Loading...
HomeMy WebLinkAboutEngineered Plan - 19984" SCHEDULE 40 PVC PIPE MIN. PITCH 1/8' PER FT.. CLEAN SAND /"A-.�L 2" LAYER OF 1/8--, TO 1/2"' WASHED STONE Z m VENT 1 CU. FT. OF - CONCRETE d ." r: n n o �tA SOIL TEST DATE OF SOIL TEST 0cm6 cie /u, 19 r 7 SOIL TEST DONE BY WITNESSED BY A. ✓yAj NvA.IC OBSERVAT,ON HOLE 1 OBSERI /� N HOLE 2 ELEV.=�- . PERCOLATION RATE . 4 2 MIN./INCH. ELEV.= q lc PERCOLATION RATE IN. /INCH. DEPTH HORIZON TEXTURE COLOR MOTTLING OTHER -ELEV.= °° n n n o !E3!r-� 0 �" ° REQUIRED SEPTIC TANK CAPACITY 13" �`, 6" SUMP E uL= ELEV. _rte ° 51.Z GAS LINE G ELEV. Iia°' DISTRIBUTION ° ° 0- ° ° ° ° ° ° ° ° " ° ELEV. GAL./DAY ELEV. _ 4041Ay %O YR -- ----- l�onTS Y BOX — 7.0 F�ocJ i�i6=' vscrz5 '31' TO BE WATER TESTED IF MORE THAN ONE OUTLET /0 U%3 Z n MEPwM G/ S WELL __�Z_ ZONE 3/4" TO 1 1/2" c nue �, INDEX WASHED STONE SHAD 6/4 ADJUST L SYSTEM PROFILE BOTTOM OF TEST HOLE OR USGS PROBABLE WA/ R TABLE OBSERVED WATER TABLE (( / ELEV. = �tA SOIL TEST DATE OF SOIL TEST 0cm6 cie /u, 19 r 7 SOIL TEST DONE BY WITNESSED BY A. ✓yAj NvA.IC OBSERVAT,ON HOLE 1 OBSERI /� N HOLE 2 ELEV.=�- . PERCOLATION RATE . 4 2 MIN./INCH. ELEV.= q lc PERCOLATION RATE IN. /INCH. DEPTH HORIZON TEXTURE COLOR MOTTLING OTHER FINAL CONTOUR /R SOIL TEST LOCATION /DYE' UTILITY POLE -�- REQUIRED SEPTIC TANK CAPACITY 13" 1 1,9 51.Z GAS LINE G LEACHING AREA l�°Y�-�+ s�Y`X"'" Iia°' LEACHING CAPACITY (AREAE X RATE) 40AIr411 ioyjC RESERVE LEACHING CAPACITY GAL./DAY 4041Ay %O YR -- ----- l�onTS Y --5-Al - '31' M�D�vr U%3 n MEPwM G/ S to IIID'' c nue C SHAD 6/4 /1/DWATER ENCOUNTERED AT'L 0"._ ELEV. LEGEND: EXISTING SPOT ELEVATION 00,0 EXISTING CONTOUR----00---- COLOR FINAL SPOT ELEVATION 00.0 FINAL CONTOUR 0 - SOIL TEST LOCATION /DYE' UTILITY POLE -�- REQUIRED SEPTIC TANK CAPACITY TOWN WATERW= -=W-- -- CATCH BASIN ;;®� " EFFLUENT LOADING RATE GAS LINE G LEACHING AREA l�°Y�-�+ s�Y`X"'" DEPTH HORIZON TEXTURE COLOR MOTTLING OTHER p" D/ Z VAMV /DYE' GAL/DAY REQUIRED SEPTIC TANK CAPACITY „ /? q `$AND EFFLUENT LOADING RATE GAL/DAY/S.F. LEACHING AREA l�°Y�-�+ s�Y`X"'" Iia°' LEACHING CAPACITY (AREAE X RATE) 40AIr411 ioyjC RESERVE LEACHING CAPACITY GAL./DAY 5 P AID -- ----- -._.� Y --5-Al - f3G^ M�D�vr U%3 to c nue C _; n N 1> No WATER ENCOUNTERED AT 1 a _ ELEV. DESIGN CALCULATIONS NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT TOTAL ESTIMATED FLOW y f (d U GAL./BR./DAY X BR.) GAL/DAY REQUIRED SEPTIC TANK CAPACITY J a .GAL. ACTUAL SIZE OF SEPTIC TANKS GAL EFFLUENT LOADING RATE GAL/DAY/S.F. LEACHING AREA l�°Y�-�+ s�Y`X"'" LEACHING CAPACITY (AREAE X RATE) GAL./DAY RESERVE LEACHING CAPACITY GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF yAQMuUT 11 RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO _ OBTAIN SUCH DETERMIN 4TION - FROM -APPROPRIATE AUTHORITY. _ _.- 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-800-322-4844 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. 8. PARCEL IS IN FLOOD ZONE -.c___. x50016 coos D 9. LOT IS SHOWN ON ASSESSORS MAP _._)�.__. AS PARCEL C37 I0• G �'li/:J�( Jf f%/ %J)•J i' Lj, fy�.:l f A 76 -All . APPROVED: BOARD OF HEALTH 01995 SWEETSER ENGINEERING