Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
83-2010 - Details
TYPICAL SYSTEM HYDRAULIC PROFILE INSTALLATION INSTRUCTIONS LDetall 1. Measure the distance from the bottom of the tank to 6" down from the top of the riser, Cut the extension pipe (by others) to the length necessary to reach this height. Cut 1/2 of the pipe down 12 to 18" away from the top of the pipe for pump discharge pipe. 12" to 18" away from the top of the ipe for pump discharge pipe and attach to riser (see detail 2. Glue the extension coupling (by others to the extension pipe and to the Cool Guide. 3. For re -use of existing concrete pump chambers: glue on the Cool Guide flat cap and place the Cool Guide firmly in the bottom of the tank. Attachthe extension to the riser, withthe extension to the riser, with the anchors as shown. hbAchor the flat cato the bottom of the tank 4. For use In new concree pump camin the pro er location to hold Cool Guide and extension. The cap may or may not be p nchors asshown.glued to the device. Attach the extension with thea NTS 6" OF GRAVEL D=THE DAILY DESIGN FLOW FOR THE SITE (NOTE, IF THIS VOLUME IS NOT AVAILABLE B' OF STATIC LIFT TO HU (MAX) MAXIMIZE STORAGE VOLUME IN TANK BY LAID FLAT TO PROVIDE AT LEAST 6" 5. Place the pipe dope on the Cool Guide adapter threads and thread them into ADAPTE ZONE 2 SUPPLY BETWEEN THE ALARM AND DRIP ENABLE pump discharge. FLOATS CH 80 UNION DRIP ENABLE FLOAT ELEVATION ATE VALVE NO WET 6. Attach cooling collar to adapter with set screw provided. COOLING COLLAR CLEAN 1/4' - 1/2' ATTACH 7. Glue pipe into flow collar and with pump attached, lower into the guide tube. - INSULATION AS PERS 8. Attach to discharge pipe, valves, and connect electrical as specified. 1-1/2' SCH 40 BELOW FROST ZONE (TYP 4'). NOTE 1 INSULATE LINES WITH RIGID FOAM PIPE WRAP INSULATION _- BOARD WHEN PROPER FROST DEPTH AROUND VERTICAL PIPES COUPLING EXTENSION COU (BY OTHERS) - PVC COUPL INS RT (BY OTHERS INLETS FLOW '�' c :FLOW 000 0 0 10 ° off CH 40 PVC ° c'o SEE INS OPTIONAL FLAT CAP ANCHOR BOLT THROUGH END CAP Cool Guide Patent No. 6,262,689 SUPPLY MANIFOLD 1/2" PIPING TO BE LOCATED ABOVE DRIP TUBING TO ALLOW THE MANIFOLD TO DRAIN AIR RELEASE VALVE VERTICAL INSULATED SUPPLY PIPE (PER COLD CLIMATE NOTES) 1/2" PVC MAIN SUPPLY PIPE BELOW FROST LINE STANDARD DRIP SYSTEM DETAILS (TOP FEED MANIFOLD) PRESSURIZED r DRIP TUBING +=i FINISHED GRADE DRIP TUBING .INSTALLATION DEPTH 6"•12" AS PER DESIGN INSTALLATION DEPTH TO BE BELOW THE FROST LINE 112" PVC FLEX PRESSURIZED DRIP TUBING TYPICAL PUMP TANK & HYDRAULIC UNIT DETAIL NTS 6" OF GRAVEL D=THE DAILY DESIGN FLOW FOR THE SITE (NOTE, IF THIS VOLUME IS NOT AVAILABLE B' OF STATIC LIFT TO HU (MAX) MAXIMIZE STORAGE VOLUME IN TANK BY LAID FLAT TO PROVIDE AT LEAST 6" PLACING THE ALARM FLOAT AS CLOSE TO RETURN THE OUTLET ELEVATION AS POSSIBLE THEN ZONE 1 SUPPLY PLACE PEAK ENABLE FLOAT HALF WAY ZONE 2 SUPPLY BETWEEN THE ALARM AND DRIP ENABLE RIGID FOAM INSULATION FLOATS CH 80 UNION DRIP ENABLE FLOAT ELEVATION ATE VALVE NO WET FINISHED GRADE 46 BOX HOLE TD BE CLEAN 1/4' - 1/2' DBILLEI] 7AUNCTIONI SUPPLY FLUSH RETURN TO !T LINE „Hyo°W SEPTIC TANK. fl�ll�11�11`1111 _ AIR RELEASE VALVE RETURN MANIFOLD TO BE LOCATED ABOVE DRIP TUBING TO ALLOW THE MANIFOLD TO DRAIN J\1/2" PVC/ VERTICAL INSULATED 1/2" PVC RIGID RETURN PIPE FLEX (PER COLD CLIMATE NOTES) NOTE: THE DRIP TUBING SHALL BE THE LOWEST POINT TO ALLOW FOR DRAINAGE FROM BOTH THE VERTICAL INSULATED SUPPLY AND RETURN PIPES DRIP TUBE SPACED 1.25' (15") APART SET LEVEL ON SAND BED ------ 40----------------- 7.5" ��1------ 15" t I Z126 1 ZONE, 2 LATERALS, 6 RUNS/LATERAL SCALE: 1"=6' COMMON RETURN PIPE BELOW FROST LINE SUPPLY LINE �ETURN LINE HYDROLIC UNIT GE OF SAND BED a AIR RELEASE FLUSH RETURN LINE VALVE (TYP.) VERTICAL SUPPLY & RETURN LINES INSULATED (PER (Z -RADIUS . RAM INSERT ADAPTER PVC FIP ADAPTER 12" 1/2' FLE PVC a TYP. DRIP DRIP LOOP TUBING NOTE; ALL DRIP LOOPS ARE TO BE LOCATED 2" ABOVE THE DRIP LINE TO ALLOW FOR THE LOOPS TO DRAIN TYPICAL DRIP LOOP CONNECTION PVC Primed Treaded Connection and Glued with Teflon Tape P Tubing Flex Pipe Barbed Ram Adapter Fitting nsert Fitting PVC FIP Connecting Drip Tubing to Flexible PVC Pipe g1NDISIURBEDI/ VERTICAL PIPE AROUND VERTICAL PIPES °ll -,f? "l1=11=11 TO BE INSULATED 6" OF GRAVEL 'lcll_Il=lhll_ll '11=11=11=1�11�11 B' OF STATIC LIFT TO HU (MAX) <u_ll_n n,u LAID FLAT TO PROVIDE AT LEAST 6" =11=11c111/FLUSH RETURN AIR RELEASE VALVES ZONE 1 SUPPLY VALVE BOX INSERTED ZONE 2 SUPPLY PUMP DISCHARGE TO HU RIGID INSULATION MANIFOLDS AND LATERALS DRIP ENABLE FLOAT ELEVATION MAXIMUM AIR RELEASE VALVES WITH COVERS TO HYDRAULIC UNIT DETAIL Supply Valve � Flowmeter NOTE: 1. THE AIR RELEASE VALVES 2. EACH ZONE TO HAVE SHALL BE PLACED AT THE TWO AIR RELEASE VALVES. HIGHEST POINT ON THE RETURN LINES TO BE SUPPLY AND RETURN LINE CONNECTED A COMMON FOR EACH ZONE. RETURN UNE. VALVE BOX WITH Ye' MIN. RIGID ®FOAM INSULATION INSERTED UNDER COVER FROM DRIP FIELD R RELEASE VALVE CHECK VALVE LAST LATERAL CONNECTION ZONE 1 TO COMMON FIRST LATERAL RETURN CONNECDON ZONE 2 AIR RELEASE & CHECK VALVE DETAIL etum YP n )Id TYPICAL MANIFOLD CONNECTION NOTE; ALL RIGID AND FLEXIBLE PVC ARE TO BE FOR THE PIPES TO DRAIN LINE TO ALLOW NOTE: PUMP CHAMBER AND SEPTIC TANK ARE COMBINED, NOT AS SHOWN ON THESE STANDARD DETAILS Disc Filters Field Flush Valve B J B e 1 Return To Septic Tank (Gravity 0.5% MIN,) 1" Common Return Bockflush Valve 1V Supply From Pump Tank 1"Zone Supplies 1/2" SUPPLY & RETURN MANIFOLD LOCATED ABOVE DRIP TUBING TO ALLOW MANIFOLDS TO DRAIN H GRADE PERC-RITE DRIP TUBING (Z121000 N FIGURATION) TO BE INSTALLED 8"ABOVE EXISTING GRADE COLD CLIMATE NO DRIP TUBING COVER TO CONSIST OF 3" OF CLEAN SAND WTH 3" OF LOAM AND SEED ON TOP MAIN SUPPLY &5' MIN. r. `: I• . •1/2" PVC FLEX RETURN LOCATED, COMMON RETURN ABOVE DRIP TUBING TO ALLOW ^ :" LINES LOCATED : DRAINAGE BELOW FROST LINE ` E9kJVYi , SOIL HORIZON A TO BE� REMOVED AND REPLACED WITH SAND MEETING TITLE 5 SPECIFICATIONS 310 CMR 15.255 FERC -RITE FIELD 15' x 40' (NOT TO SCALE) 3 �1 RONALD ' JAMES ; GAN LAC o�/sT �C as ��ryITAP�`� GENERAL CONSTRUCTION NOTES 1. The system shall not be installed in wet or frozen Soils. 2. Do not park, drive large equipment or store materials on the dispersal area. No activity should occur on the dispersal area other than the minimum required to install the system. 3. All installation and construction techniques shall conform to the state and local codes pertaining to on-site wastewater systems and the permit for the site, 4. If site conditions are determined to require the installation of the system to deviate from the design plans, all work shall stop immediately and the designer and inspector shall be notified. Any ongoing work shall be the sole responsibility of the contractor. 5. Drip tubing may be installed with a vibratory plow, a static plow, a narrow trencher (< 6" wide), by hand trenching, or by scarifying the surface and bedding the drip tubing in clean sand meeting the requirements for fill material in the state code. For sand fill systems, cover consisting of 2" of the same sand and then topsoil meeting the approved depth requirement shall be provided. 6. All drip tubing is to be installed parallel to the contour. 7. Air release valves shall be placed below the ground surface in a valve box but at an elevation above the highest drip line in that particular zone. S. Vegetative cover must be replaced for installations where it is removed or buried during installation. 9. All cutting of rigid pvc pipe, flexible pvc, and drip tubing of size 2" or smaller shall be accomplished with pipe cutters. No sawing is allowed. 10. All rigid pvc pipe, flexible pvc pipe and drip tubing shall have the ends covered with duct tape after cutting to prevent construction debris from entering the pipe. 11. Prior to gluing, all joints shall be inspected for and cleared of any debris. All joints shall be cleaned and primed with pvc primer prior to being glued. 12. All pvc pipe and fittings shall be sch 40. 13. Whenever possible, all force mains shall be tested for leaks prior to being back filled by pressurizing the system and observing for leakage. 14. The hydraulic unit shall be placed on top of the septic/treatment tank, pump chamber, or on a bed of 4" - 6" thick 34" gravel in a location within 30' of the pump. 15. If standing water is a problem in the vicinity of the hydraulic unit, a screened drain to daylight is required. 16. Electrician to provide separate circuits for the pump and controls/alarm, or as required by state and local codes. 17. All conduit entering into the control panel shall be sealed at both ends to prevent condensation inside the panel. COLD CLIMATE CONSTRUCTION STANDARDS 1. All attempts should be made to place the hydraulic unit in a location with an open southern exposure for warming purposes. 2. All pipes entering and leaving the hydraulic unit shall elbow vertically down 900 to a depth below the frost line prior to extending away from the unit horizontally. 3. The supply and return lines shall be installed below the frost line. When this is not possible, rigid foam insulation (min 1" thick) shall be placed over those pipes that are above the frost line. 4. The vertical sections of pipe that travel through the frost zone and connect the supply and return lines to the manifolds shall be insulated sch 40 pvc pipe. Insulation shall consist of foam pipe wrap insulation and 1" rigid foam insulation strips made into a box. (see insulation detail) 5. Rigid foam insulation shall be placed over the supply and return manifolds so that at least 6" of insulation extends each direction beyond the fittings. (see insulation detail) 6. Air release valves shall be insulated with bagged styrofoam peanuts or equivalent placed inside the enclosure around the air release valve. 7. All loops connecting drip runs shall be slightly elevated (minimum 1" - 2") so that they drain into the drip tubing after the pump shuts off. It is the contractor's responsibility to ensure that these loops stay elevated during and after the loops are backfilled. 8. Dense vegetative cover is to be established over the supply trench, return trench, manifolds, and drip tubing prior to the first exposure to freezing temperatures. If vegetation cannot be established then the trenches and manifold are to be covered with a thick layer (minimum 6") of mulch, straw/hay, or frost blanket until such turf cover is established. The tubing should be covered with mulch or straw/hay to prevent erosion if vegetative cover cannot be established. 9. Vegetation height over the drip dispersal area should be a minimum of 4" - 6" throughout the winter months. VALVE BOX INSERTED THROUGH 7" HOLE IN RIGID INSULATION TDP NEW GREEN VALVE BOX COVER MANIFOLDS AND LATERALS AT FINISHED GRADE BENEATH 2' X 2' RIGID INSULATION LAID FLAT HEALTH AGENT APPROVAL DATE RIGID INSULATION BOX AROUND VERTICAL PIPES -- ALL LATERALS SLOPE DOWNILL TO DRIP TUBING FOR SELF DRAINAGE MIN 1" THICK RIGID FOAM INSULATION LAID FLAT TO PROVIDE AT LEAST 6" COVERAGE BEYOND ALL FITTINGS AIR RELEASE VALVES VALVE BOX INSERTED THROUGH 7' HOLE IN RIGID INSULATION MANIFOLDS AND LATERALS BENEATH RIGID INSULATION FINISHED GRADE 46 r CLEAN 1/4' - 1/2' CRUSHED STONE RIGID FOAM - - INSULATION MIN. 1" THICK RIGID INSULATION BOX "a AROUND VERTICAL PIPES - SUPPLY AND RETURN LINES BELOW FROST ZONE (TYP 4'). FLEXIBLE FOAM OR RUBBER INSULATE LINES WITH RIGID FOAM PIPE WRAP INSULATION _- BOARD WHEN PROPER FROST DEPTH AROUND VERTICAL PIPES v CANNOT BE ACHIEVED. CROSS SECTION SITE PLAN FOR SANDRA PERKOW LOT 9A, 46 DOHERTY LANE, WEST YARMOUTH, MA DECEMBER 3, 2014 SCALE: AS SHOWN RONALD J. CADILLAC, PLS, RS, P.C. PROFESSIONAL LAND SURVEYOR & REGISTERED SANITARIAN P.O. BOX 258 WEST YARMOUTH, -MA 02673 (508) 775-9700 ©2014 BY R.J. CADILLAC PAGE 2 OF 2