Loading...
HomeMy WebLinkAbout83-2033 - Site Plana I Al,IV _ 2 E STING PIER}WITH FLOATS lb } i i t ail•. tBEACH— /All,I j \ / I } b/ \ / / PILE I f MOORING BALL All,/ PILE 0 � EXISTING 0018.CONC. HEADWALL o� o 0 oFORMER s� / I -- / 80• j BOUND `\ oo00�0001 STORMWAIER \ o°°oaodo ail, • OUTFALL . WDE RAMP } EXISTING \ WITH VX16 FLOAT I / } RIPRAP WITH (2) 10" DIA. j f \ANCHOR PILES r ! ! } } jA 1 ? I ail. I PROPOSED I 6'x12' WIDER/ } J DECK SEGMENT / DREDGE E1/ / / �` L,• II �, . J PROPOSED // r // / TO —3 /A ' \ / j — } 4 WIDE PIER \/ t_ DECK EL = 7.5 ! ! A II 12' / / / / J/ _ •J I ss�`'°�y� \� � rl x� I i 3 I� /// s / / 7o•f / I �� // '= I \ Es —"�— } BEACH 4 / M(' ry BENCHMARK: � TOP OF CONC. BOUND 1 I ELEV. = 11.51 MLW 1 I I } EXISTING PIER WITH FLOATS I } } (11.01 NGw) I I f J } PLAN DREDGING NOTES 1. CONTACT CAPE COD ENGINEERING, INC PRIOR TO INITIATING WORK FOR CONFIRMATION OF ELEVATION BENCHMARK, VERTICAL AND HORIZONTAL CONTROL, AND FOR REVIEW'OF ADDITIONAL REQUIREMENTS. 2. ANTICIPATED VOLUME IS 90 C.Y. FOR A DREDGED DEPTH OF - 3 MLW WITHIN THE AREA INDICATED. 3. ACCESS ACTIVITY FOR DREDGING WORK SHALL BE BY BARGE FROM TIDAL WATERS. DEWATERING SHALL OCCUR ON THE BARGE. 4. DREDGED MATERIAL SHALL BE PLACED DIRECTLY INTO BARGED - STAGED POLYPROPYLENE FILTER CLOTH SACKS OF APPROX.1 C.Y. VOLUME FOR DEWATERING. 5. DREDGED MATERIAL TRANSPORT SHALL BE DIRECTLY FROM THE BARGE AT A SUITABLE LANDING AREA WITH DIRECT VEHICLE ACCESS. 6. AT SUCH TIME THAT THE DREDGED SAND MATERIAL FALLS BELOW SATURATION MOISTURE CONTENT TT MAY BE TRANSPORTED TO A TRUCK FOR TRANSPORT TO A SUITABLE BEACH SITE HAVING SIMILAR GRAIN SIZE CHARACTERISTICS. 7. WORK ACTIVITY LIMITS SHALL BE STAKED OR OTHERWISE MARKED OUT AND REVIEWED WITH THE DREDGING CONTRACTOR PRIOR TO INITIATING THE PROJECT ACTIVITY. 8. A SILTATION CURTAIN SHALL BE DEPLOYED WHERE NECESSARY BASED ON INSPECTION OF THE WORK EFFORT. 9. FOLLOW ADDITIONAL GUIDELINES INCLUDED IN THE TOWN OF YARMOUTH CONSERVATION COMMISSION ORDER OF CONDITIONS, MASS DEP DREDGE PERMIT AND OTHER AUTHORIZATIONS CONDITIONING THE WORK ACTIVITY. 10.WORK ACTIVITY SHALL BE COORDINATED WITH THE TOWN OF YARMOUTH SHELLFISH MANAGEMENT AUTHORITY AS DIRECTED JLAT COMPLETION THE BOTTOM CONTOUR SHALL BE LEFT NEAT AND UNIFORM CONTOURED CONDITION. w Z W SALT MARSH w � °- o I PROPOSED 4' WIDE PIER DECK EL=7.5 MLW 6' WIDE 12' LONG PIER SEGMENT 1 inch = 20 ft. PROPOSED 3x16' RAMP 10 11 11 II 12' TYP 11 II „ II II 1 1 I I i I t 1 7 I ii 11 II II II „ II ,I II II II II II II II II 11 II II II II II II II II II II II II II II II II " 11 11 II II it II II it 11 ii 11 i II li .,p 0 10 20 30 40 50 60 70 80 90 100 PROFILE A -A 1"=10' 8'x16' FLOAT PROPOSED DREDGE UNE I } r 1 RED CHANNEL MARKER #16A 1 1 It i V7 m MLW 0.0 ... - . . 110 120 130 31x8• STRINGO Yx4' w/ 21x5• 4"x4' RAIL POST 31x8 \ 101 DIA. PUNG 1. ELEVATIONS REFER TO MLW = 0.0 2. LOT LINE AND TOPOGRAPHIC DATA OBTAINED BY SCHOFIELD BROTHERS OF CAPE COD, ORLEANS, MA BENCHMARK AND HYDROGRAPHIC ELEVATION RELATIONSHIP DATA DETERMINED AND PROVIDED BY CAPE COD ENGINEERING, INC. 3. CONSTRUCTION ACCESS SHALL BE PRIMARILY BY THE RIVER WITH LIMITED ACCESS DIRECTLYTHROUGH THE PROPERTY. 4. WHERE NAVIGABLE WATER PERMITS, PILINGS SHALL BE HAMMER DRIVEN. MINIMUM PILING EMBEDMENT DEPTH SHALL BE 12 FT. S. ALL HARDWARE USED FOR CONSTRUCTION SHALL BE OF HOT DIP GALVANIZED STEEL OR EQUAL. 6. ALL TIMBER USED SHALL BE CONSISTENT WITH YARMOUTH CONSERVATION COMMISSION REQUIREMENTS: NON -CCA TREATMENT IF RESTRICTED, NATURAL WOOD OR COMPOSITE, NON -LEACHING MATERIALS. 7. SEE TYPICAL DETAILS FOR GENERAL FRAMING REQUIREMENTS. 8. DECK PLANK SPACING SHALL BE A MINIMUM OF % INCH OR AS SPECIFIED BY THE CONSERVATION COMMISSION MOORING BALL 9. CONSTRUCTION MATERIALS AND DEBRIS SHALL NOT BE STORED OR DISCARDED ON THE BANK OR BEACH. THE BEACH AND BUFFER ZONE O SHALL BE COMPLETELY CLEARED OF ANY DEBRIS ON A DAILY BASIS. 10. RAMP AND FLOAT REMOVAL SHALL BE AT A SUITABLE OFF-SITE LOCATION. THE FLOAT SHALL NOT BE STORED ANYWHERE WITHIN THE RESOURCE AREAS OR THE BUFFER ZONE ON THE PROPERTY. 11. REFER TO ANY ORDER OF CONDITIONS ISSUED FOR THIS PROJECT BY THE YARMOUTH CONSERVATION COMMISSION AND OTHER AGENCIES FOR CONSTRUCTION SCHEDULE AND ADDITIONAL PROCEDURES AND GUIDELINES. TYPICAL PIER FRAME DETAILS (NO SCALE) 'x3 LLOYD.DWG 27x4' MAIL (3) 3•41 STRINGERS I _ _ 31x81 SPOT CAP77, 74_71574�Z&�Qs _ _ I 'ox„ mz�'ti I TYPICAL PIER FRAME DETAILS (NO SCALE) 'x3 LLOYD.DWG