Loading...
HomeMy WebLinkAbout83-2013 - Site Plan 2N ACCESS COVERS MUST BE WITHIN 6' OF FINISH GRADE FIRST 2' TO BE LEVEL? INSPECTION PORT T cAS31.25 V6"jCRUSHED uo 30.62 J` 'I �Il I �I II 2 BAFFLE OUTLET 24 HIGH CAPACITY INFILTRATOR v r O -BOX CHAMBERS IN BED FORMATION 1500 GALH-20 SEPTIC TANK STONE OR COMPACTED BASE PROFILE:NOT TO SCALE SALT BOX RO4D //'/ .. � _, ro \o ROLLOFF DUMPSTER 1\ FOR DEMOLITION DEBRIS �\ \ _TO_6E PLACED IN THE \1 _\ \\ LEACH EXISTIIIG OR"ENA-Y \ \PIT \-'\ 1 \ \ t 9' MINIMUM, 3- MAXIMUM COVER CLEAN SAND BACKFILL AROUND AND 2- OVER CHAMBERS +34.4 ;NVERT ELEVATIONS INVERT AT BUILDING: 32.7 INVERT IN SEPTIC TANK: 31.5 INVERT OUT SEPTIC TANK: 31.25 INVERT IN DIST. BOX: 30.97 INVERT OUT DIST. BOX: 30.8 INVERT IN LEACH CHAMBER: 30.62 90TTOM OF LEACH CHAMBER: 29.7 ADJUSTED GROUND WATER: � N/A OBSERVED GROUND WATER: N/A 30TTOM OF TEST HOLE. #1: 23.1 CONSERVATION NO TES : 1. THE WORK LIMP' SHOWN SHALL BE FITTED WITH STRAW WATTLES BACKE" BY A DUO -IN FABRIC SILT FENCE. THE FENCE SHALL REMAIN IN PLACE UNTIL THE DISTURBED GROUND IS ST471LIZED COMPLETELY. 2. NO CONSTRUCTION RELATED ACTIVITY SHALL OCCUR ON THE WETLAND SIDE OF THE WORK LIMIT. 3. ROOF DRAINS SHALL BE DIRECTED TO SUITABLY SIZED DRYWELLS ANDA9R STONE TRENCHES ALONG THE ROOF DRIP LINE FOR STORIWATER RUNOFF CONTROL. 4. INITIAL SOIL "TABILIZATION WITHIN THE WORK LIMIT SHALL BE ACCOIPLISHED BY APPLICATION OF MULCH AND/OR LOAM AND SEED WEATHER PERMITTING. 5. ACCESS FOR DE.fOLITION AND CONSTRUCTION SHALL BE VIA THE STREET SP)E OF THE PROPERTY WITH LIMITED ACCESS AS SHOWN AROUID THE PROPOSED DWELLING SITE. CO `-J_-� Dkt K\,ti^'/'\ /•- F 6. ALL DEBRIS SI'.i1t_L tlE LAOL-0 FRCM THE SITE AS IT IS o' PIT �34 2 /--- _ _ r a\'1`p6 h / / /�, PRODUCED AND TRANSPORTED TO A SUITABLE SOLID WASTE y N BM ORNLi4 STEP / > 11-2/ / ^f q, F HANDLING FACILITY. EL -34.`9 ....v: FX fSTING SEPTIC TANK 1500 GALLON SEPTIC TANK 00 C, 14 R pp N' HBpryK LOCUS IZ- 5a 0p n LOCUS MAP CO 5� \�0 265 1211 3.2 28.9 0�'4i / t / 24/0qq' ! 29. 24.6 116 0 10 20 40 d DESIGN CRITERIA: DESIGN FLOW: 4 BEDROOMS AT 110 G.P.D. PER BEDROOM EQUALS 440 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 440 G.P.D. X 20Ox: - 880 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN. SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE C 5 MIN/INCH SOIL TEXTURAL CLASS - 1 EFFLUENT LOADING RATE - 0.74 GPD/SF 440 GPD / 0.74 GPD/SF - 595 S.F. REQUIRED PROVIDED: 24 HIGH CAPACITY INFIL TRA TOR CHAMBERS. 150'x 4.73 SF/FT - 709 S.F. 709 S.F. x 0.74 - 525 GPD SOIL TEST PIT DATA s INDICATES_� INDICATES PERCOLATION _ OBSERVED TEST _ GROUNDWATER TP #1 0. HORIZON TEXTURE COLOR 34.1 ® CB : A-134.0 & -W- WATER LINE SAND 314 HYDRANT 9' ---------------- /0' by y LIGHT POST - SAND 4/6 -T- 24' ------------- - ---- 32.1 -I- 40.4 C I MEDIUM IOYR -------- 40 ..... .- EXISTING CONTOUR C8/DH FND�1 I �y 1 i \ I + r 24 HIGH CAPACITY \\ INFILTRATOR CHAMBERS \ "� +34.4 �/ 34.0 R pp N' HBpryK LOCUS IZ- 5a 0p n LOCUS MAP CO 5� \�0 265 1211 3.2 28.9 0�'4i / t / 24/0qq' ! 29. 24.6 116 0 10 20 40 d DESIGN CRITERIA: DESIGN FLOW: 4 BEDROOMS AT 110 G.P.D. PER BEDROOM EQUALS 440 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 440 G.P.D. X 20Ox: - 880 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN. SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE C 5 MIN/INCH SOIL TEXTURAL CLASS - 1 EFFLUENT LOADING RATE - 0.74 GPD/SF 440 GPD / 0.74 GPD/SF - 595 S.F. REQUIRED PROVIDED: 24 HIGH CAPACITY INFIL TRA TOR CHAMBERS. 150'x 4.73 SF/FT - 709 S.F. 709 S.F. x 0.74 - 525 GPD SOIL TEST PIT DATA s INDICATES_� INDICATES PERCOLATION _ OBSERVED TEST _ GROUNDWATER TP #1 0. HORIZON TEXTURE COLOR 34.1 ® CB A LOAMY IOYR -W- WATER LINE SAND 314 HYDRANT 9' ---------------- 33.4 OVER HEAD WIRES B LOAMY IOYR LIGHT POST -E- SAND 4/6 -T- 24' ------------- - ---- 32.1 -I- 40.4 C I MEDIUM IOYR -------- 40 ..... .- EXISTING CONTOUR SAND 6/6 40- 132= DATE: JUNE 25. 2014 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VON14ONE PERC RATE: ( 2 MIN/INCH TERRY °sm WARNER N No. 38721 S 23.1 GENERAL NOTES.: 1. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET. SEE SITE PLAN. J. ALL CONSTRICTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFGRCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. 8. EXISTING SEPTIC SYSTEM TO BE PUMPED DRY, REMOVED AND BACKFILLED. 9. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEED RESTRICTIONS OR ZONING REGULATIONS. IT SHALL REMAIN THE CLIENTS RESPONSIBILITY TO OBTAIN ALL PERMITS, SPECIAL PERMITS. VARIANCES ETC. FOR THIS PROJECT. I0. THE EXISTING DWELLING IS TO BE REMOVED DOWN TO THE FIRST FLOOR DECK. THE EXISTING FOUNDATION AND STEEL FRAME FOR THE SUN DECK TO REMAIN. L E(3END ® CB CONCRETE BOUND -W- WATER LINE O HYDRANT -G- GAS LINE OHW- OVER HEAD WIRES .0 LIGHT POST -E- UNDERGROUND ELECTRIC LINE -T- UNDERGROUND TELEPHONE LINE - CTV- UNDERGROUND CABLEVISION LINE -I- 40.4 SPOT ELEVATION -------- 40 ..... .- EXISTING CONTOUR 40. PROPOSED CONTOUR 1 S I TE PLAN OF LANE) 07 SALT BOX ROAD. MAP 81 PARCEL 41 SOUTH YARMOUTH. MA. PREPARED FOR: RON L_ UKASEV I CZ SCALE_ I"- 20' JANUARY 7. 2015 STEPHEN A. HAAS ENGINEERING, INC A P.O. Box 161 South Dennis, MA 02660 ( 508) 362-8132