Loading...
HomeMy WebLinkAbout83-2045 - Site Plan002ISTRUCTION & EROSION CONTROL NOTES I TO LANDSCAPE IMPROVEMENTS, INSTALL EROSION CONTROL BARRIERS (SILT SILT FENCE) IN LOCATIONS SHOWN ON PLAN. EROSION CONTROL BARRIER TO IN PLACE UNTIL PROJECT IS COMPLETE AND ALL DISTURBED AREAS HAVE 3LISHED VEGETATION. EROSION CONTROL BARRIERS TO BE MAINTAINED BY NOR THROUGHOUT CONSTRUCTION. TIONS OF WATER, SEWER, TELEPHONE, ELECTRIC, OR GAS LINES ARE (MATE AND FOR REFERENCE ONLY. CONTRACTOR SHALL INSPECT SITE AND ALL DIG SAFE MARKINGS. CONTRACTOR SHALL NOTIFY ALL UTILITIES PRIOR TO TION. EXISTING SEWAGE DISPOSAL SYSTEM SHOWN PER BOH RECORD PLAN. NOR TO CONFIRM SYSTEM LOCATION. VEHICLES SHOULD NOT BE DRIVEN OVER UNLESS CONTRACTOR HAS CONFIRMED THAT ALL COMPONENTS ARE H-20 TO BE ACCESSED NA THE EXISTING DRIVEWAY. ALL CONSTRUCTION MATERIALS BE STORED ON THE EXISTING DRIVEWAY. JG CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EROSION L AND PROTECTION OF OFF SITE AND ON SITE DRAINAGE STRUCTURES UNTIL 9" FILTREXX SILTSOXX OR EQUIVALENT _� 2" X 2" X 3' WOODEN STAKE 10' ON CENTER (MAX.) AREA TO BE PROTECTED 3' SILT SOCK DETAIL NOT TO SCALE ko ko M l ROUTE 6 X\ EXIT 9 BASS RIVER QP` LNG `�..�.. , is PNK R ' COUNR RD. BASS RIVER LOCUS..) "1 FLOOD YARMOUTH, MA EBB KEY MAP TION OF SITEWORK AND ESTABLISHMENT OF STABILIZED VEGETATIVE GROUND NO SCALE \ � F,s4i �� SPART(NA ALTERN1FtORA. MtW PER FIELO SURVEY i FILTER FABRIC 1. S x 2• x 4' WOODLENTEN.13 _ .. PLAN REFERENCES: CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING MEASURES DURING THE STAPLE FABRIC STAKE 6' ON CENTER � �-. _'- ��'--" DAY OPERATION AT THE SITE. THE SITE SHOULD BE POLICED DAILY TO To POST.(MAX.)(MAX. � ii ��� t � <,F,, .�� � sL� ANY LITTER OR DEBRIS. i — EXISTING �� � (r PE RAM .k . i ASSESSORS MAP 102, PARCEL 13 ORARY SOIL MATERIAL STOCKPILES SHALL BE SURROUNDED WITH SEDIMENT _ f AND FLOAT =,' TOWN OF YARMOUTH CONSERVATION "- '(a) �- ASSESSORS MAP 102 PLAN BOOK 395, PAGE 50 ON THE DOWNGRADIENT SIDE TO PREVENT DISCHARGE OF SEDIMENT FROM _s My SPARTiNA PATENS PARCEL 12 W v -I _ PLAN BOOK 376 PAGE 82 IATERIAL STOCKPILES THAT ARE IN PLACE FOR AN EXTENDED PERIOD OF TIME SLOPE a �SM'-4 ' " � � . �, ' IE STABILIZED WITH VEGETATION, MULCHING, EROSION CONTROL BLANKETS, AND — _ _ Wit''"` VIEW CORRIDOR REFERENCE PLAN TITLED: u1E PROJECT THAT ARE NECESSARY TO PREVENT THE DISCHARGE OF SEDIMENT ti f \ j • M� �� — PROPOSED VISTA PRUNING AND LANDSCAPING 1E PROJECT SITE. `7 BURY BOTTOM OF DIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF FILTER FABRIC IN j _ _ _ PREPARED FOR: ROBERT R. ARMSTRONG t t a . t�t, IT MUST BE REMOVED Al A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE 6" x s• TRENCH _ — PREPARED BY: COASTAL ENGINEERING CO., INC. REV. DATE: 10-04-07 SM -3 AREA OF VEGETATION / .r R CONSTRUCTION DEBRIS, AND CONSTRUCTION CHEMICALS THAT COULD BE j / MANAGEMENT = yy TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT s > (SEE SHEET L1.0) r 4 DATUM NOTE: ILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE IN /' / ' / \\ / / / p ! AUNT POLLYS COVE ELEVATIONS SHOWN HEREON ARE BASED SILT FENCE DETAIL rp ON THE NORTH AMERICAN VERTICAL IS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED, � r \ ( ) NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT NOT TO SCALE � \ F PROPOSED LIMIT OF SFQ _ , ADAL DATUM 1988 (NAVD 1988) 1 OF OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.ti a etx WORK/ SILT <& 100' OFFSET FROM 1d SEDIMENT BARRIER yF IE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR MHW (RIVERFRONT .^ra ; ' c,0 %Fi .= F' / AREA) '®--__ ��9� �. �Q e FLOOD NOTE 'EN GROUND CONDITIONS, STABILIZATION MEASURES MUST BE INITITIATED LOON AS PRACTICABLE. N/F /' , ° \ \ \PROPOSED GRAVEL # + p -2 2014 FEMA FLOOD ZONE AE EL 11 BLUE ROCK LANDING ASSOCIATION r' , / STAEPFER STONE 4 \ ♦♦ ♦ , FLOOD ( ) IE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY ASSESSORS MAP 102 / x : ♦ (NAND 88) AS SHOWN ON FEMA FIRM IED, AND EARTH DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, PARCEL 11 '�`,' \\ c, ♦/` �.♦€jl RAMPNG � P. MPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT ` MAP LY 16, 2114. EFFECTIVE DATE ORT10N OF THE SITE. / / _ / \ ♦ `"< ♦ 0 1 EBB JULY 16, 2014. Q, ®., 10• SPRUCE y v r Q i "n Gxk zb...w ♦ t�E PROPOSED TREE IYP. Q� / \ ♦ (REuovE) ON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS SHALL BE ( } °'' / \ 1_ r. AREA of vEGErATION ` (SEE L1.0} t$ �' `� ♦ .° '= MANAGEMENT FATED AND/OR RE-ESTABLISHED. ♦ ♦ ( ) z x o`O ° \ m sH ucE \ SEE SHEET 1.1.0 -,.' �'" -,' a o AREA OF VEGETATION ��''� / r.♦ : -, .:� (REno E) MANAGEMENT i� w i " ® ® u �. (SEE SHEET L1.0) PROPOSED i ,. ^' ^'' _^' �. @ / '. PRO`_"'^, c—^,. ' � •. '"+�....., _.. en - r'�/ter• STONE STEPS l FOOTPWOODLAND If ATH i„16���-- �•, � �'� N APPROX. LCCAnON OF c`= — — — — — - - ,1,_.✓� ` (TYP.) ~I _�... ,:. s� o”" EXISTING SEWAGE DISPOSAL ) / _ z .y c} SYSTEM PER B.O.H. RECORDS // a�aSET SOq( aaa?ar�aa ..r a {� ♦ •' =?,' i j /y t; X„<:= r" ryo ♦ 22 ?0►1 ' as g T., ♦ STING SITE BENCHMARK: i EXIST•-- / \ _ r- . _ ,. F, �► �€ DIRT/MULCH TOP OF CONCRETE BOUND ''• _ _GEN• '� 1 ` " i 6 .o' PATH '� io�elN g' CAS EROS ON CONTROL ♦ v \ EL=25.93 NAVD88 PAD i rti i p- E �'' 14' PINE n ~ ♦ "^> �'`? ( ) BLANKET TO BE INSTALLED WHERE // r ♦ t +,' 4iREaovE) \ AREA of VEGETATION f \%<\ ei` SLOPE EXCEEDS 3H:1V / %i 24'3 RcT //r �� MANAGEMENT 2 / ♦ R`. ' X X g . ` (SEE SHEET L1.0) A ��'9 A 1 r `♦ aWAtl o 'o . • \PROPOSED < ozr PROPOSED DRY \ WOODLAND moo P4 \ d i LAID STONE PATH :� ALT; Z �'� FENCE DUFF/ MULCH 1 \ , C -= �' ENCLOSED �, - \ ••. . i... <% x O3'�� _ o / { / F ems: + 5.3 OUTDOOR LEGEND 10 1 �b/�R. irr a SNO r`R p. r y, / tDGE OF GGE f ✓ r� p �� i �,c4i' 9l A { ti EXISTING MEW CORRIDOR 2007 t 14 OAK L 200' OFFSET FROM �" t EXIST. e rf - `/G,aa ^¢s -_ \ -r--- \ TO REMAfN( ) \ , \ , PROPOSED LIMIT OF MHW (RIVERFRONT — RET. WALL 77 AREA) ® ! s �I I I, P fi , <. x 1� �- �`J 16. ` ` € WORK/ SILT FENCE / EXISIING Vol f STONE v ' 1 �{ r 16.0+ {e4"'! SEDIMENT BARRIER \" r. RET. WALL '� t I i l : �� ,� � \ i `\ r 'lF F' iE �" � ` l� 0 `W3 / BOUND N. €4" G.`-<. ''k /% EXIST. .` \� � •zo P'.!.E � I t M1p y� 3 ` f i` 6' PINE AAA PROPOSED ' u £ TIMBER RET. 1 / CATCH BASIN — D (( .. ,___—_----• ". '',c �.. ' € y " ' " .3 I c :. `� €• `. `` i c' R _ i' s a cat KNEE WALL ` I (RE1eo�E) I P \ `, Ir 1 m� 24• MAX. HEIGHT) t e4 / � i\ g "s [ : i I _ , <r. 1 / ELECTRIC METER ` a `tr \ V'tT ( (TREE TO BE / 'x� € t EROSION CONTROL : i t \ T.O.W EL=18.3 I REMOVED (TYP.) i I B.O.W EL=VARIES '€ 4V <1 v o a € T•. BLANKET TO BE v, € l Z I € INSTALLED WHERE PROPOSED_ - t I LIGHTPO$T / HELL , ' I SLOPE EXCEEDS 3HAV 1 OVERLOOK C ` x yihb,'' € \ TERRACE ? % ' i t I ( W4 / C} UTILITY POLE DRIVE - � .'g �\ ( i I � , t `�' , ` 1 , ( STONE „�.`i ) rx £ -- ---a / 1 l / _.... .-....-. � �� RET. WALL `'cr ,�°' � i � �r��� � ' �i t j'.... �� i �i �--'--��;;� !� � ��� /) � -w GUYPOLE REA aF VEGETAl10N 2.r / / j XSa ;Ir ',. MANAGEMENT �F I (SEE SHEET L1.0) gP�Y / PROPOSED / WS 1 / / / _x_ FENCE PROPOSED ZP\ r i / / l AVEL t `'� p ,r GAPS J � � SITTING AREA j/ l --10-- CONTOUR EDGE OF MARSH ��� rr� ��..• ��' A'\�`vr•�� ,iA�� I t ' �44� 1 -1t � �e�i fL � I� - j .'' � .r / - O EXISTING VIEW CORRIDOR rI ALLOWED TO / F- f i NATURALIZE / / PROPOSED A—a �. `ter zzcv 7 '€ t1„ i � i E' t 100' FROM TOP OF \\ ---- 1 1 (v' 1 f i / { 18.0+ SPOT GRADE AREA OF VEGETATIONk' COASTAL BANK \ o#' MANAGEMENT r e / f / 147 /i / / 10 CONTOUR EXISTING CHAIN �2 (SEE SHEET 1.1.0) r �� �I. F i LINK FENCE TO A +a eAt� BE REMOVED 200' OFFSET FROM i 1 I R`USSELLIL POTTER N/F MHW (RIVERFRONT "`4 i€ + / LANDSCAPE NOTE: 50' FROM TOP OF �-',� { I A ESSORS AAP' 101 Q _ j 1 1 / �ql COASTAL BANK `z.fi.z1 PARCEL181 i, SUSAN D. ROD AREA) a` OAK ASSESSORS MAP 101 m 1 i i ( ( j 1 1 FOR MORE INFORMATION REGARDING RESTORATION PLANTINGS - PARCEL 174 — — I t ( ; , W8 AND VEGETATION MANAGEMENT AREAS SEE PLAN TITLED , „ TOP OF \ 0 i `RESTORATION PLAN-, 11.0% FOR 45 MOORING LANE IN t COASTAL BANK ` 1 ( - O ( ( i L YARMOUTH, MA, PREPARED FOR THE DONAHUE RESIDENCE, PREPARED BY JENICK STUDIO & DATED 11-17-2015. PLAN 20 10 0 20 60 r�p'� "< \ 1 inch = 20 ft. ISSUED FOR REGULATORY REVIEW 11-18-2015 NOT FOR CONSTRUCTION COASTAL ENGINEERING COMPANY, INC. 260 Cranberry Hwy. Orleans, MA 02653 508.255.6511 Fax: 508.255.6700 R. 0 5 i O O W (�� � O W QU O O O aQ O� W W 0_4 P4^ U O � W SCALE AS NOTED DRAWING FILE C16322-02.dwg DATE 11-18-2015 DRA WN BY TLM/MTB CHECKED BY h 0 N U • • 8 W � _L OF _L SI -LEETS o PROJECT NO. C16322.02