Loading...
HomeMy WebLinkAbout83-2019 - Sewage Disposal002LOCUS MAP SCALE: 1" = 500' AM W AP 26, IAT 301 SCHEDULE OF ELEVATIONS TOP OF FOUNDATION, TOP OF CONCRETE 13.60 CRAWL SPACE TOP OF SLAB 9.60 INVERT OF PIPE AT FOUNDATION 11.22 INVERT AT SEPTIC TANK INLET 10.97 INVERT AT SEPTIC TANK OUTLET 10.72 INVERT AT DISTRIBUTION BOX INLET 10.56 INVERT AT DISTRIBUTION BOX OUTLET 10.39 INVERT AT CHAMBER INLET 10.17 ELEVATION OF TRENCH BOTTOM 9.00 FINISHED GRADE OVER LEACHING AREA (F.G.)-- 11.8 GROUND WATER ELEVATION 3.80 BREAKOUT ELEVATION 10.71 NOTES 1.) SEE SOIL TEST LOGS AND PLAN FOR LEACHING FIELD REQUIRED EXCAVATION DEPTH AND LIMITS. COMPUTED BY: JWN 2. SITE IS WITHIN 100 YEAR FLOOD PLAIN AE -11 ZONE BUT IS NOT WITHIN A NITROGEN SENSITIVE AREA. DRAFTED BY: NOTE: THE LOT IS GRANDFATHER. THE LOT WAS CREATED IN 1956. DESIGNED BY: BPG PROVIDED > 743 S.F. REQUIRED. AP 25. IAT 302 ASB6=11.8 sr�/ 29 OR X99 , aC+a4 SApow vee1>b 1OM ,4 / 4tr tasumBTACE / I�EastrseElB�ne / �sclassEc Boulm � VICAQ 917SOUTH WEST DRIVE (GRILVEL ROAD) BENCHUARK Top OF CONCRETE BOUND EL 10.39 NAW 1988 CONVENTIONAL SYSTEM LAYOUT VAL: DATE 2/12/15 ADJUST ELEVATION OF SDS 3/17/15 ADD DRIP EDGE 4/15/15 C NSERVATION COMMISSION COMMENTS 24 MAN UB 11tH RFA&Y REMOVABE /WPOWALE COVERS OF DURABLE MATERIAL MIN. F.G. 125 24 LABARON FOUNDARY LylFia Ii OF FINISH CRADE LAH244 FRAME AND COVER AT GRADE OR APPROVED EQUAL ° PROPOSE) DIM o INV.= 10.97 INV.=10.72 4 SOL 40 PVC ° 111 OUTLET VIH ZABEL FILIM 3 PVC UOw 10 � LEVET 93DING SETTER r SIGH 40 PVC OR N CAST 10 111111 IfAD AND 0" JOINTS !i CRG19IE1)D S10NE 9 1 SILT FDUn AND SILT SOC AP 25, LOT 301 PROPOSED - 1,500 GALLON S[PTIC TANK Know whars below. Cali before you dig. !, AP 25, LOT 299 IN ACCORDANCE WITH THE MODIFIED CERTIFICATION FOR GENERAL USE FOR CULTEC HIGH GROUND -WATER, LEVEL COMPUTATION FOR 11 SOUTH WEST DRIVE CHAMBERS DATED FEBRUARY 22, 2010 PURSUANT TO TITLE 5, THE FOLLOWING YARMOUTH, MA 02601 CALCULATIONS ADDRESS SECTION IV 'CONDITIONS APPLICABLE TO THE SYSTEM OWNER" TEST NO.: IN WHICH A SYSTEM FOR NEW CONSTRUCTION SHALL DEMONSTRATE THAT A STEP 2 USING WATER -LEVEL RANGE ZONE CONVENTIONAL ABSORPTION SYSTEM USING AGGREGATE CAN BE INSTALLED En ON THE DATUM SITE. INTERVAL DESIGN DATA: DESIGN FLOW: 5 BEDROOM SINGLE FAMILY DWELLING SITE AND DETERMINE: NUMBER OF BEDROOMS X 110 GAL/BR/bAY - DESIGN FLOW DATUM FIVE (5) BEDROOMS X 110 GAL/BR/DAY - 550 GAL/DAY (GPD) INTERVAL LEACHING FACILITY (CONVENTIONAL TRENCH PIPE & STONE):; RESEARCH BY: JWN SOIL TEXTURAL CLASS (310 CMR 15.243): CLASS 1 (SANDS, LOAMY SANDS) SOAK DESIGN PERCOLATION RATE: Q MIN./IN. FIELD SURVEY: KGM/JWN LONG TERM ACCEPTANCE RATE (310 CMR 15.242): 0.74 GPD/SQ. FT. WATER RESOURCES CONDITIONS DESIGN FLOW (GPD) / LTAR (GPD/SQ. FT.) = MIN. LEACHING AREA (SQ. FT.) COMPUTED BY: JWN 550 GPD / 0.74 GPD/SQ. FT. - 743 SQ. FT. REQUIRED. DRE)/BPG SYSTEM AREA PROVIDED (SQ. Ff.) _ # OF TRENCHES X LENGTH OF TRENCH X DRAFTED BY: [(2 X EFFECTIVE DEPTH) + WIDTHj = 2 X 54 X [(2 X 2) + 31 = 756 S.F. DESIGNED BY: BPG PROVIDED > 743 S.F. REQUIRED. 12" EXCAVATION AREA REQUIRED = 641ONG BY 25' MADE NTH 5' OVERDIG CHECKED BY: BJW 12" REVISION DATE 2/12/15 ADJUST ELEVATION OF SDS 3/17/15 ADD DRIP EDGE 4/15/15 C NSERVATION COMMISSION COMMENTS 24 MAN UB 11tH RFA&Y REMOVABE /WPOWALE COVERS OF DURABLE MATERIAL MIN. F.G. 125 24 LABARON FOUNDARY LylFia Ii OF FINISH CRADE LAH244 FRAME AND COVER AT GRADE OR APPROVED EQUAL ° PROPOSE) DIM o INV.= 10.97 INV.=10.72 4 SOL 40 PVC ° 111 OUTLET VIH ZABEL FILIM 3 PVC UOw 10 � LEVET 93DING SETTER r SIGH 40 PVC OR N CAST 10 111111 IfAD AND 0" JOINTS !i CRG19IE1)D S10NE 9 1 SILT FDUn AND SILT SOC AP 25, LOT 301 PROPOSED - 1,500 GALLON S[PTIC TANK Know whars below. Cali before you dig. !, AP 25, LOT 299 FA AP 25, LOT 303 PROPOSED CONSTRUCTION ENTRANCE j 110 21 COARSE AGGMTE OBSERYAigN PORT (IV.OF2) I PROPOSED i x7 / MAILR Sllff \ i CONCRETE BOUND / (FOUND TYPICAL) 106 11753' SOUTH WEST DRIVE _ _ _ _ �I (GRAVEL ROAD) -g BENCHMARK TOP OF CONCRETE BOUND EL 10.39 NAVE) 1988 SITE PLAN 20 ° SCALE: 1 to = 20' ASSESSORS MAP 25 LOT 302 ZONING REFERENCE R-25 BUILDING SETBACK - FRONT YARD 30' SIDE YARD = 15 ' REAR YARD = 20' (CURRENT ZONING) PROFILE OF SYSTEM (Nor TO mw MI NIMIIM OF 1Y COVER MA)aMLIM OF 36' COVER OBSERVATION PIPE MANHOLE AND COVER TO OVER SY"IEL TO FINISH GRADE MA(lNEIiC TAPING V FROM FINISH GRADE GRASS MACE (1 PER TRENCH) MIN. F.G.=124 SE CONSTRUCTION NOTE 7 ON SHEET 2 111- 2% MIMM SLOPE 15' MIN - �MAG;UC TAPING IN =1 . 3, _ M . . . . . . . . . 4' SON 40 PVC THIN 6" CRUSHED STONE If 11 44.3 ¶GHT imis LEACHING TRENCHES DISTRIBUTION BOX (NOT >D (n�orrosru�) "4 TRENCH CONFIGURATION 2 TRENCHES 44.3' LONG SPACED 12' O.C. CONTAINING 7 CULTEC 180 HD CHAMBERS EACH TRENCH JAMES W. NIEVA 39399 /y. GRAPHIC SCALE ( IN FEET ) 1 INCH = 20 FEET INSPECTIONS REQUIRED OF THE DESIGN ENGINEER PLEASE NOTIFY DUNN-McKENZIE, INC. (800-540-9720) AT LEAST 48 HOURS IN ADVANCE 1. SEPTIC TANK EXCAVATION WITH STONE PRIOR TO SEPTIC TANK PLACEMENT. 2. LEACHING FIELD EXCAVATION PRIOR TO BACKFILLING WITH "SEWER GRAVEL". 3. "SEWER GRAVEL" BACKFILL -MUST PASS SIEVE TEST (SEE NOTE #1 ON SHEET #2 UNDER "SYSTEM INFILL-). 4. ALL PIPING AND CHAMBER ELEVATIONS PRIOR TO BACKFILL. 5. FILTER FABRIC AND FINAL GRADING OVER ENTIRE SYSTEM. * EXCAVATION NOTE THE ENGINEER MAY ORDER THE REMOVAL OF ADDITIONAL UNSUITABLE SOIL THAT MAY BE ENCOUNTERED UPON INSPECTION OF OPEN EXCAVATION. DATUM NOTE: ELEVATIONS REFER TO THE NATIONAL GEODETIC VERTICAL DATUM - 1988 BENCHMARK NOTE: BENCHMARK SHALL BE SET WITHIN 50 FT. OF LEACHING SYSTEM PRIOR TO ANY CONSTRUCTION. REMOVE THESE SOIL HORIZONS SEE "LEACHING FIELD' NOTE 6 ON SHEET 2 SOIL TEST RESULTS TEST HOLE: 14-1 11-14-14 GROUND ELEV = 10.4 HOLE: 14-2 DATE: 11-14-14 GROUND ELEV.= 10.3 DEPTH HORIZON SOIL SOIL COLOR l! DEPTH HORIZON SOIL TYPESOIL COLOR ,ELEV. 10.2 .0-2"�,� 0� SANDY LOAM ;10.1 2-6' /�A/ SANDY LOAM! 7YR 7/8'/X ',9.9 2-6"//! �A/%BAWDY LOAM ,7YR 7/8/ 9.8/ 6-12' E SAND 5YR 8/1 9.4 6-17' E SAND 5YR 8/1 8.9 12-48" B SAND 7YR 5/8 6.4 17-54' B SAND 7YR 5/8 5.8 48-120' C SAND 1OYR 6/6 0.4 54-120" C SAND 10YR 6/6 0.3 GROUNDWATER WEEPING 0 110" 1.23 GROUNDWATER WEEPING 0 108' 1.30 GROUNDWATER M. (2.50 FRIMPTER ADJUSTMENT) 3.73 GROUNDWATER ELEV. (2.5' FRIMPTER ADJUSTMENT) 3.80 CAPE COD COMMISSION TECHNICAL BULLETIN 92-001 CAPE COD COMMISSION TECHNICAL BULLETIN 92-001 TEST HOLE DATE GROUND ELEV.= TEST HOLE: DATE GROUND ELEV.= DIMOHOH RIZON SOIL SOIL COLO I ELEV. I DEPTH0}1 RIZON SOIL TYPE SOIL COLOR I ELEV. SOIL EVALUATOR: JAMES W. NIEVA, PLS, C.S.E I B.O.H. AGENT: AMY L vonHONE, R.S., C.H.O. HIGH GROUND -WATER, LEVEL COMPUTATION FOR 11 SOUTH WEST DRIVE PERCOLATION TESTS YARMOUTH, MA 02601 STEP 1 MEASURE. DEPTH TO WATER TABLE DATE 11/14/14 TO NEAREST 1/10 FT. TEST NO.: ELEV.= STEP 2 USING WATER -LEVEL RANGE ZONE TEST NO.: ELEV.= DATUM AND INDEX WALL MAP LOCATION INTERVAL DATUM SITE AND DETERMINE: JINTERVAL DATUM ® APPROPRIATE INDEX WELL W2 INTERVAL DATUM (2) WATER -LEVEL RANGE ZONE " INTERV/ SOAK STEP 3 USING MONTHLY REPORT "CURRENT SOAK WATER RESOURCES CONDITIONS Dunn • McKenzie, Inc. SOAK DETERMINE CURRENT DEPTH TO 12" 1.37 WATER LEVEL FOR INDEX WELL 11/14 9. 8 12" STEP 4 USING TABLE OF WATER -LEVEL ADJUSTMENTS 12" FOR INDEX WELL (STEP 2A), CURRENT DEPTH 12" TO WATER LEVEL FOR INDEX WELL (STEP 3), 11" AND WATER -LEVEL ZONE (STEP 2B) 11" TRENCH DETERMINE WATER -LEVEL ADJUSTMENT 2.5 11" STEP 5 ESTIMATE DEPTH TO HIGH WATER 11" BY SUBTRACTING THE WATER 10" SHEET 1 OF 2 LEVEL ADJUSTMENT (STEP 4) 10" FROM MEASURED DEPTH TO WATER 10" LEVEL AT SITE (STEP 1) 6.5 10" FA AP 25, LOT 303 PROPOSED CONSTRUCTION ENTRANCE j 110 21 COARSE AGGMTE OBSERYAigN PORT (IV.OF2) I PROPOSED i x7 / MAILR Sllff \ i CONCRETE BOUND / (FOUND TYPICAL) 106 11753' SOUTH WEST DRIVE _ _ _ _ �I (GRAVEL ROAD) -g BENCHMARK TOP OF CONCRETE BOUND EL 10.39 NAVE) 1988 SITE PLAN 20 ° SCALE: 1 to = 20' ASSESSORS MAP 25 LOT 302 ZONING REFERENCE R-25 BUILDING SETBACK - FRONT YARD 30' SIDE YARD = 15 ' REAR YARD = 20' (CURRENT ZONING) PROFILE OF SYSTEM (Nor TO mw MI NIMIIM OF 1Y COVER MA)aMLIM OF 36' COVER OBSERVATION PIPE MANHOLE AND COVER TO OVER SY"IEL TO FINISH GRADE MA(lNEIiC TAPING V FROM FINISH GRADE GRASS MACE (1 PER TRENCH) MIN. F.G.=124 SE CONSTRUCTION NOTE 7 ON SHEET 2 111- 2% MIMM SLOPE 15' MIN - �MAG;UC TAPING IN =1 . 3, _ M . . . . . . . . . 4' SON 40 PVC THIN 6" CRUSHED STONE If 11 44.3 ¶GHT imis LEACHING TRENCHES DISTRIBUTION BOX (NOT >D (n�orrosru�) "4 TRENCH CONFIGURATION 2 TRENCHES 44.3' LONG SPACED 12' O.C. CONTAINING 7 CULTEC 180 HD CHAMBERS EACH TRENCH JAMES W. NIEVA 39399 /y. GRAPHIC SCALE ( IN FEET ) 1 INCH = 20 FEET INSPECTIONS REQUIRED OF THE DESIGN ENGINEER PLEASE NOTIFY DUNN-McKENZIE, INC. (800-540-9720) AT LEAST 48 HOURS IN ADVANCE 1. SEPTIC TANK EXCAVATION WITH STONE PRIOR TO SEPTIC TANK PLACEMENT. 2. LEACHING FIELD EXCAVATION PRIOR TO BACKFILLING WITH "SEWER GRAVEL". 3. "SEWER GRAVEL" BACKFILL -MUST PASS SIEVE TEST (SEE NOTE #1 ON SHEET #2 UNDER "SYSTEM INFILL-). 4. ALL PIPING AND CHAMBER ELEVATIONS PRIOR TO BACKFILL. 5. FILTER FABRIC AND FINAL GRADING OVER ENTIRE SYSTEM. * EXCAVATION NOTE THE ENGINEER MAY ORDER THE REMOVAL OF ADDITIONAL UNSUITABLE SOIL THAT MAY BE ENCOUNTERED UPON INSPECTION OF OPEN EXCAVATION. DATUM NOTE: ELEVATIONS REFER TO THE NATIONAL GEODETIC VERTICAL DATUM - 1988 BENCHMARK NOTE: BENCHMARK SHALL BE SET WITHIN 50 FT. OF LEACHING SYSTEM PRIOR TO ANY CONSTRUCTION. REMOVE THESE SOIL HORIZONS SEE "LEACHING FIELD' NOTE 6 ON SHEET 2 SOIL TEST RESULTS TEST HOLE: 14-1 11-14-14 GROUND ELEV = 10.4 HOLE: 14-2 DATE: 11-14-14 GROUND ELEV.= 10.3 DEPTH HORIZON SOIL SOIL COLOR l! DEPTH HORIZON SOIL TYPESOIL COLOR ,ELEV. 10.2 .0-2"�,� 0� SANDY LOAM ;10.1 2-6' /�A/ SANDY LOAM! 7YR 7/8'/X ',9.9 2-6"//! �A/%BAWDY LOAM ,7YR 7/8/ 9.8/ 6-12' E SAND 5YR 8/1 9.4 6-17' E SAND 5YR 8/1 8.9 12-48" B SAND 7YR 5/8 6.4 17-54' B SAND 7YR 5/8 5.8 48-120' C SAND 1OYR 6/6 0.4 54-120" C SAND 10YR 6/6 0.3 GROUNDWATER WEEPING 0 110" 1.23 GROUNDWATER WEEPING 0 108' 1.30 GROUNDWATER M. (2.50 FRIMPTER ADJUSTMENT) 3.73 GROUNDWATER ELEV. (2.5' FRIMPTER ADJUSTMENT) 3.80 CAPE COD COMMISSION TECHNICAL BULLETIN 92-001 CAPE COD COMMISSION TECHNICAL BULLETIN 92-001 TEST HOLE DATE GROUND ELEV.= TEST HOLE: DATE GROUND ELEV.= DIMOHOH RIZON SOIL SOIL COLO I ELEV. I DEPTH0}1 RIZON SOIL TYPE SOIL COLOR I ELEV. SOIL EVALUATOR: JAMES W. NIEVA, PLS, C.S.E I B.O.H. AGENT: AMY L vonHONE, R.S., C.H.O. 2 LOCATIONS PERCOLATION TESTS YARMOUTH, MA 02601 TEST NO.: 14-2 ELEV.= 10.3 TEST NO.: ELEV.= TEST NO.: ELEV.= TEST NO.: ELEV.= DATUM TIME INTERVAL DATUM TIME JINTERVAL DATUM TIME INTERVAL DATUM TIME INTERV/ SOAK 1:22 - 1:37 SOAK SOAK Dunn • McKenzie, Inc. SOAK 12" 1.37 12" • Rf 5 SEW SAND 12" 12" 11" 11" TRENCH CROSS SECTION 11" 11" (NOT TOSrAE) 10" SHEET 1 OF 2 JOB NO. 5221 10" 10" 10" 9" 1 1:39 9" 9" 9" 8" 8" 8" 8' 7" 7" 7" 7" 6" 1.41 6' 6' 6" RATE: <2 MPI RATE: RATE: RATE: DATE: 11-14-14 DATE: DATE: DATE: DEPTH: 36" DEPTH: DEPTH: DEPTH: I CERTIFY THAT ON JULY 1, 2010, 1 HAVE PASSED THE EXAMINATION APPROVED BY THE DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THAT THE ABOVE ANALYSIS HAS BEEN PERFORMED CONSISTENT WITH THE REQUIRED TRAINING, EXPERTISE, EXPERIENCE DESCRIBED IN 310CMR 15.018(2). JAMES W. NIEVA, PLS, SOIL EVALUATOR SE#13258 TITLE FOR A 5 SEWAGE DISPOSAL SYSTEM PROPOSED 5 BEDROOM DWELLING LOCATION 4' SCK 40 PVC FILTER FABRIC AT PISERIED g• plTp 11 SOUTH WEST DRIVE 2 LOCATIONS FIRST CHAMBER YARMOUTH, MA 02601 APPLICANT RECORD OWNER: S.L. BENOIT GEORGE & JANA TARASENKO ON 1"- >:'': =%rz z, %i 206 DEDHAM STREET 87 PATRICKS RUN - :•,;;;,� << NORFOLK, MA 02056 STOUGHTON, MA 02072 __ _,::,n 508-889-5992 Dunn • McKenzie, Inc. LAND SURVEYING AND CIVIL ENGINEERING • Rf 5 SEW SAND 206 DEDHAM STREET, Rt.1A at Rt.115 NORFOLK, MASSACHUSETTS 02056 (508) 384-3990 - FAX (508) 384-3905 email: staff@dunnmckenzie.com TRENCH CROSS SECTION (NOT TOSrAE) DATE: JANUARY 16, 2015 SHEET 1 OF 2 JOB NO. 5221