HomeMy WebLinkAboutBLD-17-001412Sheet Index
Page Name
Al
Title Page
A2
Barn 1st & 2nd Floor & Foundation Plan
A3
Barn Elevations
A4
Framing Plans & Sheerwall Notes
A5
Typ. Wall Section, Section Details & Sch...
Ab
Details 1 1/2"
A7
Specifications
202 Pleasant St South
Yarmouth MA
GENERAL NOTES:
1. THESE DRAWINGS AND ALL ASPECTS OF THE PROJECT SHALL COMPLY WITH IRC 2009 AND 780 CMR - MA
AMENDMENTS TO THE IBC AS WELL AS ANY TOWN AMENDMENTS OR BY-LAWS, LIFE SAFETY PLUMBING AND
ELECTRICAL CODES. IF ANY CONFLICT IS FOUND, NOTIFY THE ARCHITECT IMMEDIATELY.
2. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL PERMITS NECESSARY FOR THE
COMPLETION OF WORK.
3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF DIMENSIONAL REQUIREMENTS
BETWEEN THE WORK OF REQUIRED TRADES / SUBCONTRACTORS.
4.THE GENERAL CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING WORK INCLUDING ALL
DIMENSIONS, GRADES, PROPERTY LINES, EXISTING BUILDINGS, AND NEW WORK. THE CONTRACTOR SHALL LAYOUT IN
THE FIELD THE ENTIRE WORK TO BE PERFORMED TO VERIFY DIMENSIONAL RELATIONSHIPS. THE ARCHITECT SHALL
BE NOTIFIED OF ANY VARIATIONS FROM INFORMATION PROVIDED IN THE DRAWINGS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY VARIATIONS OR DEVIATIONS FROM THE PLANS WITHOUT WRITTEN
CONFIRMATION FROM THE ARCHITECT. CONTRACTOR MUST SUBMIT ANY PROPOSED CHANGES IN WRITING AND
PROVIDE ADEQUATE TIME FOR REVIEW BY THE ARCHITECT FOR PROPOSED CHANGES OR REQUESTS FOR
ADDITIONAL INFORMATION.
FQ
ONTRACTOR SHALL PROVIDE ANY ITEMS REQUIRED BY CODE OR FOR THE PROPER INSTALLATION ,FUNCTION, OR
3 °"'"� t`,OMPLETION OF AN ASSEMBLY REGARDLESS IF SAID ITEM IS SHOWN OR NOT. SUB -CONTRACTORS SHALL INFORM
THE GENERAL CONTRACTOR OF THEIR REQUIREMENTS FOR THE WORK REQUIRED BY OTHER TRADES PRIOR TO
SUBMITTAL OF FINAL BIDS
7. THE ARCHITECT CANNOT ACCEPT RESPONSIBILITY FOR SPECIFIC QUANTITIES OR QUALITIES LISTED HEREIN.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THESE CONSTRUCTION DOCUMENTS AND CONFIRM THE
SUITABILITY OF THIS HOUSE FOR PARTICULAR BUILDING SITE.
8. IN ADDITION TO THE ITEMS LISTED THE OWNER SHOULD SELECT FINISH MATERIALS SUCH AS COLORS AND TYPES OF
PAINTS, STAINS, TILE, CARPET, CABINETS, COUNTER TOPS AND, LIGHT AND PLUMBING FIXTURES, ALSO TO BE
CONSIDERED ARE THE HEATING/COOLING SYSTEM, WIRING, PLUMBING AND EXTERIOR SITEWORK.
9. CONTRACTOR SHALL PROVIDE ADEQUATE BRACING OR OTHERWISE SUPPORT ALL PORTIONS OF THE STRUCTURE
UNTIL ALL MEMBERS HAVE BEEN PERMANENTLY CONNECTED TOGETHER. PLUMBING DIAGRAMS OR DRAWINGS
SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR. HEATING/COOLING DUCT DIAGRAMS OR DRAWINGS SHALL
BE PROVIDED BY THE HEATING/COOLING CONTRACTOR. HEAT LOSS OR ENERGY CALCULATIONS SHALL BE
PROVIDED BY THE HEATING/COOLING CONTRACTOR OR OTHER PROFESSIONAL AS REQUIRED BY THE BUILDING
OFFICIAL. TRUSS DESIGN, ENGINEERING AND PLANS SHALL BE PROVIDED BY THE TRUSS MANUFACTURER.
10. ANY SPECIFIED CONNECTORS OR STRUCTURAL ELEMENTS MAY ONLY BE SUBSTITUTED WITH WRITTEN PERMISSION
BY THE STRUCTURAL ENGINEER.
Obtaining an Home Energy Rating System index Score (HERS) for compliance with the International Energy
Conservation Code (I ECC) 2009 with Massachusetts Amendments "The Stretch Energy Code" OR the 2012
IECC shall be the responsibility of the owner or contractor.
A HERS certified professional will be required to perform testing and documention for compliance with current
energy codes and shall be the responsibility of the owner or contractor and is not included in this document.
i
A- .... ...
1'
I.-,. lJi I :.IL it is it ,�-�-
TOWN OF YARMOUTH
REVIEWED FOR BUILDIG AND ZONING
FILE COPY ANCE. ERRORS OR ONNdISSIONS DO NOTODE EREL OPLI-
VrE THE
APPLICANT FROM THE RESPONSIBILITY OF 'AS BUILT'
COMPLIANCE.
DATE:
BUILDING OFFICIAL
A CERTIFIED AS BUILT IS REQUIRED
BEFORE FINAL INSPECTION
REVISIONS
DETAILS ADDED P. 10 &
11 & VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain property of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
without specific written
authorization by Campbell
Smith Architects Inc.
C CAMPBELL SMITH
RCHITECTS LLC
Campbell I Smith
A R C H I T E C T S
PO Box 1450
22 Depot Street
Duxbury, MA 02331
781-934-7181
www.campbellsmitharchitects.com
PROJECT:
Sullivan
Residence
LOCATION:
202 Pleasant St
South Yarmouth
MA
Title Page
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
PAGE
1 of 7
VDATION &CONCRETE NOTES
Az
I
( a
I As
I
Ir
4TV
4'-4" 9'-0" T-8' 9'-0" 2'-8" 9'-4" 4'A"
I
b o
M
DROP TOP OF WALL 8"+/ M
4 Y 4 4
m o o m
N N
o _o
I
i
I
2 710 1 5/1 6"
42 �"
4
A2
I
I • I
I � OPENINGS FOR SLAB I
I I I I
I
,I I
j � I PITCH SLAB 1/8" PER FT. I � �
I � I
Z4'.CONCRETE SLAB W/ 6X6 10/1 TOWARDOPENINGSW.M. ON 6 MIL. POLY VAPOR
I � ;I
I w I BARRIER ON 6" COMPACTED BASE i a
1 � � �
Z I
I
i
J I
I z I Fe
Z „I
I o I O I
� w I „I
1
LL ' o %I
I O I a I
I p I p
i 10" CONCRETE FROST WALL
ON 20"X10" CONC.
FOOTING W/ CONT. 2X4 KEY
ON UNDISTURBED SOIL (l'1'P.)
T-51/2" 11'-5 M 6"
PREAD FOOTINGS HAVE BEEN DESIGNED TO BEAR ON UNDISTURBED SOIL HAVING AN ASSUMED MINIMUM
)WABLE BEARING CAPACITY OF 2 TONS PER SQUARE FOOT. SOIL BEARING MATERIAL CAPACITY TO BE
:RMINED BY SOIL TESTS PRIOR TO CONSTRUCTION. SUBMIT REPORT BY A GEOTECHNICAL ENGINEER PRIOR TO
STRUCTION.
BEARING MATERIALS WITH A LOWER BEARING CAPACITY THAN 2 TONS PER SQUARE FOOT ARE ENCOUNTERED
1E SPECIFIED ELEVATIONS, THE UNDERLYING UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH
ABLE MATERIAL TO BE APPROVED BY THE ENGINEER.
HE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE VALIDITY OF THE SUBSURFACE CONDITIONS
10 FOUNDATION SHALL BE PLACED IN WATER OR ON FROZEN GROUND.
OOTINGS SHALL BE PROTECTED AGAINST FROST UNTIL PROJECT IS COMPLETED.
ACKFILL UNDER ANY PORTION OF THE FOUNDATIONS SHALL BE COMPACTED IN 6" LIFTS OF 95% COMPACTED
/EL AS APPROVED BY THE ENGINEER.
O NOT BACKFILL EXTERIOR WALLS ANY HIGHER THAN 3 FEET ABOVE THE TOP OF FOOTING UNTIL PERMANENT
ICTURAL SUPPORTS (FRAMED FLOORS AND SLABS) ARE IN PLACE. BRACE ALL WALLS AND GRADE BEAMS DURING
,FILLING,
IF NECESSARY.
ONCRETE WORK SHALL CONFORM TO THE LATEST AMERICAN CONCRETE INSTITUTE CODE FOR "BUILDING CODE
JIREMENTS FOR REINFORCED CONCRETE" AND "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
DINGS".
DNCRETE FOUNDATION WALLS AND FOOTINGS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 P.5.1.
3 DAYS AND 3,500 P.S.I. FOR SLABS, WITH A SLUMP OF NO MORE THAN 4" AND AIR ENTRAINMENT OF 4-6°k. THE
DF CALCIUM CHLORIDE IS NOT PERMITTED. PROVIDE PROPER CONCRETE PROTECTION OR HEAT IN COLD
1 -HER AND MAINTAIN PROPER CURING PROCEDURES IN ACCORDANCE WITH THE A.C.I.CP
STEEL REINFORCEMENT SHALL CONFORM TO A.S.T.M. 615, GRADE 60.
\LL CONCRETE SLABS ON GROUND SHALL BE REINFORCED WITH 6X6-10/10 (MIN.) WELDED WIRE FABRIC PLACED
ID -DEPTH, ORAS OTHERWISE SHOWN ON THE DRAWINGS. WELDED WIRE FABRIC REINFORCEMENT SHALL
FORM TO A.S.T.M. A185, AND SHALL LAP 6" MINIMUM OR ONE SPACE, WHICHEVER IS LARGER, AND SHALL BE
:D TOGETHER. PROVIDE SUFFICIENT CHAIR OR SUPPORT BARS AS NECESSARY TO POSITION WELDED WIRE
M1lHERE CONTINUOUS BARS ARE CALLED FOR THEY SHALL BE RUN CONTINUOUSLY AROUND CORNERS AND
'ED AT NECESSARY SPLICES OR HOOKED AT DISCONTINUOUS ENDS. LAPS SHALL BE 40 BAR DIAMETERS, UNLESS
SRWISE SHOWN.
dOTIFY BUILDING DEPARTMENT FOR INSPECTION AT LEAST 24 HOURS PRIOR TO SCHEDULED PLACEMENT OF
CRETE.
'LACEMENT OF CONCRETE POURS SHOULD HAVE A VERTICAL 2"X4" KEY WITH CONTINUOUS REINFORCING (40
DIAMETER MINIMUM) THRU THE CONSTRUCTION JOINT.
ALL REINFORCING BARS SHALL BE COLD BENT IN ACCORDANCE TO THE PROPER RADII ESTABLISHED BY THE
RICAN CONCRETE INSTITUTE. UNDER NO CONDITIONS SHALL HEAT BE APPLIED TO THE BARS TO OBTAIN BENDS.
'HE USE OF CONTROL JOINTS IN THE SLAB IS RECOMMENDED TO CONTROL CRACKING. SAW CUT TO A DEPTH
:E -QUARTER OF AND INCH. SEE PLAN FOR LAYOUT. FILL ALL JOINTS WITH SONNEBORN SL2 OR DOW CORNING
iLF•LEVELING SEALANT.
)AMP PROOF ALL FOUNDATION WALLS BELOW GRADE, OTHER THAN FROST WALLS
12
10
I 12
4 4
BOTTOM OF COLLAR TIE 2x6s ®16• ox.
Barn Foundation Plan
9' A.F.F. _BOTTOM OF COLLAR TIE
TOP OF PLATE
0
SECOND FLOOR BARN- -SECOND FLOOR BARN
W12 X 45 STEEL BEAM FLUSH �
(2)1L0' X 1196' DROPPED LVLs BEYOND
� I 1 13..0,
1
ISOL 6X6 POST INSIDE WALL
I e
i
i
TOP OF SLAB ' TOP OF SLAB
:o Z
' v �
` BOTTOM OF FOOTING
s
w
I E-8 4
1 A3 A5
I
------------------L-------------------------------q�4 y------- —4'4374
1 8102 I BiW 81W I 1
1 I I 1
1 ba I 4a 4^
SHEER WALL "Co BHEER WALL.'C"
I
I,,. I n I I 14.70
I 151.0"
--- �
BALCONY ABOV�
II I 10'x12 INTERIOR ROLLING DOOR
I I I =1 I I
I I I
ii I I I ii
- I BARN STORAGE
iONE LAYER TYP X GWB ALL WALLS &CEILING 12'+' m
II I II I
I I II I
B112 POCKET FOR ROLLING DOOR I
fV ;° — J
MIN. IR
I"ILLI2�
Z 6'-B" m MEC IJ N CA4 J
IROO� Ili J
------------------�--- —_---_�-��� � SII ----►
I _------- /'E� —i sem' I w
I U
1'.
Barn 2nd Floor Plan
a
0"
SH ER WALL'D" v I v r+ ^ e SHEER WALL "D" �
B �� I
E-6
A3
Barn Building Section /,-
Barn 1st Floor Plan �
REVISIONS
DETAILS ADDED P. 10 &
11 &VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain propert
y of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
without specific written
authorization by Campbell
Smith Architects Inc.
� CAMPBELL SMITH
RCHITECTS LLC
Campbell Smith
A R C H I T E C T S
PO Box 1450
22 Depot Street
Duxbury
, MA 02331
781-934-7181
PROJECT:
Sullivan
Residence
BUILDER
LOCATION:
202 Pleasant St
.South Yarmouth
MA
Barn 1st & 2nd Floor &
Foundation Plan
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
2of7
,
I
PREAD FOOTINGS HAVE BEEN DESIGNED TO BEAR ON UNDISTURBED SOIL HAVING AN ASSUMED MINIMUM
)WABLE BEARING CAPACITY OF 2 TONS PER SQUARE FOOT. SOIL BEARING MATERIAL CAPACITY TO BE
:RMINED BY SOIL TESTS PRIOR TO CONSTRUCTION. SUBMIT REPORT BY A GEOTECHNICAL ENGINEER PRIOR TO
STRUCTION.
BEARING MATERIALS WITH A LOWER BEARING CAPACITY THAN 2 TONS PER SQUARE FOOT ARE ENCOUNTERED
1E SPECIFIED ELEVATIONS, THE UNDERLYING UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH
ABLE MATERIAL TO BE APPROVED BY THE ENGINEER.
HE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE VALIDITY OF THE SUBSURFACE CONDITIONS
10 FOUNDATION SHALL BE PLACED IN WATER OR ON FROZEN GROUND.
OOTINGS SHALL BE PROTECTED AGAINST FROST UNTIL PROJECT IS COMPLETED.
ACKFILL UNDER ANY PORTION OF THE FOUNDATIONS SHALL BE COMPACTED IN 6" LIFTS OF 95% COMPACTED
/EL AS APPROVED BY THE ENGINEER.
O NOT BACKFILL EXTERIOR WALLS ANY HIGHER THAN 3 FEET ABOVE THE TOP OF FOOTING UNTIL PERMANENT
ICTURAL SUPPORTS (FRAMED FLOORS AND SLABS) ARE IN PLACE. BRACE ALL WALLS AND GRADE BEAMS DURING
,FILLING,
IF NECESSARY.
ONCRETE WORK SHALL CONFORM TO THE LATEST AMERICAN CONCRETE INSTITUTE CODE FOR "BUILDING CODE
JIREMENTS FOR REINFORCED CONCRETE" AND "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
DINGS".
DNCRETE FOUNDATION WALLS AND FOOTINGS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 P.5.1.
3 DAYS AND 3,500 P.S.I. FOR SLABS, WITH A SLUMP OF NO MORE THAN 4" AND AIR ENTRAINMENT OF 4-6°k. THE
DF CALCIUM CHLORIDE IS NOT PERMITTED. PROVIDE PROPER CONCRETE PROTECTION OR HEAT IN COLD
1 -HER AND MAINTAIN PROPER CURING PROCEDURES IN ACCORDANCE WITH THE A.C.I.CP
STEEL REINFORCEMENT SHALL CONFORM TO A.S.T.M. 615, GRADE 60.
\LL CONCRETE SLABS ON GROUND SHALL BE REINFORCED WITH 6X6-10/10 (MIN.) WELDED WIRE FABRIC PLACED
ID -DEPTH, ORAS OTHERWISE SHOWN ON THE DRAWINGS. WELDED WIRE FABRIC REINFORCEMENT SHALL
FORM TO A.S.T.M. A185, AND SHALL LAP 6" MINIMUM OR ONE SPACE, WHICHEVER IS LARGER, AND SHALL BE
:D TOGETHER. PROVIDE SUFFICIENT CHAIR OR SUPPORT BARS AS NECESSARY TO POSITION WELDED WIRE
M1lHERE CONTINUOUS BARS ARE CALLED FOR THEY SHALL BE RUN CONTINUOUSLY AROUND CORNERS AND
'ED AT NECESSARY SPLICES OR HOOKED AT DISCONTINUOUS ENDS. LAPS SHALL BE 40 BAR DIAMETERS, UNLESS
SRWISE SHOWN.
dOTIFY BUILDING DEPARTMENT FOR INSPECTION AT LEAST 24 HOURS PRIOR TO SCHEDULED PLACEMENT OF
CRETE.
'LACEMENT OF CONCRETE POURS SHOULD HAVE A VERTICAL 2"X4" KEY WITH CONTINUOUS REINFORCING (40
DIAMETER MINIMUM) THRU THE CONSTRUCTION JOINT.
ALL REINFORCING BARS SHALL BE COLD BENT IN ACCORDANCE TO THE PROPER RADII ESTABLISHED BY THE
RICAN CONCRETE INSTITUTE. UNDER NO CONDITIONS SHALL HEAT BE APPLIED TO THE BARS TO OBTAIN BENDS.
'HE USE OF CONTROL JOINTS IN THE SLAB IS RECOMMENDED TO CONTROL CRACKING. SAW CUT TO A DEPTH
:E -QUARTER OF AND INCH. SEE PLAN FOR LAYOUT. FILL ALL JOINTS WITH SONNEBORN SL2 OR DOW CORNING
iLF•LEVELING SEALANT.
)AMP PROOF ALL FOUNDATION WALLS BELOW GRADE, OTHER THAN FROST WALLS
12
10
I 12
4 4
BOTTOM OF COLLAR TIE 2x6s ®16• ox.
Barn Foundation Plan
9' A.F.F. _BOTTOM OF COLLAR TIE
TOP OF PLATE
0
SECOND FLOOR BARN- -SECOND FLOOR BARN
W12 X 45 STEEL BEAM FLUSH �
(2)1L0' X 1196' DROPPED LVLs BEYOND
� I 1 13..0,
1
ISOL 6X6 POST INSIDE WALL
I e
i
i
TOP OF SLAB ' TOP OF SLAB
:o Z
' v �
` BOTTOM OF FOOTING
s
w
I E-8 4
1 A3 A5
I
------------------L-------------------------------q�4 y------- —4'4374
1 8102 I BiW 81W I 1
1 I I 1
1 ba I 4a 4^
SHEER WALL "Co BHEER WALL.'C"
I
I,,. I n I I 14.70
I 151.0"
--- �
BALCONY ABOV�
II I 10'x12 INTERIOR ROLLING DOOR
I I I =1 I I
I I I
ii I I I ii
- I BARN STORAGE
iONE LAYER TYP X GWB ALL WALLS &CEILING 12'+' m
II I II I
I I II I
B112 POCKET FOR ROLLING DOOR I
fV ;° — J
MIN. IR
I"ILLI2�
Z 6'-B" m MEC IJ N CA4 J
IROO� Ili J
------------------�--- —_---_�-��� � SII ----►
I _------- /'E� —i sem' I w
I U
1'.
Barn 2nd Floor Plan
a
0"
SH ER WALL'D" v I v r+ ^ e SHEER WALL "D" �
B �� I
E-6
A3
Barn Building Section /,-
Barn 1st Floor Plan �
REVISIONS
DETAILS ADDED P. 10 &
11 &VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain propert
y of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
without specific written
authorization by Campbell
Smith Architects Inc.
� CAMPBELL SMITH
RCHITECTS LLC
Campbell Smith
A R C H I T E C T S
PO Box 1450
22 Depot Street
Duxbury
, MA 02331
781-934-7181
PROJECT:
Sullivan
Residence
BUILDER
LOCATION:
202 Pleasant St
.South Yarmouth
MA
Barn 1st & 2nd Floor &
Foundation Plan
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
2of7
RED CEDAR SHINGLES - 72
10 D WHITE CEDAR SHINGLES
TIE
_--_—_---_ __ _ _ _—_—_ CAPcRowNT=)_ - - _— _ --BOTTOMOFCOLLA
&-
_ : OP OF PLATE -SHED DORMER
2 F—T--i \ _-
- -- B201
10:12
TOP OF PLATE @ MAIN ROOF —OE
0
v
Y
ill
SECOND FLOOR BARN
— ` — - — - — - — - - — - — - — - — - - - — - — - — - — - — - — - — - — - — - — -
TOP OF SLAB
i
BOTTOM OF FOOTING
BRACKET � �I ��I� ]! � STRUCTURAL BRACKET -
'
CUSTOM BRACKET
10'X12' INTERIOR ROLLING DOORS ' o
! Ill
I II VIII I
II B105I�II]I II
ill! III
:- -_-_--TOP OF SLAB-�
Barn South Elevation r2--�
Scale:1/4° V-011
CORNERS
4" VERT. HED BOARDS 4" VERT. M ED BOARDS - 4" VERT. MAI C il D BOARDS
r. 5/4 WATER TABLE
CAP
-� 6104 8103 6102 r
TOP OF SLAB
v � �
I I
---------------------------------------------------------------------------------
BOTTOM OF FOOTING ----i
— — - — - — - — — - — - — — ---r
TOP OF PLATE ® MAIN ROOF_ - — - — 1 10:12 ._
— - —___FIBERGLASS GUTTER
—SECOND FLOOR BARN.
-- _ - TOP OF SLAB
5/4 WATER TABLE W/ CAP
I
I
I
I
.J -------------------------------------
BOTTOM OF FOOTING
Barn East Elevation K-4
Scale:1/411 = 11-0t1 A3
8106
SECOND FLOOR BARN
TOP OF SLAB
Barn West Elevation
Scale:1/4t1 = 11-011
CUSTOM
LACE]
CORNER
--------
5/4 WATER TABLE W/ CAP
F! ! 1, 11,
i
III
�R ROLLING DOORS I
1 1 1 !i'
it
6101 ' � it
I
CUSTOM BRACKET
_` _—_-- TOP OF SLAB
z
i
I BOTTOM OF FOOTING
Barn Borth Elevation
Scale:1/411 = 11-011 A3
REVISIONS
DETAILS ADDED P. 10 &
11 & VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain property of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
without specific written
authorization by Campbell
Smith Architects Inc.
P CAMPBELL SMITH
ARCHITECTS LLC
Campbell Smith
A R C H IT E C T S
PO Box 1450
22 Depot Street
Duxbury, MA 02331
781-934-7181
www.campbellsmitharchitects.com
PROJECT:
Sullivan
Residence
BUILDER
LOCATION:
202 Pleasant St
South Yarmouth
MA
Barn Elevations
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
PAGE
3of7
T
-
RED CEDAR SHINGLES
10
r r I
.
BOTTOM OF COLLAR TIE
-
RED CEDAR SHINGLES"
- "
-.
r T r.
BOTTOM OF COLLAR TIE
TOP OF PLATE @ SHED DORMER
-
CAP & CROWN rn(R.)
— — - — - — - — — - — - — — ---r
TOP OF PLATE ® MAIN ROOF_ - — - — 1 10:12 ._
— - —___FIBERGLASS GUTTER
—SECOND FLOOR BARN.
-- _ - TOP OF SLAB
5/4 WATER TABLE W/ CAP
I
I
I
I
.J -------------------------------------
BOTTOM OF FOOTING
Barn East Elevation K-4
Scale:1/411 = 11-0t1 A3
8106
SECOND FLOOR BARN
TOP OF SLAB
Barn West Elevation
Scale:1/4t1 = 11-011
CUSTOM
LACE]
CORNER
--------
5/4 WATER TABLE W/ CAP
F! ! 1, 11,
i
III
�R ROLLING DOORS I
1 1 1 !i'
it
6101 ' � it
I
CUSTOM BRACKET
_` _—_-- TOP OF SLAB
z
i
I BOTTOM OF FOOTING
Barn Borth Elevation
Scale:1/411 = 11-011 A3
REVISIONS
DETAILS ADDED P. 10 &
11 & VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain property of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
without specific written
authorization by Campbell
Smith Architects Inc.
P CAMPBELL SMITH
ARCHITECTS LLC
Campbell Smith
A R C H IT E C T S
PO Box 1450
22 Depot Street
Duxbury, MA 02331
781-934-7181
www.campbellsmitharchitects.com
PROJECT:
Sullivan
Residence
BUILDER
LOCATION:
202 Pleasant St
South Yarmouth
MA
Barn Elevations
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
PAGE
3of7
STRUCTURAL STEEL NOTES:
1. ALL STEEL SHALL BE NEW STEEL CONFORMING TO THE A.I.S.C. SPECIFICATIONS FOR DESIGN, FABRICATION AND
ERECTION OF STRUCTURAL STEEL FOR BUILDINGS AND A.S.T.M. - GRADE 50 FOR W SECTIONS GRADE 36 FOR OTHERS.
2. ALL SCHEDULE 40 OR 80 PIPE SHALL BE NEW STEEL CONFORMING TO THE A.I.S.C. SPECIFICATIONS FOR DESIGN,
FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS AND A.S.T.M. SPECIFICATION A53, TYPE'E' OR
'S', GRADE'S', WITH A MINIMUM YIELD STRESS OF 35 KSI.
3. ALL'TS' DESIGNATED TUBE SHALL BE NEW STEEL CONFORMING TO THE A.LS.C. SPECIFICATIONS FOR DESIGN,
FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS AND A.S.T.M. SPECIFICATION A500, GRADE'B'
WITH A MINIMUM YIELD STRESS OF 46 KSI.
4. ALL SHOP AND FIELD WELDS SHOWN SHALL BE MADE BY APPROVED CERTIFIED WELDERS AND SHALL CONFORM
TO THE A.W.S. CODE FOR BUILDINGS. ALL WELDS SHALL DEVELOP THE FULL STRENGTH OF THE MATERIAL BEING
WELDED. USE EXX 70 ELECTRODES.
5. NO PERMANENT CONNECTIONS SHOULD BE MADE UP UNTIL THE STRUCTURE HAS BEEN PROPERLY ALIGNED.
PROVIDE TEMPORARY BRACING AS REQUIRED.
6. SUBMIT THREE COPIES OF SHOP DRAWINGS TO THE ENGINEER SHOWING SETTING PLANS, ERECTION PLANS, ALL
DETAILS AND SIZES OF MEMBERS INCLUDING CONNECTIONS AND ALL ENGINEERING CALCULATIONS. STEEL
FABRICATOR IS RESPONSIBLE FOR FINAL CONNECTION DETAILS AND DESIGN IN ACCORDANCE WITH THE MINIMUM
REQUIREMENTS OF THE LATEST EDITION OF THE A.I.S.C. DETAILING MANUAL.
7. CONNECTION BOLTS TO BE 3/4" DIAMETER HIGH STRENGTH, A.S.T.M. A 325. PROVIDE A MINIMUM OF 2 BOLTS
PER CONNECTION. USE 1/2" MINIMUM CAP PLATE OR BASEPLATES FULLY WELDED ALL AROUND AT COLUMNS WITH A
3/16" FILLET WELD, OR AS OTHERWISE SPECIFIED ON THE DRAWINGS.
8. ALL STEEL SHALL HAVE TWO COATS OF RUST -INHIBITIVE PRIMER PAINT. TOUCH UP ALL WELDS, SCRATCHES OR
SCRAPES IN PAINT AFTER ERECTION.
9. WELD ALL STEEL CONTACT SURFACES (OTHER THAN BOLTED CONNECTIONS) WITH A CONTINUOUS 3/16 -INCH
(MINIMUM) WELD.
10. PROVIDE A 1/4" DIAMETER WEEP HOLE AT THE BASE OF ALL TUBE AND PIPE COLUMNS.
FRAMING NOTES
1. ALL FRAMING LUMBER SHALL BE HEM -FIR GRADE NO.2 OR S.P.F. (SPRUCE -PINE -FIR) GRADE NO. 1 / 2 OR APPROVED
EQUAL (UNLESS OTHERWISE SPECIFIED) AND SHALL MEET THE REQUIREMENTS OF THE AMERICAN FOREST AND PAPER
ASSOCIATION. THE MINIMUM ALLOWABLE BENDING STRESS (Fb) SHALL BE 875 P.S.I. THE MINIMUM ALLOWABLE
COMPRESSION STRESS (Fc) SHALL BE 1150 P.S.I. THE MINIMUM ALLOWABLE MODULUS OF ELASTICITY (E) SHALL BE
1,400,000 P.S.I. OTHER FRAMING MATERIAL FOR INTERIOR NON -LOAD BEARING STUDS MAY BE SUBSTITUTED ONLY
UPON APPROVAL OF THE ENGINEER.
2. ALL PRESSURE TREATED (CCA TREATED) DIMENSIONAL FRAMING LUMBER SHALL BE SOUTHERN PINE GRADE NO. 2.
THE MINIMUM ALLOWABLE BENDING STRESS (Fb) SHALL BE 975 PSI. THE MINIMUM ALLOWABLE COMPRESSION
STRESS (Fc) SHALL BE 1450 PSI. THE MINIMUM ALLOWABLE MODULUS OF ELASTICITY (E) SHALL BE 1,600,000 PSI.
3. ALL PRESSURE TREATED (CCA TREATED) SOLID TIMBERS, 6X6 OR LARGER SHALL BE SOUTHERN PINE GRADE NO. 2
(UNLESS OTHERWISE SPECIFIED ON DRAWINGS). THE MINIMUM ALLOWABLE BENDING STRESS (Fb) SHALL BE 850 PSI.
THE MINIMUM ALLOWABLE COMPRESSION STRESS (Fc) SHALL BE 525 PSI. THE MINIMUM ALLOWABLE MODULUS OF
ELASTICITY (E) SHALL BE 1,000,000 PSI.
4. ALL LVUS TO BE PARALLAMS OR MICROLLAMS AS MANUFACTURED BY I LEVEL, OR APPROVED EQUAL. THE
MINIMUM ALLOWABLE BENDING STRESS(Fb) SHALL BE 2,600 P.S.I. THE MINIMUM ALLOWABLE COMPRESSION STRESS
(Fc) PERPENDICULAR TO THE GRAIN SHALL BE 750 P.S.I. THE MINIMUM ALLOWABLE MODULUS OF ELASTICITY (E)
SHALL BE 1,900,000 P.S.I. ALL PARALLAMS EXPOSED TO THE WEATHER SHALL BE PRESSURE TREATED (CCA TREATED).
INSTALL MICROLLAMS AND PARALLAMS IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
5. USE 3/4" TONGUE AND GROOVE STRUCTURAL GRADE FIR PLYWOOD FLOOR SHEATHING, 5/8" EXTERIOR
STRUCTURAL GRADE FIR (C.D.X.) PLYWOOD ROOF SHEATHING, AND 7/16" MINIMUM EXTERIOR STRUCTURAL GRADE FIR
(C.DX.) AT WALLS. ALL JOINTS SHALL BE BLOCKED WITH LUMBER OR OTHER APPROVED SUPPORTS.
6. ALL INTERIOR STUD WALLS TO BE 2X4 MINIMUM @ 16" O.C. UNLESS OTHERWISE NOTED
7. PROVIDE ADEQUATE WALL RESISTANCE TO RACKING BY DIAGONAL CORNER WIND BRACING ANCHORED TO SILL
PLATES. USE DIAGONAL VORX BRACING AT ALL CORNERS SIMPSON 1'/4" WB FASTENED TO EACH STUD, TOP AND
BOTTOM WALL PLATES.
8. PROVIDE SOLID BLOCKING BETWEEN FLOOR JOISTS AND/OR DOUBLE ALL JOISTS UNDER EACH PARTITION.
9. USE FULLY NAILED METAL CONNECTORS (TECO, SIMPSON, OR EQUAL), JOIST, OR BEAM HANGERS WHEN JOISTS
OR BEAMS FRAME INTO OTHER JOISTS OR BEAMS. PROVIDE METAL POST CAPS AND BASES FOR ALL POSTS.
10. FOR ROUGH WINDOW AND DOOR (BOTH INTERIOR AND EXTERIOR) OPENINGS UP TO 3 FEET USE 2x6 HEADER
BEAMS, FROM 3 TO 6 FEET USE 2X8 HEADER BEAMS AND FROM 6 TO 8 FEET, USE 2x10 HEADER BEAMS DOUBLES FOR
2x4 WALLS AND TRIPLES FOR 2x6 WALLS, EXCEPT AS NOTED OTHERWISE ON THE PLANS OR SPECIFICATIONS. IF WUS
ARE SPECIFIED ON PLANS, PROVIDE SOLID 4x4 POST SUPPORTS FOR DOUBLE HEADERS AND SOLID 4x6 OR 6x6 POSTS
FOR TRIPLE HEADERS WITH METAL BASE AND POST CONNECTORS, OR AS OTHERWISE SPECIFIED ON THE PLAN
11. ALL FRAMING TO BE INSTALLED IN ACCORDANCE WITH THE MASSACHUSETTS BUILDING CODE REQUIREMENTS
AND GENERAL FRAMING PRACTICE AS DETAILED IN THE "ARCHITECTURAL GRAPHICS STANDARDS", BY RAMSEY &
SLEEPER.
12. ALL PLYWOOD FLOOR SHEATHING SHALL BE GLUED TO SUPPORTING WOOD FRAMING MEMBERS USING
AMERICAN PLYWOOD ASSOCIATION (A.P.A.) GLUED FLOOR SYSTEM. WOOD GLUE TO BE CONTECH, INC. PL400
SUBFLOOR CONSTRUCTION ADHESIVE, OR APPROVED EQUAL.
13. THE CROSS -WALLS AND TIE BEAMS ARE TO PROVIDE THE LATERAL RESTRAINT FOR THE BUILDINGS AND SHOULD
BE SECURELY ATTACHED AT EACH END AND/OR TO THE EXTERIOR WALLS.
14. BUILT-UP BEAMS (3 PIECES MAXIMUM U.O.N.) USING LVUS AND CONVENTIONAL FRAMING LUMBER SHALL BE FULLY
SPIKED TOGETHER WITH 3-10D NAILS AT 12" O.C. FOUR -PLY BUILT-UP FRAMING AND LVUS ARE TO BE SPIKED
TOGETHER WITH (3) SIMPSON SDS 1/4"X6" SCREWS @ 12" O.C., OR AS OTHERWISE NOTED ON THE DRAWINGS, OR AS
RECOMMENDED BY THE MANUFACTURER. INCREASE NAILING AND BOLTING PATTERNS FOR SIDE LOADED MEMBERS.
15. ALL NAILS, FASTENERS, AND CONNECTORS EXPOSED TO THE WEATHER SHALL BE HOT -DIP GALVANIZED. ALL
SIMPSON CONNECTORS TO BE Z -MAX COATED. IF ACQ OR ACZA WOOD PRESERVATIVE PROTECTIVE TREATMENT IS
USED, THEN IT IS RECOMMENDED THAT ALL FASTENERS BE MADE OF STAINLESS STEEL.
16. ALL I -JOISTS SIZE, INSTALLATION, BLOCKING, RIM JOISTS, WEB OPENINGS, HEADERS, WEB STIFFENERS, ETC. ARE
TO BE DESIGNED BY THE MANUFACTURER. SUBMIT DESIGN AND LAYOUT DRAWINGS FOR REVIEW. TJI DESIGNATIONS
SHOWN ARE ALL JOISTS AS MANUFACTURED BY TRUSS -JOIST MACMILLAN COMPANY. ALTERNATE MANUFACTURERS
MAY BE SUBSTITUTED PROVIDED THEY MEET THE SAME CAPACITIES AND DEFLECTION REQUIREMENTS.
17. ADD ADDITIONAL 1 3/4" LVL BLOCKING BETWEEN JOISTS ADJACENT TO RIM BOARDS UNDER ALL POSTS WITHIN
EXTERIOR OR INTERIOR WALLS.
INDICATES SHEER WALL
SHEER WALLS SHOWN BELOW FLOOR FRAMING
11A„
A
A5
I
1
I
I
-- ---------------------------------------------I
i
a
-2x6 studs spaced at 16" on center with a 6x6 Doug Fir post at each end.
-1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 211 on center around the perimeter of the
shear wall dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide 2x solid blocking (on the flat) at all horizontal piywood
joints nailed at 2" on center (staggered). Provide Sd common nails spaced at 1211 on center elsewhere.
Note: Provide 4x members at all vertical plywood joints.
-Connect the 6x6 posts at either end of the shear wall to the posts below with (2) Simpson HDU2-SDS2.5 holdownsone
located on top of the second floor shoe and one located below the first floor double top plate.
Foundation to second floor
-2x6 studs spaced at 16" on center with a 6x6 Parallam post at each end.
-1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 21' on center around the perimeter of the
shear wall dimensions and all interior joints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 2f1 on center (staggered). Provide 8d common nails spaced at 1211 on center elsewhere.
Note: Provide 4x members at all vertical plywood joints.
-Connect the 6x6 Parallam at either end of the shear wall to
the foundation with a Simpson HDU8-SDS2.5 holdown. The
holdown shall be located on top of the first floor shoe, connected to the 6x6 Parallam with (20) Simpson SDS %4" x 2-112"
screws, and connected to the concrete with a 7/8" diameter anchor bolt epoxied into the concrete a minimum of 16".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
-2x6 studs spaced at 16" on center with a 6x6 Doug Fir post at each end.
-1/2" exterior grade plywood (BOTH FACES) nailed w/8d common nails spaced at 3" on center around the perimeter of
the shear wall dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide 2x solid blocking (on the flat) at all horizontal plywood
joints nailed at 3" on center (staggered). Provide 8d common nails spaced at 12f1 on center elsewhere.
-Connect the 6x6 posts at either end of the shear wall to the posts below with (2) Simpson HDU2-SDS2.5 holdowns-one
located on top of the second floor shoe and one located below the first floor double top plate.
Foundation to second floor
-2x6 studs spaced at 16" on center with a 6x6 Parallam post at each end.
-1/2" exterior grade plywood (BOTH FACES) nailed w/8d common nails spaced at 3" on center around the perimeter of
the shear wall dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 3" on center (staggered). Provide 8d common nails spaced at 1211 on center elsewhere.
-Connect the 6x6 Parallam at either end of the shear wall to the foundation with a Simpson HDU8-SDS2.5 holdown. The
holdown shall be located on top of the first floor shoe, connected to the 6x6 Parallam with (20) Simpson SDS %4" x 2-1/2"
screws, and connected to the concrete with a 7/8" diameter anchor bolt epoxied into the concrete a minimum of 16".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
-2x6 studs spaced at 16" on center with a 6x6 Doug Fir post at each end.
-1/2" exterior grade plywood (BOTH FACES) nailed w/8d common nails spaced at 4" on center around the perimeter of
the shear wall dimensions and all interiorjoints
Note: Plywood to span vertically between floors or provide 2x solid blocking (on the flat) at all horizontal plywood
joints nailed at 4" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
STRUCTURAL BRACKET BELOW
STRUCTURAL BRACKET BELOW
Barn 2nd Flr Framing Plan
Scale:1/411 = V-011
a
I
a
I
IJT I I I I I I
m
J
K
W
w
2
QYQ
K
D
O
J
m
Y
O
J
m
INDICATES SHEER WALL a
SHEER WALLS SHOWN BELOW FLOOR FRAMING
-Connect the 6x6 posts at either end of the shear wall to the posts below with (2) Simpson HDU2-SDS2.5 holdownsone
located on top of the second floor shoe and one located below the first floor double top plate.
Foundation to second floor
-2x6 studs spaced at 16" on center with a 6x6 Parallam post at each end.
112" exterior grade plywood (BOTH FACES) nailed w/8d common nails spaced at 4" on center around the perimeter of
the shear wall dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 411 on center (staggered). Provide 8d common nails spaced at 1211 on center elsewhere.
-Connect the 6x6 Parallam at either end of the shear wall to the foundation with a Simpson HDU8-SDS2.5 holdown. The
holdown shall be to
1"
toted on top of the first floor shoe, connected to the 6x6 Parallam with (20) Simpson SDS /a x 2-1/2"
screws, and connected to the concrete with a 7/8" diameter anchor bolt epoxied into the concrete a minimum of 16".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
-2x6 studs spaced at 16" on center with a 6x6 Doug Fir post at each end.
-1/2" exterior grade plywood (minimum) nailed w/Sd common nails spaced at 2" on center around the perimeter of the
shear wall dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide 2x solid blocking (on the flat) at all horizontal plywood
joints nailed at 2" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
Note: Provide 4x members at all vertical plywood joints.
-Connect the 6x6 posts at either end of the shear wall to the posts below with (2) Simpson HDU2-SDS2.5 holdownsone
located on to of the second floor h Ica
ors shoe and one located below the fir I to late.
P first floor double
PP
Foundation to second floor
-2x6 studs spaced at 16" on center with a 6x6 Parallam post at each end.
-1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 2" on center around the perimeter of the
shear wall dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 2" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
Note: Provide 4x members at all vertical plywood joints.
-Connect the 6x6 Parallam at either end of the shear wall to the foundation with a Simpson HDU5-SDS2.5 holdown. The
holdown shall be located on top of the first floor shoe, connected to the 6x6 Parallam with (14) Simpson SDS Y4" x 2-1/2"
screws, and connected to the concrete with a 7/8" diameter anchor bolt epoxied into the concrete a minimum of 12".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
-1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 3" on center around the perimeter of the
shear wall dimensions and all interior joints. Note: Plywood to span vertically between floors or provide solid
blocking at all horizontal plywood joints nailed at 3" on center (staggered). Provide 8d common nails spaced at
12" on center elsewhere.
-Connect the 2-2x6 studs at either end of the shear wail to the foundation with a Simpson HDU5-SDS2.5 holdown. The
holdown shall be located on top of the foundation shoe, connected to the 2-2x6 studs with (14) Simpson SDS '%" x 2-1/2"
screws, and connected to the concrete with a 5/8" diameter anchor bolt epoxied into the concrete a minimum of 8".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
1AF.11 110V1
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
Barn Roof Framing Plan / 2
Scale:1/4" = 11-011
-1/2" exterior grade plywood nailed w/8d common nails spaced at 3" on center around the perimeter of the shear wall
dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide 2x solid blocking (on the flat) at all horizontal plywood
joints nailed at 3" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
-Connect the 6x6 posts at either end of the shear wall to the posts below with (2) Simpson HDU2-SDS2.5 holdowns-one
located on top of the second floor shoe and one located below the first floor double top plate.
Foundation to second floor
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
-1/2" exterior grade plywood nailed w/8d common nails spaced at 3" on center around the perimeter of the shear wall
dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 311 on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
-Connect the 6x6 Parallam at either end of the shear wall to the foundation with a Simpson HDU5-SDS2.5 holdown. The
holdown shall be located on top of the first floor shoe, connected to the 2-2x6 studs with (14) Simpson SDS %4" x 2-1/2"
screws, and connected to the concrete with a 5/8" diameter anchor bolt epoxied into the concrete a minimum of 12".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
-1/2" exterior grade plywood nailed w/8d common nails spaced at 4" on center around the perimeter of the shear wall
dimensions and all interiorjoints.
Note: Plywood d to span vertically rt call between floors
5n^' or provide P Y p de 2x solid blocking (on the flat) at all horizontal plywood
joints nailed at 41' on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
-Connect the 2-2x6 studs at either end of the shear wall to the LVLS below with (2) Simpson HDU2-SDS2.5 holdownsone
located on top of the second floor shoe and one located on the side of the LVLs.
Foundation to second floor
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
-1/2" exterior grade plywood nailed w/8d common nails spaced at 4" on center around the perimeter of the shear wall
dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 4" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
-Connect the 6x6 Parallam at either end of the shear wall to the foundation with a Simpson HDU5-SDS2.5 holdown. The
holdown shall be located on top of the first floor shoe, connected to the 2-2x6 studs with (14) Simpson SDS %d' x 2-1/2"
screws, and connected to the concrete with a 7/8" diameter anchor bolt epoxied into the concrete a minimum of 12".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
REVISIONS
DETAILS ADDED P. 10 &
11 & VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain property of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
Without specific written
authorization by Campbell
Smith Architects Inc.
C CAMPBELL SMITH
ARCHITECTS LLC
Campbell I Smith
A R C H IT E C T S
PO Box 1450
22 Depot Street
Duxbury, MA 02331
781-934-7181
PROJECT:
Sullivan
Residence
BUILDER
LOCATION:
202 Pleasant a t St
South Yarmouth
MA
FramingPlans
Sheerwall Notes
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
Mix
4of7
G
al
�r
0
N
U
z
o:
M
4J
0
H
u
ro
O
co
s~
ro
.11
m
-P
U
O
�n
0
u
a,
0
E
ro
C
m
a
o
V)
41
U
-n
0
u
oa
H
H
I
ro
U
N
-W
I~
m
U
0
0
u
N
C4
O
O
.rA
s4
IQ
U
m
S4
v
rn
I I I
2X85 � 16' O.C.
I
I
BUILT
OUT
RAKE
I
IiHEE WA L'C'
SHE
L"C"
I I
I
WA
9.
I
I ,-
I;
I
I (3) 1�^' x 14" LVLS
2X12 CEILIN JOISTS � 16
o
a
I
i> O.C. W/ (10) 110d COMMON
N
x
I
I
I
x OR 12d BOX NAILS EA. END
a
-
M
I
I
I
x
N
X105 Q 16" O.C.
'
HHUS
48 FACE MOUNT
n II II
I
HANGER
(2 PLACES)
HHUS 7.25/10 FACE
MOUNT
I
tya'
x 14" LVL
RIDGE
BEAM
HANGER (2 PLACES)
-
2X105 d 16" O.C.
I
; '
I
a
HGU
5.50
(H, �
11) FACE
x
MOUNT
HANGER
(BOTH
ENDS)
(3)1�^�
x
14"
x
I
�-
-
a
X
-
I
w 7
SHE
WA
L "D
HE .
WAL
"D"
I
I
BUILT OUT RAKE
2X85
I I I
I
-Connect the 6x6 posts at either end of the shear wall to the posts below with (2) Simpson HDU2-SDS2.5 holdownsone
located on top of the second floor shoe and one located below the first floor double top plate.
Foundation to second floor
-2x6 studs spaced at 16" on center with a 6x6 Parallam post at each end.
112" exterior grade plywood (BOTH FACES) nailed w/8d common nails spaced at 4" on center around the perimeter of
the shear wall dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 411 on center (staggered). Provide 8d common nails spaced at 1211 on center elsewhere.
-Connect the 6x6 Parallam at either end of the shear wall to the foundation with a Simpson HDU8-SDS2.5 holdown. The
holdown shall be to
1"
toted on top of the first floor shoe, connected to the 6x6 Parallam with (20) Simpson SDS /a x 2-1/2"
screws, and connected to the concrete with a 7/8" diameter anchor bolt epoxied into the concrete a minimum of 16".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
-2x6 studs spaced at 16" on center with a 6x6 Doug Fir post at each end.
-1/2" exterior grade plywood (minimum) nailed w/Sd common nails spaced at 2" on center around the perimeter of the
shear wall dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide 2x solid blocking (on the flat) at all horizontal plywood
joints nailed at 2" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
Note: Provide 4x members at all vertical plywood joints.
-Connect the 6x6 posts at either end of the shear wall to the posts below with (2) Simpson HDU2-SDS2.5 holdownsone
located on to of the second floor h Ica
ors shoe and one located below the fir I to late.
P first floor double
PP
Foundation to second floor
-2x6 studs spaced at 16" on center with a 6x6 Parallam post at each end.
-1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 2" on center around the perimeter of the
shear wall dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 2" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
Note: Provide 4x members at all vertical plywood joints.
-Connect the 6x6 Parallam at either end of the shear wall to the foundation with a Simpson HDU5-SDS2.5 holdown. The
holdown shall be located on top of the first floor shoe, connected to the 6x6 Parallam with (14) Simpson SDS Y4" x 2-1/2"
screws, and connected to the concrete with a 7/8" diameter anchor bolt epoxied into the concrete a minimum of 12".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
-1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 3" on center around the perimeter of the
shear wall dimensions and all interior joints. Note: Plywood to span vertically between floors or provide solid
blocking at all horizontal plywood joints nailed at 3" on center (staggered). Provide 8d common nails spaced at
12" on center elsewhere.
-Connect the 2-2x6 studs at either end of the shear wail to the foundation with a Simpson HDU5-SDS2.5 holdown. The
holdown shall be located on top of the foundation shoe, connected to the 2-2x6 studs with (14) Simpson SDS '%" x 2-1/2"
screws, and connected to the concrete with a 5/8" diameter anchor bolt epoxied into the concrete a minimum of 8".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
1AF.11 110V1
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
Barn Roof Framing Plan / 2
Scale:1/4" = 11-011
-1/2" exterior grade plywood nailed w/8d common nails spaced at 3" on center around the perimeter of the shear wall
dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide 2x solid blocking (on the flat) at all horizontal plywood
joints nailed at 3" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
-Connect the 6x6 posts at either end of the shear wall to the posts below with (2) Simpson HDU2-SDS2.5 holdowns-one
located on top of the second floor shoe and one located below the first floor double top plate.
Foundation to second floor
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
-1/2" exterior grade plywood nailed w/8d common nails spaced at 3" on center around the perimeter of the shear wall
dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 311 on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
-Connect the 6x6 Parallam at either end of the shear wall to the foundation with a Simpson HDU5-SDS2.5 holdown. The
holdown shall be located on top of the first floor shoe, connected to the 2-2x6 studs with (14) Simpson SDS %4" x 2-1/2"
screws, and connected to the concrete with a 5/8" diameter anchor bolt epoxied into the concrete a minimum of 12".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
-1/2" exterior grade plywood nailed w/8d common nails spaced at 4" on center around the perimeter of the shear wall
dimensions and all interiorjoints.
Note: Plywood d to span vertically rt call between floors
5n^' or provide P Y p de 2x solid blocking (on the flat) at all horizontal plywood
joints nailed at 41' on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
-Connect the 2-2x6 studs at either end of the shear wall to the LVLS below with (2) Simpson HDU2-SDS2.5 holdownsone
located on top of the second floor shoe and one located on the side of the LVLs.
Foundation to second floor
-2x6 studs spaced at 16" on center with 2-2x6 studs at each end.
-1/2" exterior grade plywood nailed w/8d common nails spaced at 4" on center around the perimeter of the shear wall
dimensions and all interiorjoints.
Note: Plywood to span vertically between floors or provide solid blocking at all horizontal plywood joints nailed
at 4" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere.
-Connect the 6x6 Parallam at either end of the shear wall to the foundation with a Simpson HDU5-SDS2.5 holdown. The
holdown shall be located on top of the first floor shoe, connected to the 2-2x6 studs with (14) Simpson SDS %d' x 2-1/2"
screws, and connected to the concrete with a 7/8" diameter anchor bolt epoxied into the concrete a minimum of 12".
Provide solid blocking between the underside of the first floor and the top of the foundation wall at both hold down
locations.
REVISIONS
DETAILS ADDED P. 10 &
11 & VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain property of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
Without specific written
authorization by Campbell
Smith Architects Inc.
C CAMPBELL SMITH
ARCHITECTS LLC
Campbell I Smith
A R C H IT E C T S
PO Box 1450
22 Depot Street
Duxbury, MA 02331
781-934-7181
PROJECT:
Sullivan
Residence
BUILDER
LOCATION:
202 Pleasant a t St
South Yarmouth
MA
FramingPlans
Sheerwall Notes
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
Mix
4of7
G
al
�r
0
N
U
z
o:
M
4J
0
H
u
ro
O
co
s~
ro
.11
m
-P
U
O
�n
0
u
a,
0
E
ro
C
m
a
o
V)
41
U
-n
0
u
oa
H
H
I
ro
U
N
-W
I~
m
U
0
0
u
N
C4
O
O
.rA
s4
IQ
U
m
S4
v
rn
Cable Rake
Scale:3" = 1'-0"
Gable Return // �2
Scale:3" = 1'-0"
Exterior Door Schedule
Door #
Position
Panel W x H
Layout (NTS)
Plan View (NTS)
Unit Area
...
Notes
8101
Exterior
10'-0"x12'-0"
5
2'-7 1/4"x2'-11 1/4"
1
2 Lite
= = ==m-
120.00
2 LEAF INTERIOR ROLLING
B102
Exterior
91-011
❑
81.00
❑
B103
Exterior
9'-0"x9'-0"
3
2'-91/4"x3'-11 1/4"
Andersen
81.00
ACW21040
❑❑
10.91
B104
Exterior
9'-0"x9'-0"
®j
Interior
2'-6"x6'-8"
81.00
32.73 sq ft
BM
4
B105
Exterior
10'-0"x12'-0"
]
CADH1850
.31
120.00
Interior
2 LEAF INTERIOR ROLLING
8106
Exterior
21-6"0'-0"
31.68 sq ft
17.50
BN
20 Min. Fire Door
B201
Exterior
3'-21/8"x8'-0"
Iwll
hI �Ij
�
� n
25.42
0.31
1:3
B202
Exterior
3'-21/8"x8'-0"
2
25.42
0.31
FIXED
27.36 sq ft
B207
8203
Exterior
3'-21/8"x8'-0"
Andersen
2 Lite
r
25.42
0.31
ACW2828
9
6.78
r
B208
Interior
5'-0"x6'-8"
Interior Door Scedule
Door #
Position
Panel W X H
Layout (...
Plan View (NTS)
Notes
B111
Interior
2'-6"x6'-8'
Note/Remarks
BK
5
2'-7 1/4"x2'-11 1/4"
20 Min. Fire Door Mech. Rm. Under Stair
2 Lite
ACW2830
.29
7.65
5
8112
Interior
2'-6"x6'-8"
3
2'-91/4"x3'-11 1/4"
Andersen
20 Min. Fire Door
ACW21040
.29
10.91
TO MATCH ELIPTICAL WINDOW ...
3
8204
Interior
2'-6"x6'-8"
32.73 sq ft
BM
4
1'-7 1/4"x4'-11 1/4"
Andersen
1/1
]
CADH1850
.31
8205
Interior
2' -6"x6' -8"R13
4
31.68 sq ft
BN
2
2'-91/4"x4'-111/4"
Andersen
2/1
B206
Interior
2'-611x6'-8"
.31
1:3
60% COTTAGE SASH
2
®I
3
27.36 sq ft
B207
Interior
2' -6"x6' -6-
2'-7 1/4"x2'-7 1/4"
Andersen
2 Lite
r
ACW2828
.29
6.78
r
B208
Interior
5'-0"x6'-8"
®®,\r
6.78 sq ft
CupolaX1
4
2'-6"x2'-4"
Custom
4 It Single...
8
Sash 3028
5.83
12
10 (PITCH VARIES)
BLOCKING EA. RAFTER BAY WITHIN 2" OF UNDERSIDE
OF PLYWOOD
IMPSON H2.5 RAFTER TIE EA. RAFTER (TYR)
NOTE: NO SOFFIT VENTING
FIBERGLA S GUTTER
NOTE: OFFS FASCIA
i
3112"
* NOTE -ADJUST SOFFIT DIMENSION TO
ACCOUNT FOR VARIOUS ROOF PITCH
21/4' BED MLDG.
6/4 x 10 FLAT STOCK
FLASH
3/4"X1 " SCOTIA
6/4 x 4 FLAT STOCK
Cornice Profile 10 Pitch
Scale:3" = 1'-0"
Window Schedule
ID
Qty.
W x H Size
Manufacturer
Grill
Layout
Call #
U-va...
Area per...
Note/Remarks
BK
5
2'-7 1/4"x2'-11 1/4"
Andersen
2 Lite
ACW2830
.29
7.65
5
38.25 sq ft
BL
3
2'-91/4"x3'-11 1/4"
Andersen
9 Lite
ACW21040
.29
10.91
TO MATCH ELIPTICAL WINDOW ...
3
32.73 sq ft
BM
4
1'-7 1/4"x4'-11 1/4"
Andersen
1/1
]
CADH1850
.31
7.92
60% COTTAGE SASH, LITES TO M...
4
31.68 sq ft
BN
2
2'-91/4"x4'-111/4"
Andersen
2/1
CADH21050
.31
13.68
60% COTTAGE SASH
2
27.36 sq ft
BO
1
2'-7 1/4"x2'-7 1/4"
Andersen
2 Lite
r
ACW2828
.29
6.78
1
6.78 sq ft
CupolaX1
4
2'-6"x2'-4"
Custom
4 It Single...
ISI
Sash 3028
5.83
4
23.32 sq ft
19
160.12 sq ft
NOTE: TWO LETTER WINDOW DESIGNATION INDICATES LOCATION "H" = HOUSE "B" = BARN
NOTE: PROTECTED OPENINGS TO BE PROVIDED BY PLYWOOD
PANELS WITH ATTACHMENT SYSTEM UNLESS OTHERWISE NOTED
IN SCHEDULE
BOTTOM OF COLLAR TIE
12
10.25' R 38 FIBERGLASS BATT INSULATION 10
TO OUTSIDE FACE OF WALL BELOW
RED CEDAR SHINGLES ON CEDAR BREATHER
5/8" COX PLYWOOD SHEATHING
2X10 RAFTERS SEE FRAMING PLANS
SOLID BLOCKING TO WITHIN 2" OF 1
UNDERSIDE OF PLYWOOD Al
SIMPSON CONNECTOR H2.5 ea. JOIST (TYR)
TOP OF WALL
FIBERGLASS GUTTER W/ OFFSET FASCIA
OTE: NO SOFFIT VENTWG
WHITE CEDAR SHINGLES ON TYVEK OR EQ. (IYP.) (SEE
ELEVATIONS)
a 1/2" COX PLYWOOD SHEATHING (TYR)
2X6 STUD WALL 16' O.C. (TYR)
5"2' FIBERGLASS BATT INS. R 21 OYP.)
SECOND FLOOR 1/2" BLUE BOARD WITH SMOTH PLASTER SKIMCOAT (TYP.)
3/4" T&G "ADVANTECH" SUB FUR. OR EQ. GLUED AND `
SCREW -NAILED TO JOISTS (TYR) /
9 I JOISTS SEE FRAMING PLANS (TYR)
ONE LAYER 5/8' TYPE X GWB ON 1X3
STRAPPING 0 16' O.C. (rYP.)
10.25" R 38 FIBERGLASS BATT INSULATION
TO OUTSIDE FACE OF WALL BELO
WHITE CEDAR SHINGLES ON TYVEK OR EQ. (TYR)
(SEE ELEVATIONS]
1/2" COX PLYWOOD SHEATHING (TYR.
2X6 STUD WALL 16" O.C. (TYR)
51/2' FIBERGLASS BATT INS. R 21 ITYR}
ONE LAYER 5/8" TYPE X GWB (TYP.L
4' SLAB ON 6 MIL. POLY VAPOR BARRIER ON 6" WELL
COMPACTED GRAVEL W/10/10 6X6 W.W.M. (TYR)
(2) 2X6 P.T. SILL PLATE ON SILL SEAL (TYR).
5/8" dia. "J' BOLT 8" EMBED 32' O.C., max. V-0" FROM \
_ CORNERS WITH 1/4" x 3°x 3" PLATE ®EA. BOLT (TYR�
TOP OF SLAB
10" CONCRETE FOUNDATION WALL ON 10" THICK X
20"WIDE CONC. FOOTING W/ 31/2' KEY MIN. 4'-0" BELOW
FIN. GRADE (TYR)
z
N
BOTTOM OF FOOTINGIL _-_- _-_---_-., T_ ---L
i�
Barn Typical Wall Section 4
Scale:1/2" = V-0" A5
REVISIONS
DETAILS ADDED P. 10 &
11 & VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain property of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
without specific written
authorization by Campbell
Smith Architects Inc.
PC CAMPBELL
SMITH
RCHITECTS LLC
Campbell Smith
A R C H I T E C T S
PO Box 1450
22 Depot Street
Duxbury, MA 02331
781-934-7181
PROJECT:
Sullivan
Residence
BUILDER
LOCATION:
202 Pleasant St
South Yarmouth
MA
Typ- Wall Section,
Section Details &
Schedules
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
5of7
I
II
I FIN.SIDING
SII SHEATHING
i
5/6 STOCK RIPPED AS
SHOWN
II II
45.0°.
I
I ,
1'
/
Water Table 2
Scale:6"
1 r-0" A6
WINDOW
Window Cap & Crown 3
Scale:6"
= 1'-0" A6
Hood & Bracket (�-4
Scale:11/2"= V-0"
POST FOR WEATHER VANE
FIN. ROOF
— ICE & WATER SHEILD OR EQ.
1/2" CDX PLYWOOD
2x8 RAFTER @ 16" O.C.
EXPANDING FOAM INSULATION
1X BEADBOARD UNDERSIDE OF RAFTERS & INT.
2X LUMBER RIPPED DOWN FOR BLOCKING
SIMPSON STRONG TIE H4 EA. RAFTER
2x10 SILL RIPPED AS SHOWN
SCOTIA
2X4 FRAME
EXPANDING FOAM INSULATION
2x4 BLOCKING "ON THE FLAT"
1/2" THICK FLAT STOCK
DRILL BASE PLATE FOR 10" LAG BOLT
BOLTS@ 16" O.C. ALL 4 SIDES
LEAD FLASHING
ROOF SHINGLES
(3) 2X12
2X10 RAFTERS
Cupola Sec./Elev.
Scale:11/2"= V-0"
REVISIONS
DETAILS ADDED P. 10 &
11 & VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain property of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
without specific written
authorization by Campbell
Smith Architects Inc.
c CAMPBELL SMITH
RCHITECTS LLC
Campbell Smith
A R C H IT E C T S
PO Box 1450
22 Depot Street
Duxbury, MA 02331
781-934-7181
www.campbelismitharchitects.com
PROJECT:
Sullivan
Residence
BUILDER
LOCATION:
202 Pleasant St
South Yarmouth
MA
Details 1 1/2"
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
PAGE
AG
6of7
'RUCTURAL
--SIGN LOADS ASSUMED ON DRAWINGS:
OOR / LIVING SPACE: 40 P.S.F. LIVE/ 10 P.S.F. DEAD
OOR / SLEEPING SPACE 30 P.S.F. LIVE / 10 P.S.F. DEAD
71C FLOOR (LIMITED STORAGE) 20 P.S.F. LIVE / 10 P.S.F. DEAD
=CKS & BALCONIES 60 P.S.F. LIVE / 10 P.S.F DEAD
)OF 35 P.S.F. LIVE/ 10 P.S.F DEAD
)IL BEARING CAPACITY ASSUMED TO BE MINIMUM 1.5 TONS/SQ.FT.
.LOWABLE DEFLECTION LIVE LOADS — FLOOR JOISTS U480
91=11101000 JIFAW
THE SOIL BEARING VALUE HAS BEEN ASSUMED AT 1.5 TONS P.S.F. THE CONTRACTOR SHALL VERIFY THIS VALUE AT
THE TIME OF EXCAVATION AND SHALL NOTIFY THE ARCHITECT THAT IT IS READY FOR INSPECTION OR FOR REVISION
IF UNCERTAIN CONDITIONS ARE FOUND TO EXIST.
ALL CONCRETE WORK SHALL CONFORM TO THE AMERICAN CONCRETE INSTITUTE'S "GUIDE TO RESIDENTIAL CAST—IN
PLACE CONCRETE CONSTRUCTION" REPORT OF COMMITTEE 332.
OTHER CONCRETE STANDARDS AS REQUIRED BY THE BUILDING CODE SUCH AS ACI 318-95,318.1-89
SHALL APPLY THE CONSTRUCTION OF THIS RESIDENCE FOUNDATION.
REINFORCING STEEL SHALL CONFORM TO ASTM A616, GRADE 60, AND WELDED WIRE
FABRIC SHALL MEET ASTM A185 SPECIFICATIONS
FOOTING CENTER LINES SHALL BE CENTERED UNDER THE CENTER LINE OF COLUMNS
DETAILING, FABRICATION AND PLACEMENT OF ALL REBAR SHALL CONFORM TO ACI 315-80, SP66 MANUAL
IF WATER OCCURS WITHIN THE EXCAVATION, IT SHALL BE DEWATERED BEFORE PLACING OF CONCRETE.
DEWATERING WILL BE DONE IN A MATTER THAT WILL PREVENT THE FLOW OF FINE GRAIN SOIL.
THE BOTTOM OF ALL EXCAVATIONS FOR FOOTINGS SHALL BE TAMPED TO DISPOSE OF ALL LOOSE MATERIAL
BEFORE THE CONCRETE IS PLACED. COMPACTION SHOULD NOT EXCEED THE NATURAL DENSITY OF THE SOIL.
ALL CONCRETE FORM WORK SHALL BE PROPERLY CONSTRUCTED AND WELL BRACED TO PRODUCE PLUMB,
STRAIGHT LEVEL AND TRUE SURFACES, BOWED PILLOWED AND IRREGULAR WALL SURFACES WILL NOT BE
ACCEPTED AND MAY REQUIRE REMOVAL AND RECONSTRUCTION BY THE FORM CONTRACTOR AT HIS EXPESE
IF DIRECTED BY THE ARCHITECT AND OWNER.
THE FOUNDATION WALLS SHALL NOT BE BACKFILLED UNTIL THE FIRST FLOOR DECK IS IN PLACE TO BRACE WALL.
DAMAGED WALLS WILL BE REPLACED AT THE CONTRACTORS EXPENSE IF BACKFILLING IS DONE WITHOUT
BACKFILLING IN PLACE.
STRUCTURAL STEEL SHALL BE ASTM A36 OR ASTM A592 AND SHALL BE PAINTED ONE SHOP COAT OF METAL PRIMER.
BOLTS SHALL BE ASTM A325, ANCHOR BOLTS SHALL BE ASTM F1554.
"LALLY" COLUMNS SHALL BE SCHEDULE 40 PIPE ASTM A53 GRADE B 3 1/2" DIAMETER OR STEEL TUBES 3"X3"X1/4".
PAINT ONE SHOP COAT METAL PRIMER - 2 MILS THICK UNLESS OTHERWISE NOTED.
"MICROLLAM" AND OTHER ENGINEERED LUMBER SHALL BE AS MANUFACTURED BY TUSJOIST CORP., BOISE CASCADE,
GEORGIA PACIFIC OR OTHER APPROVED MANUFACTURER. METAL FASTENERS FOR WOOD MEMBERS SHALL BE AS
MANUFACTURED BY THE SIMPSON CO."STRONG TIE" OR EQUALL APPROVED BY THE ARCHITECT.
UNLESS OTHERWISE NOTED PROVIDE A 2" NOMINAL P.T. WOOD SILL OF APPROPRIATE WIDTH BOLTED TO THE TOP
FLANGE OF ALL STEEL BEAMS WITH 3/8" DIA. BOLTS STAGGERED AT 2'-0" O.C. RIGIDLY CONNECTING RAFTERS AND
JOISTS.
OTINGS - 24"X12" CONTINUOUS WITH 3 1/2' CONT. KEYWAY ALONG CENTERLINE OR AS NOTED STEP FOOTINGS TO
BE MIN. 1 VERTICAL ON 3 HORIZONTAL.
kLLS - MINIMUM 8" BETWEEN FINISH GRADE AND TOP OF FOUNDATION WALL.
FINISH GRADE TO SLOPE AWAY FROM FOUNDATION.
- 10" THICK CONCRETE.
3000 P.S.I. (28 DAY STRENGTH) W/ 3/4' AGGREGATE.
SEMENT SLAB - 3000 P.S.I. (28 DAY STRENGTH) ON MIN. 6" SAND OR GRAVEL FILL W/ 6X6 -W1.4 WELDED WIRE FABRIC.
RAGE SLAB - 3500 P.S.I. (28 DAY STRENGTH) ON MIN. 6" SAND OR GRAVEL FILL W/ 6X6 -W1.4 WELDED WIRE FABRIC.
FOOTINGS SHALL BE PLACED ON UNDISTURBED OR ENGINEERED FILL TO A DEPTH REQUIRED BY LOCAL
BUILDING CODES AND FROST CONDITIONS OR DEEPER IF SHOWN.
REINFORCED WALLS SHALL SUPPORT A MAXIMUM OF 7'-0" UNBALANCED FILL.
MP -PROOFING (BASEMENTS) - TWO COATS ASPHALTIC COATING COMPOUND MINIMUM, UNLESS OTHERWISE NOTED.
,TERPROOFING (HABITABLE SPACES BELOW GRADE) - TWO PLY HOT MOPED FELT MEMBRANE
,TERPROOFING. (U.O.N.)
UNDATION DRAIN INSTALL A 6" PERFORATED DRAIN TILE AT THE PERIMETER OF BASEMENT. TOPS OF JOINTS TO BE
VERED W/ 15# FELT AND A MINIMUM OF 18" STONE OR GRAVEL SLOPE TILE 3/16" PER FT. TO POINT OF DISCHARGE.
TERMITE PROTECTION — AS PER LOCAL CODES
ANCHOR BOLTS — 1/2" X 12" ANCHOR BOLTS @ 4'-0" O.C. MAX. 12" FROM CORNERS & 7" EMBED
JOIST HANGERS — STANDARD 18 GUAGE METAL.
SPECIAL FOUNDATIONS AND FOOTINGS AS SHOWN.
BASEMENT CELING TO COMPLY WITH MASS. CMR 501.3 FLOOR FIRE PROTECTION
FLOOR ASSEMBLIES NOT USING DIMENSIONAL LUMBER TO HAVE 1/2" GYPSUM WALLBOARD OR OTHER APPROVED
ASSEMBLIES
MINIMUM STAIR TREAD IS 911, MAXIMUM RISER IS 8 1/411
MINIMUM STAIR WIDTH IS 36" CLEAR
ALL HAND RAILS AND GUARD RAILS SHALL CONFORM TO 2009 IRC & MASS STATE BUILDING CODE
MAIN ENTRANCE DOOR SHALL BE A MINIMUM 36" WIDE
ALL EGRESS DOORS SHALL BEA MINIMUM 6-8" HIGH
FIRE PROTECTION SYSTEMS SHALL BE IN ACCORDANCE WITH THE 2009 IRC & MASS STATE BUILDING CODE
PROVIDE MIN 48" WIDE BY 42" DEEP LEVEL PLATFORM (LANDING) AT THE EXTERIOR OF
ALL EXIT DOORS. IN ADDITION TO DOORS AND ACCESS PANELS SHOWN ON DRAWINGS PROVIDE ATTIC ACCESS
PANELS TO ALL ATTIC AREAS WITH GREATER THAN 36" CLEAR HEIGHT. (MIN. ACCESS PANEL 22" X 301r)
FRAMING LUMBER
STUDS — NO. 3 OR STANDARD "STUD" GRADE.
JOISTS AND RAFTERS — E = 1,400,000 P.S.I. / FB = 875 P.S.I.
BEAMS AND GIRTS E = 1,200,000 P.S.I. / FB = 850 P.S.I.
STAIR STRINGERS NO. 1 GRADE.
UNLESS OTHERWISE NOTED PROVIDE:
A) DOUBLE HEADER JOISTS & TRIMMERS @ ALL FLOOR OPENINGS.
B) DOUBLE JOISTS UNDER ALL PARALLEL PARTITIONS.
C) FULL BLOCKING IN EACH JOIST BAY AT MID—SPAN FOR SPANS EXCEEDING 10'-011
.
FLOOR FRAMING
GENERAL FLOORS 3/4" T&G PLYWOOD GLUED TO JOISTS (C -D INT. APA W/ EXT. GLUE) OR APPROVED
EQUAL BATH & TOILET AREAS - USE WATER RESISTANT PLYWOOD (UNDERLAYMENT C -C PLUGGED EXT. APA)
OR'CEMENT BOARD' OVER SUBFLOOR.
EXTERIOR SHEATHING
WALLS - 1/2" EXT. PLYWOOD (C -D 24/0 INT APA W/ EXT. GLUE)
ROOF - 5/8" EXT. PLYWOOD(C-D 24/0 INT APA W/ EXT. GLUE)
INTERIOR FINISH
INTERIOR FINISHES SHALL BE IN ACCORDANCE WITH THE FLAME SPREAD AND SMOKE DEVELOPMENT
REQUIREMENTS OF THE 2009 IRC AND MASS. STATE BUILDING CODE
GENERAL - UNLESS OTHERWISE INDICATED, ALL INTERIOR WALLS AND CEILINGS TO BE COVERED
WITH 1/2" BLUE -BOARD WITH A SMOOTH FINISH VENEER PLASTER SYSTEM.
MISCELLANEOUS
UNLESS OTHERWISE NOTED, PROVIDE:
INSULATION TO COMPLY WITH 2012 IECC OR LOCAL CODES
R-21 IN ALL EXTERIOR WALLS (2X6 CONSTRUCTION)
R-30 IN FLOORS OVER UNHEATED SPACES
R-49 IN ALL CEILINGS OR R-38 WHERE INSULATION EXTENDS OVER TOP OF WALL
R-10 UNDER SLABS ON GRADE, 48" IN FROM OR 48" DOWN FROM INSIDE FACE OF FROST
WALL TO ISOLATE SLAB FROM EXTERIOR AND CONCRE WALL
R-15/19 BASEMENT WALLS R-15 CONT. ON INT. OR EXT. OF WALL OR R-19 INT. CAVITY INS.
VAPOR BARRIER -INSTALL A 4 MIL. POLYETHYLENE VAPOR BARRIER ON THE WARM SIDE OF ALL INSULATION.
DOUBLE INSULATING GLASS AT ALL GLASS AREAS AND TEMPERED GLASS AT ALL OPERABLE GLASS DOORS AND
ALL WINDOWS WITH GLASS AREAS LESS THAN 18" ABOVE FIN. FLOOR OR ANY PLATFORM. AND ANY TUB OR
SHOWER AREAS. (SEE 2009 IRC & MASS STATE BUILDING CODE FOR SAFETY GLAZING)
U.O.N. BAFFLE VENTS SHALL BE INSTALLED IN ALL RAFTER BAYS AS PER MANUFACTURER'S DETAIL
TO PROVIDE FREE AIR FLOW FOR ATTIC VENTILATION. IT SHALL BE CONTINUOS IN ALL SLOPING CEILINGS
AND A MIN. OF ONE LENGHT (48") AT ALL SOFFIT VENTS.
ALL BATHROOMS SHALL BE PROVIDED WITH MECHANICAL VENTILATION IN ACCORDANCE WITH 2009 IRC & MASS STATE
BUILDING CODE
EXTERIOR GRADE SHALL SLOPE 1/2" PER FOOT FROM BUILDING FORA MINIMUM OF 6-0" AWAY
ALL EXPOSED INSULATION MATERIALS INCLUDING FACINGS, VAPOR BARRIERS OR BREATHER PAPERS SHALL
CONFORM TO THE FLAME SPREAD, SMOKE DEVELOPMENT AND CRITICAL RADIANT FLUX
REQUIREMENTS OF THE 2009 IRC & MASS. STATE BUILDING CODE
GARAGE AND BOILER AREAS - ONE LAYER 5/8" FIRE CODE G.W.B. @ FURNACE LOCATION AND CEILING AND
WALLS BETWEEN GARAGE AND LIVING AREAS
GENERAL FLASHING SHALL BE LEAD OR LEAD COATED COPPER, UNLESS OTHERWISE NOTED.
ROOF FLASHING SHALL LEAD OR LEAD COATED COPPER AND USED WHEREVER FLASHING WILL
BE EXPOSED SUCH AS AT VALLEYS. SIDEWALLS, CAP AND BASE ETC. CHIMNEY CAP AND BASE FLASHING SHALL BE 3 LBS.
HARD LEAD. VENT AND PIPE FLASHINGS SHALL BE PERFORMED NEOPRENE AS MANUFACTURED BY
DUPONT, DOW CHEMICAL OR EQUAL. FLASHING SHALL CONSISIT OF FABR ICATED FLANGE AND CAP
FLASHING. STEP FLASHING: BASE FLASHING SHALL EXTEND ONTO ROOF AND UP THE SURFACE OF THE
ADJOINING CONSTRUCTION A MINIMUM OF 4". THE UPPER EDGE OF THE BASE FLASHING SHALL EXTEND A
MINIMUM OF 2" ABOVE THE NEXT COURSE OF SHINGLES AND THE LOWER EDGE SHALL BE 1/2" ABOVE THE
BUTTS OF THE SHINGLE COVERING IT, PROVIDING A MINIMUM OF 1 1/2" OVERLAP OF FLASHING COURSES.
CAP FLASHING SHALL EXTEND DOWN OVER BASE FLASHING A MINIMUM OF 4". THE STEPS IN CAP FLASHING SHOULD NOT
EXCEED 8" AND LAPS SHALL BE A MINIMUM OF 3".ALL SEAMS SHALL OVERLAP IN DIRECTION OF FLOW.
PROVIDE ICE AND WATER SHIELD (W.R. GRACE "BITUTHENE" OR EQUAL) MINIMUM OF 48" UP FROM DRIP
EDGE OF ALL ROOFS, 36'" UP EACH SIDE OF ALL VALLEYS, AND AT ALL ROOF/WALL INTERSECTIONS AND ROOFS LESS THAN
4 IN 12 PITCH.
REVISIONS
DETAILS ADDED P. 10 &
11 & VARIOUS DETAIL
MARKERS, WINDOWS
ADDED TO SCHEDULE
08-25-216 WINDOW
SCHEDULE REVISED
FOR ANDERSEN
WINDOWS
OWNERSHIP AND USE
OF DOCUMENTS
Drawings and specifications
are instruments of
professional service and shall
remain property of the
architect. These documents
are not to be used in whole
or part for any other projects
or purposes, or by any other
parties than those properly
authorized by contract
without specific written
authorization by Campbell
Smith Architects Inc.
c CAMPBELL SMITH
RCHITECTS LLC
J
Campbell Smith
A R C H I T E C T S
PO Box 1450
22 Depot Street
Duxbury, MA 02331
781-934-7181
PROJECT:
Sullivan
Residence
BUILDER
LOCATION:
202 Pleasant St
South Yarmouth
MA
Specifications
ISSUE DATE
08-03-2016
THIS SETPRINTED ON:
9/26/16
SEE ISSUE DATE AND
REVISIONS ABOVE
SCALE:
AS NOTED
DRAWN BY:
CBD
7of7
C
r-,
a
c
0
0
N
U
z
x
m
0
F
ro
0
U)
s~
ro
-P
U
�n
O
�,
w
0
ro
r
rd
rd
va
U)
+J
U
N
•n
0
P
C14
-P
r-,
ro
U
4J
I~
U
0
0
u
0
0.
0
4J
�,
U
N
N