Loading...
HomeMy WebLinkAbout83-2013 - Site PlanN ACCESS COVERS MUST BE WITHIN 6- OF FINISH GRADE FIRST 2' TO BE LEVEL? INSPECTION PORT T =L1 ' v 3/.25J\ 30 7 As DBAFFLE .9 30 62 I I// 111 11 J 2 30 TLET 24 HIGH CAPACITY INFILTRATOR -BOX CHAMBERS IN BED FORMATION 1500 GAL 14-20 SEPTIC TANK 6' CRUSHED STONE OR HIGH CAPAi COMPACTED BASE PROFILE : NOT TO SCALE r r / r � SALT BOX 804Br LOCUS MAP D lD 20 40 9' MINIMUM. 3- MAXIMUM COVER CLEAN SAND BACKFILL AROUND AND 2' OVER CHAMBERS INVERT ELEVATIONS: TP *l INVERT AT BUILDING: 32.7 INVERT IN SEPTIC TANK: 31.5 INVERT OUT SEPTIC TANK: 31.25 INVERT IN DIST. BOX: 30.97 INVERT OUT DIST. BOX: 30.8 INVERT IN LEACH CHAMBER: 30.62 BOTTOM OF LEACH CHAMBER: 29.7 ADJUSTED GROUND WATER: N/A OBSERVED GROUND WATER: N/A BOTTOM OF TEST HOLE *l: 23 CONSERVATION NO TES : I. THE WORK LIMIT SHOWN SHALL BE FITTED WITH STRAW WATTLES BACKED BY A DUG -IN FABRIC SILT FENCE. THE FENCE SHALL REMAIN IN PLACE UNTIL THE DISTURBED GROUND 15 STABILIZED COMPLETELY. 2. NO CONSTRUCTION RELATED ACTIVITY SHALL OCCUR ON THE WETLAND SIDE OF THE WORK LIMIT. J. ROOF DRAINS SHALL BE DIRECTED TO SUITABLY SIZED DRYWELLS AND/OR STONE TRENCHES ALONG THE ROOF DRIP LINE FOR STORMWATER RUNOFF CONTROL. 4. INITIAL SOIL STABILIZATION WITHIN THE WORK LIMIT SHALL BE ACCOUPLISHED BY APPLICATION OF MULCH AND/OR LOAM AND SEED WEATHER PERMITTING. 5. ACCESS FOR DEMOLITION AND CONSTRUCTION SHALL BE VIA THE STREET SIDE OF THE PROPERTY WITH LIMITED ACCESS AS SHOWN AROWD THE PROPOSED DWELLING SITE. --6 ---ALL—DEBRIS SHALL BF—"DED FROM THE .SITE AS IT IS PRODUCED AND TRANSPORTED TO A SUITABLE SOLID WASTE \ HANDLING FACP-ITY. iia" / -tt ps/2 r / ' HE / / DESIGN CRITERIA: DESIGN FLOW: 4 BEDROOMS AT 1/0 G.P.D. PER BEDROOM EQUALS 440 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 440 G.P.D. X 200x - 880 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN. SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE C 5 MIN/INCH SOIL TEXTURAL CLASS - I EFFLUENT LOADING RATE - 0.74 GPD/SF 440 GPD / 0.74 GPD/SF - 595 S.F. REQUIRED PROVIDED: 24 H16H CAPACITY INFILTRATOR CHAMBERS. 150'x 4.73 SF/FT - 709 S.F. 709 S.F. x 0.74 - 525 GPD SOIL TEST PIT DA TA INDICATES�_ 1 ND I CATES PERCOLATION OBSERVED TEST - GROUNDWATER DATE: JUNE 25. 20/4 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VONHONE PERC RATE: C 2 MIN/INCH 34.1 33.4 32.1 23.1 GENERAL NO TES : I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET. SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. B. EXISTING SEPTIC SYSTEM TO BE PUMPED DRY, REMOVED AND BACKFILLED. 9. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEED RESTRICTIONS OR ZONING REGULATIONS. IT SHALL REMAIN THE CLIENTS RESPONSIBILITY TO OBTAIN ALL PERMITS, SPECIAL PERMITS, VARIANCES ETC. FOR THIS PROJECT. lO. THE EXISTING DWELLING IS TO BE REMOVED DOWN TO .THE FIRST FLOOR DECK. THE EXISTING FOUNDATION AND STEEL FRAME FOR THE SUN DECK .TO REMAIN. m CB TP *l —W— 0. HORIZON TEXTURE COLOF —G— GAS LINE — OHW— A LOAMY IOYR —E— UNOERGROUND ELECTRIC LINE SAND 3/4 9'-------------------- UNDERGROUND CABLEVISION LINE + 40.4 SPOT ELEVATION ........ 40------- B LOAMY IOYR 7. 2015 STEPHEN SAND 4/6 24 ----------------------- -------------------- ENGINEERING, INC MEDIUM MED I UM IOYR _ SAND 6/6 DATE: JUNE 25. 20/4 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VONHONE PERC RATE: C 2 MIN/INCH 34.1 33.4 32.1 23.1 GENERAL NO TES : I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET. SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. B. EXISTING SEPTIC SYSTEM TO BE PUMPED DRY, REMOVED AND BACKFILLED. 9. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEED RESTRICTIONS OR ZONING REGULATIONS. IT SHALL REMAIN THE CLIENTS RESPONSIBILITY TO OBTAIN ALL PERMITS, SPECIAL PERMITS, VARIANCES ETC. FOR THIS PROJECT. lO. THE EXISTING DWELLING IS TO BE REMOVED DOWN TO .THE FIRST FLOOR DECK. THE EXISTING FOUNDATION AND STEEL FRAME FOR THE SUN DECK .TO REMAIN. m CB CONCRETE BOUND —W— WATER LINE O HYDRANT —G— GAS LINE — OHW— OVER HEAD WIRES # LIGHT POST —E— UNOERGROUND ELECTRIC LINE —T— UNDERGROUND TELEPHONE LINE — CTV— UNDERGROUND CABLEVISION LINE + 40.4 SPOT ELEVATION ........ 40------- EXISTING CONTOUR 4�OL _ PROPOSED CONTOUR S I TE_ PLAN O)= LAND 97 SALT BOX ROAD. MAP 8 / . PARCEL 4 SOUTH YARMOUTH. MA . PREPARED FOR: RON L UKASE7V I CZ SCALE: I'— 20' JANUARY 7. 2015 STEPHEN A. HAAS ENGINEERING, INC _ F' . O. B o x 16 Sou t h Den n i ( 508 s MA 02660 ) 362-8132 JOB NO: 14-030 12 dah' an