Loading...
HomeMy WebLinkAbout83-1949 - proposed walkway, ramp, float, and erosion control002N/F SHEAHAN, JAMES E TRS 238 BLUE ROCK ROAD MAP 101 t -UT 171 / Etc �OC� FIFA �� �FMF�T `I0, FASTEN TREADS WITH COATED TIMBERLOCK FASTENERS AND/OR 3/8"X10" GALVANIZED ` SPIKES 48' CK TREADS 6"X6'� OR (8'x8") HEMLOCK 'COMPACTED PACTED B ACKF LL OPTIONAL 1/2" X 2' REBAR TO SECURE TREADS TO GROUND WITHOUT SIDE TIMBERS 14" MIN TREAD DEPTH PROPOSED A T -GRADE STEP DETAIL B SCALE: 1 "=5' (:ONSTRUCTION NOTES: SURVEY NOTES: 1. ELEVATIONS REFER TO MEAN LOW WATER (MLW). CONTACT SHOREFRONT • CONSULTING FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED. �. RED BUOY 3FSC7 RECORD OWNER . - - - - 2. CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUTE SHOWN ON THE PLAN ROGERS DANIEL AND DIRECTLY OVER THE APPLICANTS PROPERTY. ASSESSOR MAP t01 LOT 172 CERTIFICATE 91005 \ 3. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE APPROX. 40' WIDE CHANNEL � �, \� INSTALLATION OF THE WALKWAY, RAMP, FLOAT, AND STEPS. EQUIPMENT AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL PROPERTY IS SHO'�NN AS LOT 172 ON YARMOUTH ASSESSOR'S MAP 101 SUBMrrrED WITH THE NOTICE. OF INTENT, THE RESULTING ORDER OF CONDITIONS AND LIES WITHIN20NE R 40 AND OUTSIDE OF THE AQUIFER PROTECTION AND AS DIRECTED BY THE YARMOUTH CONSERVATION AUTHORITIES. DISTRICT PER TOV,'N OF YARMOUTH ONLINE ZONING MAP o LAST REVISED 4T/^011. THE INSTALLATION OF THE PILES, RAMP, AND FLOAT SHALL BE ACCOMPLISHED i.{ o FROM A WORKING BARGE AS MUCH AS PRACTICAL. THE REMAINDER OF WORK SHALL BE ACCOMPLISHED BY HAND. AT NO TIME SHALL THE WORKING BARGE PROPERTY LINES DEPICTED HEREON ARE BASED ON AFIELD SURVEY COME IN CONTACT WITH THE MARSH. BY EXISTING GRPIE INC. IN AUGUST AND SEPTEMBER, 2012 AND COMPILED FROMFL ANS ON RECORD RECORDED IN THE BARNSTABLE 5. A WORK LIMIT SHALL BE ESTABLISHED AS SHOWN ON THE P ANQ MAINTAINED COUNTY REGISTRY OF DEEDS LAND COURT PLANS: 28477-B TO-INSUREINIMAL ACTIVITY iN TING MARSH, WI MINIMAL•ACTI / RING BEYOND THE WORK -LIMIT. )EQUIPMENT SHALL BE ORIGIN OF BEARINGS IS LAND COURT PLAN 28477-B, LOT 15, APPLICANPS PWPE!TY-LYURI OF HIGH TIDE AND WHEN NOT IN USE. / - WORKING BARGE TO BE ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS / ORIGIN OF ELEV£, (IONS ARE BASED ON FIRM REFERENCE MARK RM 9 �o \' I OF LOW TIDE. ELEVATION 17.94RGVD 1929, AS SHOWN ON RECOPIED LICENSE PLAN NO. / 1 6. PILES SHALL BE DRIVEN TO THE DEPTHS SPECIFIED ON THE PLAN. IF DESIGN 12243• EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE PARCEL APPEARS TO LIE WITHIN FLOOD ZONES A-5 JEL-V NGVD), CONTACTED BEFORE PROCEEDING. PILES SHALL BE MECHANICALLY DRIVEN FROM THE WORKING BARGE WHERE POSSIBLE. WHERE NECESSARY, PILES CAN BE, ZONE B AND ZONE PER FIRM PANEL #2 OF 7, O 1 INITIALLY JETTED INTO PLACE TO SET THE PILE, WITH THE REMAINDER OF THE COMMUNITY PANEL NUMBER 250015 0002 D MAP REVISED `PILE BEING MECHANICALLY DRIVEN. ANY EXCESS MATERIAL FROM JETTING SHALL JULY 2,1992 AS &OWN ON FEMA ON LINE DATA BASE. BE REMOVED FROM THE BASE OF THE PILE AND MOVED TO AN UPLAND LOCATION. EXISTING CONDITt0NS SHOWN HEREON WERE COMPILED FROM Z PLYWOOD MAY DE USED TO PROTECT MARSH FROM FOOT TRAFFIC DURING FIELD SURVEY PEE:FORMED BY EXISTING GRADE INC. CONSTRUCTION, BUT SHALL BE REMOVED AT THE END OF EACH WORK DAY. IN SEPTEMBER 2312. �00'f T6NOPPOSITE SHORELINE �� ✓ / �� _ �� 8. 14LLAREAS DISTURBED DURING CONSTRUCTION SHALL tE RETURNED TO THEIR WETLAND RESOUIPCES SHOWN WERE FIELD IDENTIFIED BY .PRE -CONSTRUCTION CONDITION. ALL WORK SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND SURVEYED BY EXISTING GRADE INC. SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE. _ --- \ SURVEYOR HAS MODE NO INVESTIGATION OR INDEPENDENT SEARCH 8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO FOR EASEMENTS OF RECORD, ENCUMBRANCES, RESTRIC77VE COVENANTS, •` ` 6 , RESEMBLE THE PRE -CONSTRUCTION CONTOURS AND CONDITIONS. c \ _ - OWNERSHIPTITLEVIDENCE,ORANYOTHERFACTSTHATANACCURATE � _ 10. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED AND CURRENT TIr:E SEARCH MAY DISCLOSE. �''�• ��'-� --L__ '" 1 6 G�EFEEN BUOY�;'f33 - FOR THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO PROPOSED '� - - -� THE START OF ANY WORK. _ 0 \ ` PRpppSr ?--_ _ \� _ - _ _ 4 11. ALL MATERIALS IN CONTACT WITH THE GROUND SHALL NOT BE PRESSURE OPO. ST \ �L — - - - - - — - - TREATED PILES SHALL BE GREENHEART OR OTHER ROT RESISTANT MATERIAL AS FL I RQI4CARM \ �i - - — GREEN BUOY 39 APPROVED BY THE YARMOUTH CONSERVATION COMMISSION. ALL TIMBER USED JPPORTS _ ---- --- - FOR ABOVE f ✓./\ �( t� Z' - 254 TO NEq - - OR EQUAL AS APPROVED BYFRAMING (OWNER OGRADE) SHOREFRONT CONSULTING. TREATED, ACQ - - - n _ REST ELOAT —r `i —7 DEP LICENSE N0. 409 72. OTHERWISE ALL AAPPROVED BY OWNER OR SHORRE SHALL BE GALVANIZED OR EFRONT CONSULTING. NLESS STEEL, S _ S 2'x 10 ut �7 / �� 13. THE CONSTRUCTION PROTOCOL INCLUDED WITH THE NOTICE OF INTENT SHALL BE 6' sraRAGE BENCH " / INCLUDED WITH THESE SPECIFICATIONS AND REMAIN IN FORCE UNTIL THE PROJECT IS COMPLETED. SALT MARSH Ppopns S' .. ARFAA'FOR1-v,Av4K/ / VEGETAGL;� / Bt IF FFP n S(J 10 20 40 »r�' ,00' OFFSET F ,'.".'�."' -ZC' ---_�ROIvt b1H'JJ / A ti EXISTING GRADE � `R'EGRADE SCARP WITH COMPATIBLE MATERIAL AND PLANT WITH SPARTINA 1 PROPOSED E" DIAM , 20' Pd/F EXISTING SCARPL'G FIBER TOLL, / SCHEFF DORS P TRS 1f 25ii BLUE ROCK ROAD T'^' MAP 101 L-iT 173 \ EXISTING - DWELLING 20 18 16 14 12 /6"X6" OR (8"x8") HEMLOCK TREADS 10 48 �r 8 COMPACTED BACKFILL 6 4 2 SECURE TREADS T0: GROUND WITH I �� 1/2" X 2' REBAR V SPACING VARIES ? WITH SLOPE —4 —6 t FADE STEP DET' 11 C - PROPO�E_� A T--C� 1 _ SCAT E: 1"=-5' \ 3/8" STAINLESS STEEL CABLE; SLEEVE IN FLEXIBLE HOSE TO PREVENT CHAFFING F!8ER ROLLS S.S. CABLE ANCHORS; DB 68 OR EQUAL; (ANCHOR EVERY 3 FT.); EMBED 5' MINIMUM INTO UNDISTURBED SOIL, TIBER ROLL OETA111 SCALE 1"=5' ' ` a MLW LANT SPARTIN / IN REGRADED / Y�REA .,,EX. RAMP (TEG/ -.QBE REM ,111, M REMOVE R64,ROAD A4O NH ",TIES�(TTYYR)' dF�0�8 PROPOSED NEW / 3 STEPS (3 TOTALS �. X �\ STAIR WORK AREA DETAIL A SCALE: 1"=10' 3" X 8" CROSS , BRACING, (LAST BENT ONLY) x 4"x4" POST (-YP) SECTION B -B EL' VA TION SCALE: 1"--2' 3/" THROUGH BOLT WITH DOCK WASHERS (TYP) 3/q" THROUGH BOLT WITH DOCK WASHERS (TYP) AT EACH PILE -� 3/q" THROUGH BOLT WITH DOCK WASHERS (TYP) 8" GREENHEART PILES (TYP) 1 - EDGE OF MARSH '00' OFFSET FROM MHW (RIVE.RFRONT AREA)— -- FLOAT EXILNDS 2b --�! BEYOND MHW -� MI I MEAN LOW WATER X —3.39 SPOT ELEVATION —2— FLOOD ZONE A5 (EL C NGVD), AND TOP OF COA.STAI BANK S�u PLAN SNOWIN'_:- PROPOSED WALKWAY, RAMP, FLOAT A"JD EROSION CONTROL MHW=2.1'-�' I COASTAL BEACH ^-_- --- - LAWN ------- --N��-�- LSCSF--�t�'---- VEGETATED BUFFER ----- SALT MARSH F- LAND UNDER (l. -.FAN --� ----------�-- PROPOSED PATIO--'�__ EXTENSION --- _f"",-PROPOSFO - _ _ AT -GRADE STEPS; SEE OEi.AIt S : _---- - MLW=0.0 —� TREE PROPOSED 2 _-.�'4 -- .PATIO- - - 1 -_ RETAINING WALT_- --_ .� p^nOPOSEU152't ELEVATED WALKWAY; DEC - - EL.= 7.1'.MLW .PROPOSE 2'r,10' -- --- -}-- --- OTFA� NCFr - - - ,.. I F11cT ___ - --- --- - -=-I RO I i SUF OTl'NES (3)-� --�� �_ _— i T• '— �_�: _ ��� _ . FairH -- � h+ -�_-�1 : f — _ PROPOSED 8'x20' FL A7 I DETAIL f — T T B - f- -- STEP LF — t __ -- ! —. _ . _ .. — _-- --7 5' .ABOVE MhN� I -- -- f F.1HW-2.1 cz - - _ - r-----— FOR KAYAK CROSS ! MLW=O.C' - .-__- _- __ _IAST RFNT-�3�--� - _—-_--_- - ------ -- PROPOSED 8'0 PILES, i -a-- 13't ---� PROPOSE 10"0 PILES! -- - --- -� ----- -- I2"0 -- ---' ONNTYH) �- 'PROP SED PILL: I- -- ---- - --- ------I--------- -- K8-?. 20 4G 60 80 100 SECTION A -A ELEVATION SCALE: 1"=10' v 120 ANk MVM rLUA; 140 20 is 16 14 12 10 8 4 v —2 -6 -G 160 —'— —'— EDGE OF MARSH x�� MEAN HIGH WATER MI I MEAN LOW WATER X —3.39 SPOT ELEVATION —2— r S�u PLAN SNOWIN'_:- PROPOSED WALKWAY, RAMP, FLOAT A"JD EROSION CONTROL PROPERTY LINE 19 IM E LIMIT OF WORK/ACCESS PROJECT DAN AND _;USTINE ROGERS 244 BLUE ROCK ROAD YARMOUTH, MA DRAWN BY MOB MARSH (PATENS) DPAWING NO. MARSH (SPARTINA ALTERNIFLORA) C —1 1 or 1 SHEETS TREE % "..•V R Q, F s s w• _ —'— —'— EDGE OF MARSH ter, MEAN HIGH WATER MI I MEAN LOW WATER X —3.39 SPOT ELEVATION —2— ELEVATION CONTOUR S�u PLAN SNOWIN'_:- PROPOSED WALKWAY, RAMP, FLOAT A"JD EROSION CONTROL PROPERTY LINE 19 IM E LIMIT OF WORK/ACCESS PROJECT DAN AND _;USTINE ROGERS 244 BLUE ROCK ROAD YARMOUTH, MA DRAWN BY MOB MARSH (PATENS) DPAWING NO. MARSH (SPARTINA ALTERNIFLORA) C —1 1 or 1 SHEETS TREE RAILING CAP (TYP) 2"x4" RAILING (TYP) 't, K THROUGH BOLT (TYP) IF -11 IL. M, 2"x10" STRINGERS It (TYP) C I ° a, ) '�•��: 2"x6" DECKING W/ 3x8 3/y" SPACING; YOKE; i OVERLAP 1" (TYP) (2) TYP. ate, 3/q" THROUGH kk BOLT WITH DOCK 4 WASHERS (TYP) 1` 3"x8" CROSS BRACING, (LAST BENT ONLY) : 8" GREENHEART PILES (TYP) WALKW Y ELEVA TION DETAIL SCALE: 1"=2' OF :p2 EDWIN H w� h V'� i o GEES JR. L.� (Vi.a," CIVI L w No.41294 f \fin owe �n SEg3 - )aye i NO. DATE REVISION BY S�u PLAN SNOWIN'_:- PROPOSED WALKWAY, RAMP, FLOAT A"JD EROSION CONTROL PROJECT NO. SC -16 s AS SHOWN DATE 10/30/12 PROJECT DAN AND _;USTINE ROGERS 244 BLUE ROCK ROAD YARMOUTH, MA DRAWN BY MOB CHECKM EG DPAWING NO. SHOREFa�-NT CONSULTING X90 CENTER STREET,- :7YNISPORT, MA. 02639 (50B) 280-8046 VW',i.S-EIREFRONTCONSULTING.COM C —1 1 or 1 SHEETS f \fin owe �n SEg3 - )aye