Loading...
HomeMy WebLinkAboutEngineered Plan - 2005i • SOIL .TEST PIT DATA: FEBRUARY. 9, 2005 SEPTIC TANK DETAIL. �50o GALLON DISTRIBUTION BOX DETAIL. NOT TO SCALE LEACHING DETAIL: NOT To SCALE SCALE TO TEST PIT HIGH GROUNDWATER COMPUTATION � NOT NO. OF OUTLETS cJ � 22.5 -1- BASED ON TP#1 NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, FINISHED GRADE o 0 0 00 0 0 0 000 ,0 0 0 0 0 a 0 0 0 0 GRD. EL. 99.8 REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE 0° 0 0 0 0 0 0 0 000 0000000 o° 0 0 0 a o 0 0 0 0 0 • TEES TO BE CENTERED UNDER MANHOLE COVER. 2" WALLS o c 90.2 DEPTH TO BOTTOM OF HOLE 12.0 2. SEPTIC TANK TO WITHSTAND H-10 LOADING REMOVABLE NOTES: EST. HIGH GW. , DATE. INDEX WELL MIW-29 UNLESS UNDER PAVEMENT, DRIVES OR COVER �+ o I OBS. PORT o° A 2/9/05 LOT SPLITS A AND B ZONE UNE TRAVELED WAYS, WHEREIN H-20 LOADING , -� 1. DIST. BOX TO WITHSTAND H-10 LOADING ® 00 50" 12' LOAMY SAND SHALL APPLY. PW e o 3 UNITS HIGH DENSITY 0 .v�•v.•+.a:•v. v v....,:•a. •� 2 UNLESS UNDER PAVEMENT, DRIVES OR 4" PVC o 1OYR 3 3 8" TEST BY: 3. ALL PIPE CONNECTIONS AND CONCRETE » T TRAVELED WAYS WHEREIN H-20 LOADING PIPE 0° POLYETHYLENE INFILTRATOR 3050 0 1 2-24 DIA CONCRETE MANHOLES 0°00 0 0 00 0 0 0 0 0 0 0 0 0 0 o° THE BSC GROUP, INC. WATER LEVEL RANGE ZONE A CONSTRUCTION SHALL BE WATERTIGHT. `t' SHALL APPLY. 0 0 0 0 __0000000000000000000000000 o a o 0 I W METAL HANDLES BROUGHT LOAMY SAND WITNESS CURRENT DEPTHOINDEX WELL(12/04) 8.6 4. FILL ALL UNUSED KNOCKOUTS WITH FTO 8" OF FINISH GRADE T 15 1OYR 5/6 ED BY: WATER LEVEL ADJUSTMENT 24" AMY VON HONE 1=�- MORTAR. T, OPENING TO BE DER 12" MIN. 6" 5CO R,5" OUTLETS 8" l 2 SLOPE OF INLET PPE E LEOR EDS 0.08 WHERE ./FT OR F» 25' EL = 97.8 PERC. RATE: WATER LEVEL RANGE ZONE B �. PLAN VIEW - LEACHING CHAMBERS •� » . . 'o ' oo 'e eo a e,� vea �-. IN PUMPED SYSTEM. CURRENT DEPTHUNDEX WELL(12/04) 8.6 3 1°� �°'�b° 2» 3. FIRST TWO FEET OF PIPE OUT OF DIST. -MIN./INCH WATER LEVEL ADJUSTMENT 2.9 4" BOTTOM ON LEVEL LOAM dt SE RAISE M.H W/ ED DISTURBED AREAS SOIL EVALUATOR 10'-6" SEWER BRICK 6" MIN. 3/4" TO BOX TO BE LAID LEVEL. 42" CRAIG FIELD AVERAGE ADJUSTED WATER LEVEL 2.4 10'-0" do MORTAR STABLE BASE 1 1/2" CRUSHED CROSS-SECTION 4. ALL PIPE CONNECTIONS AND CONCRETE DEPTH TO ADJUSTED HIGH WATER 9.6 NORMAL WATER LEVEL 12 STONE BASE CONSTRUCTION SHALL BE WATERTIGHT. 3' MAX. COMPACTED FILL 36" MAXIMUM 12"MINIM M SOIL CLASS: �. 3» o°0 0 0°0,0° °o°ooao0 0° ° 3" LAYER 115" 1 PRECAST SEPTIC TANK 7 .. 10" 14" e INLET TEE � 5'-1" INDICATES INDICATES _ _ _ • - - L.T.A.R. PERC. ® ESTIMATED MEDIUM SAND 0.74 G.P.D./SQ.FT. TEST SEASONAL HIGH - _ _ 5'-2", "4'-gz 4'-0" MIN. sg y 5�-$" 15 1/2» 2.5Y 6/6 GROUND WATER 5 -8 LIQUID DEPTH (G" oac,� NO G. WATER INDICATES INDICATES UNSUITABLE _ V OBSERVED EL - 87 8 '144"MATERIAL -.:: a :;:::.:-: a.•: •,•� :_.a 5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. T 0 PEASTONE 30 1 0§ CD fClDENS TY 0 0 ° O 24" LYETHYLENE 0 p EFFEC. W TRATOR 3050 ° 0 0 10 DE4pLEACHING MBER ° p° �'o 3/4" - 1 1/2- 47" 50" 47" WASHED STONE • GROUND WATER L 12' gs�'Oa BOTTOM ON LEVEL STABLE BASE � a 3" L` � PLAN MEW �'���' s MIN. 3/4 TO CROSS-SECTION VIEW 1 1/2" STONE PLAN VIEW CROSS-SECTION OF CHAMBER DATUM: • VERTICAL DATUM: ASSUMED } DESIGN CRITERIA: XAAAA DESIGN FLOW: BENCH MARK SET: TOP OF FOUNDATION=101.44 � �'' OF 3 BEDROOMS AT 110 G.P.B. D 330 G.P. D. • CRAIG A. PROFILE. NOT TO SCALE N/F N/F 8 No.FIELD 38039EL- KENNETH W. GABRIEL DENNIS L. LYNCH REQUIRED SEPTIC TANK: TOP A ASSESSORS MAP 40 660 GAL. TOP FOUNDATION FIRST PIPE LENGTH ASSESSORS MAP 40 33O X 200% - CONCRETE COVERS TO WITHIN TO BE SET LEVEL PARCEL 40 talo - PARCEL 31 SEPTIC TANK PROVIDED: = 1500 GAL. /EL -X 6" OF FINISHED GRADE. FOR MIN. 2' FINISH GRADE " EL=X •� 4 PVC SCH 40 �� r0� r S" PV40 $I SIZE -0F LEACHING FACILITY REQUIRED: 4" P LEACHING CHAMBER DESIGN PERC. RATE: <2 MIN./ INCH \_LmEB I=D I=G LONG TERM APPL. RATE 0,74 G.P.D/S.F. =i I=E =C 5 OUTLET H i .. 104.92' S4445'10"W ,. e : " DIST. BOX I= F , SEPTIC TANK. 5.3 SEPARATION � -0 0----0 0 o I i 330 GPD '�' 074 GPD/SF = 446 S.F. STOCKADE FENCE boo - _ POST AND RAIL FENCE EST. HIGH GROUNDWATER SIZE OF LEACHING FACILITY PROVIDED. J 99 r •s 24.1' USE HIGH DENSITY POh, ETHYLENE � / 28.8--__._ , LEACHING CHAMBERS(4 UNITS) 12 X2 X25 INVERT ELEVATIONS: � � o BITUMINOUS 'SIDEWALL 2(12'+251) X 2' = 148 N I DRIVEWAY ` BOTTOM = 12' X 25' = 300 TOP OF FOUNDATION 101.44 A 448S.F. 4„ INVERT AT BUILDING 99.19 B L 12.5 (� 608 S,F x 0.74 GPD/SF=331GPD I 4" .INVERT AT SEPTIC TANK //IN 98.25 C 4" INVERT AT SEPTIC TANK (OUT) 98.00 D I IQ9 4" INVERT AT DIST. BOX (IN) 97.80 E i s 4" INVERT AT DIST. BOX OUT 97.63 F 29.2' (OUT) 21.s' 12.6' \ co j J INVERTS AT LEACHING FACILITY: 4.8 6.2' v_\ 12.6 STOOP EXISTING ® W LOCUS INF0RMATION 4" INVERT AT BEGINNINGco N PROP OOM (10'MIN) ONEESTORY \ z OF LEACHING CHAMBER 97.5 G SHED GALLON PROPOSED T NK STOOP WOOD FRAME STOOP 'off N 11 ® o CURRENT OWNER: ARTHUR A. JAMES N/F co ELEVATION AT BOTTOM PASQUALE GUARINO ALL EXISTING SEPTIC TOFU 101SE #44 \ N �` v TITLE REFERENCE: BOOK 9032, PAGE 223 ASSESSORS MAP 40 COMPONENTS TO BE r-��. INV=99.19 cq n OF LEACHING CHAMBER 95.5 H N -- PARCEL 32 N PUMPED, FILLED AND L» x`10. w bj a PLAN REFERENCE: BOOK 149, PAGE 95 ADJUSTED REMOVED FROM SITE -BOX GROUNDWATER 90.2 00 SMH W W--__. W .....1 ASSESSORS MAP: 40 17.1'CRAWL W �� O PARCEL: 39 �`` \ NO OBSERVED GROUNDWATER m 99 , SPACE LAMP BOTTOM OF HOLE 87.8 •0 t GAS 3 z ZONING DISTRICT- R-25 z' ETER v SETBACKS: FRONT 30' Z '� SIDE 15 - 0 + H REAR 20' Q .(/)(-)0 o �o I MIN 24.2' ELECTIC ,--� { MINIMUM LOT SIZE: 25,000 S.F. VARIANCES REQUESTED: wo��z o �� OAK METER / ° ` EXISTING LOT AREA: 9,507tS.F. `'Q�Ir� j I .� z \ w rn PROPOSED G ONyy / \ OVERLAY DISTRICT: NOT IN A ZONE it NONE mo>��c 0 `� 12'X25' ` Q o o►Q w 1 1 S.A.S. N/F Gy - FEMA FLOOD ZONE "C" AS SHOWN ON a m z t ARTHUR A. JAMES G w a ZONE DISTRICT: PANEL #250015 0005 D N Q jri + ASSESSORS MAP 40 N O DATED JULY 2, 1992 16.2' - -�-� PARCEL 39co CD FLOOR PLAN: 9,5o7tS.F. ,00sco ON m a 9y� C "w I ROCU S PLAN: NO SCALE E STOCKADE FENCE 13 13 oyw POST AND RAIL FENCE FAMILY 104.88' N45'13'50"E UPL CD ROOM N IF a I RD z I ND MOF N/F ®�`� ♦ Q o BED N/F RAVVA LLC i DAVID J. z 2 #3 BATH JOHN F. RYAN ASSESSORS MAP 40 CIVIL CRI SPIN KITCHEN ASSESSORS MAP 40 PARCEL 38 32112 z C PARCEL 33 95 f N,�� cn DIT CL HALL G�, o o 004 LOCUS c, 4 g o DINING ' rn O LU BED BED ROOM ���g #2 #' Roots goo PLAN VIEW 0 SCALE: 1' 10 FEET ; 28 o N n[E@EEI 0 5 10 20 FT. ELf EB C _ 4�EALTH IEP`. i REVISIONS NO. DATE DESCRIPTION GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL. 6. REPLACE ALL EXCAVATED MATERIAL WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A #4 SIEVE, SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL. UP TO 45% BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE #4 SIEVE. SIEVE ANALYSES ALSO SHALL BE PERFORMED ON THE FRACTION OF FILL SAMPLE PASSING THE #4 SIEVE, SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE FOLLOWING SPECIFICATIONS: 100 % MUST PASS #4 SIEVE (4.75 mm EFFECTIVE PARTICLE SIZE) 10%-100 % MUST PASS #50 SIEVE (0.30 mm EFFECTIVE PARTICLE SIZE) 0%20 % MUST PASS #100 SIEVE (0.15 mm EFFECTIVE PARTICLE SIZE) 0%-5% MUST PASS #200 SIEVE (0.075 mm EFFECTIVE PARTICLE SIZE) 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTIUTY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION -AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. 9. EXITING INVERTS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TO CONSTRUCTION 10. THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. ;N .' rBSC GPOUP 657 Main Street, (RT. 28) Unit 6 W. Yarmouth Massachusetts 02673 508 778 5919 PROJECT TITLE: 0(,Ij DESIGN FOR SEWAGE DISPOSAL SYSTEM REPAIR ;11 CANDLEWOOD LANE W. YARMOUTH MASSACHUSETTS PREPARED FOR: RICHARD CAPEN CAPEWIDE ENTERPRISES, LLC P.O. BOX 763 CENTERVILLE MASSACHUSETTS (508) 428-4028 DATE: FEBRUARY 11, 2005 COMP. DESIGN: K. HEALY CHECK: D. CRISPIN DRAWN: P. HAGIST FIELD: D. GAZZOLO / J. McCARTIN FILE N0. 8792-SEP.DWG IDWG NO. 5600-01 SHEET 1 OF 1 JOB N0.4-8792.00