Loading...
HomeMy WebLinkAbout83-1933 - Stormwater ManagmentMANAGEMENT 'STORMWATER � DESIGN AND CONSTRUCTION NOTES: 1 1. THE PURPOSE OF THIS PLAN IS TO DEPICT THE DESIGN AND LAYOUT OF THE l STORMWATER DRAINAGE SYSTEM ONLY. THE PROPOSED WATER PURPO ES ONRYICES THESHALL I BE PSERMITTED BY OTHERS AND IS SHOWN FOR INFORMATIONAL CONTRACTOR WILL COORDINATE THE RELOCATIONWA TER, T L ER, SEWER, IESS, AND ELECTRIC TELEPHONE SERVICES WITH THE TOWN AND PRIVATE 2. THE CONTRACTOR SHALL GRADE THE DRIVEWAY SO THAT HLE ATI�� S AREERERAIS NIOVEFTO COLLECTED AT THE SLOT DRAIN. ALL RIM AND INVERT THE PROPOSED INLET RIM ELEVATION. 3. ALL ROOF LEADERS SHALL BE DIRECTED BE MAI0THE NTAINEDAFORYALLITH ALL DISTRIBUTION j A MINIMUM SLOPE OF 1% WHICH SHALL f LINES. j 4. THIS PLAN DOES NOT DEPICT DEPICT THE EXACT LOCATION OR SIZE OF j EXISTING UTILITIES ON THE SITE OR WITHIN THE STREET. IT IS THE CONTRACTORS Uj RESPONSIBILITY FOR VERIFYING AND RECORDING THE LOCATION OF ALL UTILITIES_ 5.. ..THE ..CONTRACTOR SHALL CONTACT THE CITY FOR THE MARKING OF EXISTING MUNICIPAL UTILITIES, AND .SHALL ALSO CONTACT DIG -SAFE AT 1-888-344-7233, � � 6 FAX 1-800-322-4844. � DIG -SAFE MUST BE NOTIFIED AT LEAST 72 HOURS PRIOR �\ 2 TO EXCAVATION, 6. ALL WORK: PERFORMED AS A PART 0.F .THIS PROJECT SHALL CONFORM TO THE STANDARD SPECIFICATIONS AND REGULATIONS OF _THE TOWN OF YARMOUTH AND TO ALL APPLICABLE LOCAL AND STATE REGULATIONS.- 7. EGULATIONS:7. THE CONTRACTOR SHALL SUPPLY ALL PIPING, STRUCTURES, MATERIALS, AND APPURTENANCES, NECESSARY TO COMPLETE THE STORMWATER DRAINAGE SYSTEM. AS INDICATED ON THE PLAN. THE RIGHT TO IN ALL PRIVATE �= & THE TOWN OF YARMOUTH RESERVES 8. FACILITIES DISCHARGING TO MUNICIPAL FACILITIES. 9. DURING EXCAVATION AND CONSTRUCTION OF PIPES AND STRUCTURES, TRENCHES MUST BE ADEUATELY BRACED TO PROTECT AGAINST CAVE—IN AND 1 SHALL. BE ALL LOCAL AND STATE REGULATIONS. 10. PROPERTY LINES ARE BASED ON A SURVEY PLAN BY BSC ENGINEERING, . PLOT PLAN DATED JUNE 29, 2012. 11. ALL EXISTING UTILITIES SHALL BE CUT AND CAPPED AT THE MAIN IN THE STREET. 12. DURING INSTALLATION OF CRUSHED STONE BED, IF BLUE CLAY OR OTHER UNSUITABLE MATERIAL IS ENCOUNTERED, THE CONTRACTOR SHALL REMOVE AND BACKFILL CRUSHED STONE. 13. ALL PERFORATED PIPE SHALL BE ENCASED IN A MIN. OF 12" CRUSHED STONE. "CRAWL SPACE" 36" ADS INV_ ELEV. =$ TOP OF SLAB _ _ELEV.= 7.69 BOT OF FOOTING jk- ELEV.= 6.35 IV NOTE: FEMA REQUIREMENTS FOR FLOOD VENTS AS RELATED TO THIS PROJECT ARE AS FOLLOWS: 1) 1" OF VENT FOR EVERY SF. OF ENCLOSED AREA SUBJECT TO FLOODING & A MINIMUM OF TWO OPENINGS: 4,357 SF. OF AREA X 1 "= 4,357 SI. REQUIRED 2) SMART VENT #1540-521 IS DESIGNED FOR PROVIDING 800 SF. OF AREA. 3) DESIGN THREE FLOOD VENTS EACH USING TWO #1540-521 WHICH PROVIDES 1600 SF. (800X2=1600SF.) 4) THREE FLOOD VENTS PROVIDES A TOTAL OF 1600 SF.X3= 4800 SF. WHICH IS OVER THE REQUIRED 4,357 SF. MIN. 5) SEE SITE PLAN FOR LOCATION OF THREE FLOOD VENTS GRANITE BLOCK RETAINING WALL (SEE SITE PLAN) RATED Q 400 SF. EA.=1bUU �r WITH WATER TIGHT COLLAR AS PER MANUFACTURERS SPECIFICATION (STAINLESS STEEL) FEMA FLOOD VENT CROSSECTION FOR CRAWL SPACE N.T.S. / J°i•, ^LOOD WATERS INLET & OUTLW � .• CONTROLLED BY •, SMART VENT (4-#1540-520) •. i EXIST . 36" ADS INV ELEV. = 7.5 1 1 1 1 DRAINAGE CALCULATIONS: SYSTEMA STORMWATER MANAGEMENT GUIDELINES: WHILE THIS PROJECT IS NOT REQUIRED TO MEET STORMWATER MANAGEMENT STANDARDS IT DOES FOLLOW THE GUIDELINES AS RECOMMENDED BY DEP. STORAGE: SIX (6) PRECAST CONC. GALLEYS (4'X4'X4') - 64X6=384 C.F. CRUSHED STONE: (3/4'-1 1/2' WASHED STON€) 1'X8'X12' = 96 C.F.X407.=38.4 ( 1 OF STONE UNDER SYSTEM) 2'X4'X40' X 407. = 128 C.F. (2' OF STONE ARDUND SYSTEM) TOTAL STORAGE PROVIDED =384 +38.4 + 128- 550.4 C.F. REQUIRED STORAGE=12,696 S.F. X.0417(1/2"RULE)= 529.42 C.F. 9--, / DRAINAGE CALCULATIONS: SYSTEM#2 .,STORMWATER MANAGEMENT GUIDELINES: WHILE THIS PROJECT IS NOT REQUIRED TO hit -ET STORMWATER MANAGEMENT STANDARDS CONCRETE BOUND �'� IT DOES FOLLOW THE GUIDELINES AS RECOVVENDED BY DEP. FOUND & HELD STORAGE: /. ,77 TEN (10) PRECAST CONC. GALLEYS (4'X4'X4') = 64X1D=640 C.F. .y� CRUSHED STONo.CX442�A , 6 0%=6( 1CF STONEUNDER SYSTEM) ••��'• a 2'X4'X52' X 407. = 166.4 C.F. (2' 0'' STONE AROUND SYSTEM) TOTAL STORAGE PROVIDED =640 +64 + 166 870.4 C.F. y; .' REQUIRED STORAGE=18,432 S.F.X.0417(1/2'MLE)= 768.61 C.F. I �•% WF#9 RUSHED STONE 1/2" (TYP)- WF#81 FILTER FABRIC OVER 3' OF PEAST❑NE--i 6 J 2' (TYP) +• SURROUNDING—, V;#5 GALLEY ,i ISOLATED VEGETATED WETLAND BOTTOM OF ISOLATED VEGETATED WETLAND f nNIr'PFT1- QTCFP PROJECT: 316 GREAT ISLAND ROAD, W. YARMOUTH, MA. CLIENT: MR.. & MRS. PETROWSKL 316 GREAT ISLAND ROAD, W. YARMOUTH, MA. TYPICAL GALLEY & SUBSURFACE DRAINAGE SYSTEM NOT TO SCALE G x, ,N / _ "' I : �_�a t GALLEY��' 1' (TYP) i A N r •.`, , `UNDER 12' SDE SEM :'� V #4 L EY —� �_`t`,.EI�I•�•" ' -4.: 4'X4'X4' 1 �,/� �� � �_—►--�� r` � PRECAST CON13 GA LE � 1 10 12 13 ORWIG Associates Engineering Planning & Surveying Landscape Architecture 9 South Pasture Lane P.O. Bax 2132 Duxbury, MA 02331 Phone: (781)934-6039 E-mail: Dan—orwig@hotmail.com STORMWATER MANAGEMENT DRAINAGE PLAN SITE PLAN AMENDMENT TO ORDER OF CONDITIONS FOR SE 83-1933 INn.I REVISION I DA'Z'E DRAWING TITLE: DRAINAGE PLAN Piz 0 3 DRAV7I.NG NO. D.C.ORWIG 11)=201 0-29-2013 —� DRAWN BY PRIMARY SCALE DRAWING DATE 7