HomeMy WebLinkAbout83-2045 - Site Plan1. PRIOR TO LANDSCAPE IMPROVEMENTS, INSTALL EROSION CONTROL BARRIERS (SILT SOCK/ SILT FENCE) IN LOCATIONS SHOWN ON PLAN. EROSION CONTROL BARRIER TO REMAIN IN PLACE UNTIL PROJECT IS COMPLETE AND ALL DISTURBED AREAS HAVE REESTABLISHED VEGETATION. EROSION CONTROL BARRIERS TO BE MAINTAINED BY CONTRACTOR THROUGHOUT CONSTRUCTION. 2. LOCATIONS OF WATER, SEWER, TELEPHONE, ELECTRIC, OR GAS LINES ARE APPROXIMATE AND FOR REFERENCE ONLY. CONTRACTOR SHALL INSPECT SITE AND FOLLOW ALL DIG SAFE MARKINGS. CONTRACTOR SHALL NOTIFY ALL UTILITIES PRIOR TO EXCAVATION. EXISTING SEWAGE DISPOSAL SYSTEM SHOWN PER BOH RECORD PLAN. CONTRACTOR TO CONFIRM SYSTEM LOCATION. VEHICLES SHOULD NOT BE DRIVEN OVER SYSTEM UNLESS CONTRACTOR HAS CONFIRMED THAT ALL COMPONENTS ARE H-20 RATED. 3. SITE TO BE ACCESSED VIA THE EXISTING DRIVEWAY. ALL CONSTRUCTION MATERIALS ARE TO BE STORED ON THE EXISTING DRIVEWAY. 4. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EROSION CONTROL AND PROTECTION OF OFF SITE AND ON SITE DRAINAGE STRUCTURES UN11L COMPLETION OF SITEWORK AND ESTABLISHMENT OF STABILIZED VEGETATIVE GROUND COVER. 5. THE CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING MEASURES DURING THE DAY TO DAY OPERATION AT THE SITE. THE SITE SHOULD BE POLICED DAILY TO REMOVE ANY UTTER OR DEBRIS. 6. TEMPORARY SOIL MATERIAL STOCKPILES SHALL BE SURROUNDED WITH SEDIMENT BARRIER ON THE DOWNGRADIENT SIDE TO PREVENT DISCHARGE OF SEDIMENT FROM SITE. MATERIAL STOCKPILES THAT AREIN PLACE FOR AN EXTENDED PERIOD OF TIME SHALL BE STABILIZED WITH VEGETATION, MULCHING, EROSION CONTROL BLANKETS, AND OTHER MEASURES THAT ARE NECESSARY TO PREVENT THE DISCHARGE OF SEDIMENT FROM THE PROJECT SITE. 7. IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS. 8. UTTER, CONSTRUCTION DEBRIS, AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE. 9. STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. 1. WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS, STABILIZATION MEASURES MUST BE INITITIATED AS SOON AS PRACTICABLE. 2. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT POR11ON OF THE SITE. 10. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS SHALL BE REVEGETATED AND/OR RE-ESTABLISHED. K 9" FLTREXX SILTSOXX OR EQUIVALENT . SLOPE O PE 2" X 2" X 3' WOODEN STAKE 10' ON CENTER (MAX.) AREA TO BE PROTECTED 3 - SIL T ' SILT SOCK DETAIL NOT TO SCALE FILTER FABRIC STAPLE FABRIC TO POST. SLOPE � BURY BOTTOM OF FILTER FABRIC IN 6" x 6" TRENCH N SUSAN D. ROD ASSESSORS MAP 101 PARCEL 174 1" x 2" x 4' WOODEN STAKE 6' ON CENTER (MAX.) SILT FENCE DETAIL NOT TO SCALE N/F BLUE ROCK LANDING ASSOCIATION ASSESSORS MAP 102 PARCEL 11 APPROX. LOCATION OF EXISTING SEWAGE DISPOSAL evc�u oro o A u orrnonc 100' OFFSET FROM MHW (RIVERFRONT AREA) PROPOSED TREE (TYP.) _ (SEE L1.0) AREA OF VEGETATION MANAGEMENT (SEE SHEET L1.0) BASS RIVER (TIDAL) FLOOD EBB � � •��nt fr l 1 ` r c SPARTINA ALTM41 LORA /'..: SPARTINA PATENS AL • N BASS RIVER EXIT 9 om COASTAL ENGINEERING COMPANY, INC. I 260 Cranberry Hwy. Orleans, MA 02653 I IIPPFa 508.255.6511 Fax: 508.255.6700 s � l YARMOUTH, MA KEY MAP NO SCALE MLW PER FIELD SURVEY PLAN REFERENCES: ASSESSORS MAP 102, PARCEL 13 TOWN OF YARMOUTH CONSERVATION ASSESSORS MAP 102 PLAN BOOK 395, PAGE 50 PARCEL 12 PLAN BOOK 376, PAGE 82 NEW CORRIDOR REFERENCE PLAN TITLED: PROPOSED VISTA PRUNING AND LANDSCAPING PREPARED FOR: ROBERT R. ARMSTRONG PREPARED BY: COASTAL ENGINEERING CO., INC. REV. DATE: 10-04-07 AUNT POLLY'S COVE (TIDAL) 8.0+V r ♦ Xr rsc -,• tt,s W3 i 2 r h� o�,r _EXIST. .. '` �. \ 11,.:6' PINE t i*ti G TIM9ER RET. sem+ PROPOSED •� (RQna�)° i I t / / WALL BELOW . �' S KNEE WALL > ( L (24 MAX. HEIGHT) 4` I T.O.W EL -18.3 �� grafi ^2, I TREE TO BE I j ERDSION CONTROL ;i � B.O.W EL=VARIES 'sae ` i REMOVED (TYP.) I BLANKET TO BE� 'r I y g P INSTALLED WHERE PROPOSED SLOPE EXCEEDS 3HAV 1 OVERLOOK ' ` ! TERRACE W4 f ( / AREA OF VEGETATION n j �2 eye % J 1 MANAGEMENT 5 l (SEE SHEET 1-1.0) r gA� PROPOSED/ W5 / HED / \ € PSZPX \ / SITTING AREA ft`ox e 1 J { EXISTING MEW CORRIDOR �� IqV6 / 1s P"` I . ` /. I _ ^',� 'ALLOWED TO / f NATURALIZE TanoN �; • 1 If �``�ccF � l � I 1 s � / � • .0) Y LPOTR(5SELCj ;ER o r ASSESSORS MAP 101 LANDSCAPE NOTE: qhs i ` PARCEL 181' FOR MORE INFORMATION REGARDING RESTORATION PLANTINGS i L 1 i wa AND VEGETATION MANAGEMENT AREAS SEE PLAN TITLED IK �`>� `� `\ \ ` •\ `, I t ;� `, 1 °RESTORATION PLAN", "L1.0", FOR 45 MOORING LANE IN \ I YARMOUTH, MA, PREPARED FOR THE DONAHUE RESIDENCE, PREPARED BY JENICK STUDIO & DATED 11-17-2015. , PLAN /Ws 1 inch = 20 it. DATUM NOTE: ELEVATIONS SHOWN HEREON ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD 1988) FLOOD NOTE 2014 FEMA FLOOD ZONE AE (EL. 11) (NAVD 88) AS SHOWN ON FEMA FIRM MAP #25001C0591J EFFECTIVE DATE JULY 16, 2014. E F `a 9 O LEGEND W Q 0 EXISTING W o BOUND ~ 0 CATCH BASIN ® ELECTRIC METER Q UGHTPOST y -0 UTILITY POLE GUY POLE w FENCE --10-- CONTOUR W z — — EDGE OF MARSH a w O C7 al PROPOSED H U F 18.0+ SPOT GRADE o ~ 10 CONTOUR SCALE AS NOTED DRAWING FILE C16322-02.dwg DATE 11-18-2015 DRA WN BY TLM/MJB CHECKED BY 0 N w OF I SHEETS o PROJECT NO. 016322.02 U