BE PLACED 014 THE BEACH ABOVE THE EHW. S. ALL SAND FILL USED FOP, BEACH NOURISHMENT SHALL BE CLEAN SAND, CONSISTENT COLOR AND GRAIN SIZE TO THE EXISTING SAND ON THE BEACH. SEE SAND SAMPLE SIEVE RESULTS AS REQUIRED BY 310 CMR 10.27(5). 6. ALL SAND FILL PLACED SHALLBE FIRMLY COMPACTED DURING AND AFTER PLACEMENT. 7, SNOW FENCING WILL BE PLACED ON THE. -BEAN FOR STABILIZATION AFTER CONSTRUCTION. APPLICANT SHALL CONSU 1 WITH YARMOUTH CONSERVATION OFFICER REGARDING PLACEMntvr-LotAwN. 8. ALL WORK SHALL COMPLY WITH MASSDEP BEACH NOURISHMENT GUIDE AND BEST MANAGEMENT PRACTICES. (MARCH 2007) 9. BASEMAP PREPARED BY SCHOFIELD BROTHERS - ENTITLED "PLAN OF PROPOSED DREDGENING & FILLING" DATED 1994. 10. CONTRACTOR SHALL MEET WITH YARMOUTH CONSERVATION AGENT PRIOR TO CONSTRUCTION TO REVIEW MEANS AND METHODS OF WORK. EROSION & SEDIMENT CONTROL NOTES 1 ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE DONE IN ACCORDANCE WITH THE MASSACHUSETTS ENVIRONMENTAL PROTECTION STANDARDS. 2. THOSE AREAS UNDERGOING ACTUAL CONSTRUCTION WILL BE LEFT IN AN UNTREATED OR UNVEGETATED CONDITION FOR A MINIMUM TIME. AREAS SHALL BE PERMANENTLY COMPACTED & STABILIZED WITHIN 15 DAYS OF FINAL GRADING AND TEMPORARILY STABILIZED . 3. SEDIMENT BARRIERS (SNOW FENCE, HAY BARRIERS, ETC. SHOULD BE INSTALLED PRIOR TO ANY SOIL DISTURBANCE OF THE CONTRIBUTING DRAINAGE AREA ABOVE THEM. MULCH NETTING SHALL BE USED TO ANCHOR MULCH IN ALL AREAS WITH SLOPES GREATER THAN 15Y. AFTER OCTOBER 1ST, THE SAME APPLIES FOR ALL SLOPES GREATER THAN 8%, 4. INSTALL SEDIMENT BARRIERS AT TOE OF SLOPE TO FILTER SILT FROM RUNOFF. SEE DETAILS FOR PROPER INSTALLATION, SEDIMENT BARRIERS WILL REMAIN IN PLACE PER NOTE #5. .,. ALL EROSION CONTROL STRUCTURES Vi4 BE INSPECTED, REPLACED AND/OR REPAIREDEVERY 7DArSAh D IMMEDIATELY FOLLOWING ANY SIGNIFICANT RAINFALL OF SNOW MELT OR WHEN NO LONGER SERVICEABLE DUE TO SEDIMENT ACCUMULATION OR DECOMPOSURE, SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE HALF THE HEIGHT OF THE BARRIER. SEDIMENT CONTROL DEVICES SHALL REMAIN IN PLACE AND BE MAINTAINED BY THE CONTRACTOR UNTIL AREAS UPSLOPE ARE STABILIZED BY TURF. 6. NO SLOPES, EITHER PERMANENT OR TEMPORARY, SHALL BE STEEPER THAN TWO TO ONE (2 T01). 7, DURING THE CONSTRUCTION PHASE, INTERCEPTED SEDIMENT WILL BE RETURNED TO THE SITE AND REGRADED ONTO OPEN AREAS. 8. WINTER CONSTRUCTION PERIOD: NOVEMBER 1 THROUGH APRIL 15, 9. EXPOSED AREA SHOULD BE LIMITED SO THAT IT CAN BE WORKED IN ONE DAY PRIOR TO ANY SNOW EVENT, 10, CONTINUATION OF EARTHWORK OPERATION ON ADDITIONAL AREAS SHALL NOT BEGIN UNTiI THE EXPOSED SOIL SURFACE ON THE AREA BEING WORKED HAS BEEN STABILIZED SUCH THAT NO LARGER AREA OF THE SITE IS WITHOUT EROSION CONTROL PROTECTION AS LISTED IN ITEM ABOVE... PROJECT ESTIMATED QUANTITIES 1 TEMPORARY ALTERATION VOLUME 5 CYS 2. PERMANENT ALTERATION VOLUME 81 CYDS fioNAM 'n8[RI PROFESSIONAL ENGINEER MASSACHUSETTS LICENSE No. 34773 PROJECT: CROWELL BEACH ASSOCIATION 47 Crowell Street W. Yarmouth MA 02673 (781) 641-9940 TITLE: BEACH NOURISHMENT SCALE: AS NOTED DATE: 1/12/13 SHEET No: DRAWN BY: PROJECT No: SOG 2011-223 CHECKED BY:CAD I.D. �: RT CrowellO.dwa , CONSTRUCTION CHECK DATE I � 1 REV. No.