1. THE PURPOSE OF THIS PLAN IS TO DEPICT THE DESIGN AND LAYOUT OF THE l
STORMWATER DRAINAGE SYSTEM ONLY. THE PROPOSED WATER
PURPO ES ONRYICES THESHALL I
BE PSERMITTED BY OTHERS AND IS SHOWN FOR INFORMATIONAL
CONTRACTOR WILL COORDINATE THE RELOCATIONWA
TER, T L ER, SEWER, IESS, AND ELECTRIC
TELEPHONE SERVICES WITH THE TOWN AND PRIVATE
2. THE CONTRACTOR SHALL GRADE THE DRIVEWAY SO
THAT
HLE ATI�� S AREERERAIS
NIOVEFTO
COLLECTED AT THE SLOT DRAIN. ALL RIM AND INVERT
THE PROPOSED INLET RIM ELEVATION.
3. ALL ROOF LEADERS SHALL BE DIRECTED BE MAI0THE NTAINEDAFORYALLITH ALL DISTRIBUTION j
A MINIMUM SLOPE OF 1% WHICH SHALL f
LINES. j
4. THIS PLAN DOES NOT DEPICT DEPICT THE EXACT LOCATION OR SIZE OF j
EXISTING UTILITIES ON THE SITE OR WITHIN THE STREET. IT IS THE CONTRACTORS
Uj
RESPONSIBILITY FOR VERIFYING AND RECORDING THE LOCATION OF ALL UTILITIES_
5.. ..THE ..CONTRACTOR SHALL CONTACT THE CITY FOR THE MARKING OF EXISTING
MUNICIPAL UTILITIES, AND .SHALL ALSO CONTACT DIG -SAFE AT 1-888-344-7233, � � 6
FAX 1-800-322-4844. � DIG -SAFE MUST BE NOTIFIED AT LEAST 72 HOURS PRIOR �\ 2
TO EXCAVATION,
6. ALL WORK: PERFORMED AS A PART 0.F .THIS PROJECT SHALL CONFORM TO THE
STANDARD SPECIFICATIONS AND REGULATIONS OF _THE TOWN OF YARMOUTH AND TO
ALL APPLICABLE LOCAL AND STATE REGULATIONS.-
7.
EGULATIONS:7. THE CONTRACTOR SHALL SUPPLY ALL PIPING, STRUCTURES, MATERIALS, AND
APPURTENANCES, NECESSARY TO COMPLETE THE STORMWATER DRAINAGE SYSTEM.
AS INDICATED ON THE PLAN.
THE RIGHT TO IN
ALL PRIVATE �= &
THE TOWN OF YARMOUTH RESERVES
8.
FACILITIES DISCHARGING TO MUNICIPAL FACILITIES.
9. DURING EXCAVATION AND CONSTRUCTION OF PIPES AND STRUCTURES,
TRENCHES MUST BE ADEUATELY BRACED TO PROTECT AGAINST CAVE—IN AND 1
SHALL. BE ALL LOCAL AND STATE REGULATIONS.
10. PROPERTY LINES ARE BASED ON A SURVEY PLAN BY BSC ENGINEERING, .
PLOT PLAN DATED JUNE 29, 2012.
11. ALL EXISTING UTILITIES SHALL BE CUT AND CAPPED AT THE MAIN IN THE STREET.
12. DURING INSTALLATION OF CRUSHED STONE BED, IF BLUE CLAY OR OTHER UNSUITABLE
MATERIAL IS ENCOUNTERED, THE CONTRACTOR SHALL REMOVE AND BACKFILL
CRUSHED STONE.
13. ALL PERFORATED PIPE SHALL BE ENCASED IN A MIN. OF 12" CRUSHED STONE.
"CRAWL
SPACE"
36" ADS INV_
ELEV. =$
TOP OF SLAB _
_ELEV.= 7.69
BOT OF FOOTING
jk-
ELEV.= 6.35 IV
NOTE:
FEMA REQUIREMENTS FOR FLOOD VENTS AS RELATED TO
THIS PROJECT ARE AS FOLLOWS:
1) 1" OF VENT FOR EVERY SF. OF ENCLOSED AREA SUBJECT
TO FLOODING & A MINIMUM OF TWO OPENINGS:
4,357 SF. OF AREA X 1 "= 4,357 SI. REQUIRED
2) SMART VENT #1540-521 IS DESIGNED FOR PROVIDING
800 SF. OF AREA.
3) DESIGN THREE FLOOD VENTS EACH USING TWO #1540-521
WHICH PROVIDES 1600 SF. (800X2=1600SF.)
4) THREE FLOOD VENTS PROVIDES A TOTAL OF 1600 SF.X3=
4800 SF. WHICH IS OVER THE REQUIRED 4,357 SF. MIN.
5) SEE SITE PLAN FOR LOCATION OF THREE FLOOD VENTS
GRANITE BLOCK RETAINING WALL
(SEE SITE PLAN)
RATED Q 400 SF. EA.=1bUU �r
WITH WATER TIGHT COLLAR AS PER
MANUFACTURERS SPECIFICATION
(STAINLESS STEEL)
FEMA FLOOD VENT CROSSECTION FOR CRAWL SPACE
N.T.S.
/ J°i•,
^LOOD WATERS
INLET & OUTLW � .•
CONTROLLED BY •,
SMART VENT (4-#1540-520) •.
i EXIST .
36" ADS INV
ELEV. = 7.5
1
1
1
1
DRAINAGE CALCULATIONS: SYSTEMA
STORMWATER MANAGEMENT GUIDELINES:
WHILE THIS PROJECT IS NOT REQUIRED TO MEET STORMWATER MANAGEMENT STANDARDS
IT DOES FOLLOW THE GUIDELINES AS RECOMMENDED BY DEP.
STORAGE:
SIX (6) PRECAST CONC. GALLEYS (4'X4'X4') - 64X6=384 C.F.
CRUSHED STONE: (3/4'-1 1/2' WASHED STON€)
1'X8'X12' = 96 C.F.X407.=38.4 ( 1 OF STONE UNDER SYSTEM)
2'X4'X40' X 407. = 128 C.F. (2' OF STONE ARDUND SYSTEM)
TOTAL STORAGE PROVIDED =384 +38.4 + 128- 550.4 C.F.
REQUIRED STORAGE=12,696 S.F. X.0417(1/2"RULE)= 529.42 C.F.
9--,
/ DRAINAGE CALCULATIONS: SYSTEM#2
.,STORMWATER MANAGEMENT GUIDELINES:
WHILE THIS PROJECT IS NOT REQUIRED TO hit -ET STORMWATER MANAGEMENT STANDARDS
CONCRETE BOUND �'� IT DOES FOLLOW THE GUIDELINES AS RECOVVENDED BY DEP.
FOUND & HELD
STORAGE:
/. ,77 TEN (10) PRECAST CONC. GALLEYS (4'X4'X4') = 64X1D=640 C.F.
.y�
CRUSHED STONo.CX442�A
, 6 0%=6( 1CF STONEUNDER SYSTEM)
••��'• a 2'X4'X52' X 407. = 166.4 C.F. (2' 0'' STONE AROUND SYSTEM)
TOTAL STORAGE PROVIDED =640 +64 + 166 870.4 C.F.
y;
.' REQUIRED STORAGE=18,432 S.F.X.0417(1/2'MLE)= 768.61 C.F.
I
�•% WF#9
RUSHED STONE
1/2" (TYP)-
WF#81
FILTER FABRIC OVER
3' OF PEAST❑NE--i
6
J 2' (TYP) +•
SURROUNDING—,
V;#5 GALLEY
,i
ISOLATED
VEGETATED
WETLAND
BOTTOM OF
ISOLATED
VEGETATED
WETLAND
f nNIr'PFT1- QTCFP
PROJECT:
316 GREAT
ISLAND ROAD,
W. YARMOUTH,
MA.
CLIENT:
MR.. & MRS.
PETROWSKL
316 GREAT
ISLAND ROAD,
W. YARMOUTH,
MA.
TYPICAL GALLEY & SUBSURFACE DRAINAGE SYSTEM
NOT TO SCALE
G x, ,N / _ "' I : �_�a t GALLEY��' 1' (TYP)
i A N r •.`, , `UNDER
12' SDE SEM :'� V #4 L EY
—� �_`t`,.EI�I•�•" ' -4.: 4'X4'X4'
1
�,/� �� � �_—►--�� r` � PRECAST CON13
GA LE � 1
10
12
13
ORWIG Associates
Engineering
Planning & Surveying
Landscape Architecture
9 South Pasture Lane
P.O. Bax 2132
Duxbury, MA 02331
Phone: (781)934-6039
E-mail: Dan—orwig@hotmail.com
STORMWATER
MANAGEMENT
DRAINAGE
PLAN
SITE PLAN
AMENDMENT
TO ORDER OF
CONDITIONS
FOR SE 83-1933
INn.I REVISION I DA'Z'E
DRAWING TITLE:
DRAINAGE
PLAN
Piz 0
3
DRAV7I.NG NO.
D.C.ORWIG 11)=201 0-29-2013
—� DRAWN BY PRIMARY SCALE DRAWING DATE
7