Loading...
HomeMy WebLinkAbout83-2052 - Site Plan002LEGEND 99- EXISTING CONTOUR X 99.1 EXIST. SPOT ELEV. -F99-1- PROPOSED CONTOUR 99 PROPOSED SPOT EL. TH1 LINER TO BE PLACED ALONG REMOVAL LIMIT TEST HOLE 2>7 SLOPE OF GROUND UTILITY POLE FIRE HYDRANT NOTE NOT ALL SYMBOLS MAY APPEAR IN DRAWING *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM 1 > � 1:7 m 0 0 0 U RUN POND (TIDAL) ti 13-314 SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 3 BEDROOMS 0 110 GPD = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 USE A 1500 GAL. SEPTIC TANK LEACHING: SIDES: N/A BOTTOM 30 x 15 (.74) = 333 GPD TOTAL: 450 S.F. 333 GPD USE 4" PERF. PVC PIPE AND STONE LEACH FIELD DIMENSIONS: 30' x 15' x 0.5 DEEP SEE DETAIL 11 v 1 1 1 1 Y AV w1 ! 2 7 LOT 1 17,765+/- SQ. FT. 0.41+ ACRES (UPLAN, /�-� APPROX. A WETLAND 0�$f AC. OTAL m 11 4/ 19 LOT 2 14966+/- SQ. FT. / 0.34+/- ACRES SYSTEM PROFILE (NOT TO SCALE) PROVIDE WATERTIGHT ACCESS COVERS TO WITHIN 6" OF FIN. GRADE F9 - 5�9 27 SLOPE PRECAST H-10 RISERS (TYP.) aSCHao Pvc 2r 4"0SCH40 PVC PIPES LEVEL 1ST 2' 148.55' TEE 1500 GAL H-10 TEE - SEPTIC TANK 8'30, 75' oo°o"6" MIN. SUMP a'UO. LEVEL °°°° ° 7.95' 5.2 ACME OR EQUAL GAS B.AFFE :: oao'ooua ^ 8.1 7.98' 0°0°0°0°0°0°0°0°0°o°0°0a 0°00000°0°0°O°O°O°O°O°Oa 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 [21) WATER TEST D'BOX FOR LEVELNESS ( 7 SLOPE) (--L-% SLOPE) (-L-% SLOPE) FOUNDATION- 15' - SEPTIC TANK 15' D' BOX 5' FLOODZON DESIGN FO ND CORDWELLIN� AND C�ARA'GE REQUIRED ( THERS) NOTE: F)JAL GRADING BE INDANCE WITH FE)MA EQUIREMENT NO BASEMENT AL ED. I.E. VENTED CRAWLSPA E TO AV SLAB AT R ABOVE OUTSIDE GRADE, 1 SMAR ENT PER 200 SF CRAWLSPACE\LOC WI 12" OF GRADE 2 SIDES. DE STAKED SILT FENCE ALONG ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC TAPE OR COMPARABLE MEANS FOR FUTURE LOCATION. VENT WITH CHARCOAL FILTER ZEOUIRED OVER SYSTEM Offll Jf� PROVIDE INSPECTION PORT TO WITHIN " OF FINAL GRADE 2" DOUBLE-WASHEDPEASTON 40 MIL LINER 5' MIN. OFF LEACHING, TOP AT OR GEOTEXTILE FABRIC EL. 8.5, BOTTOM AT EL. 4.5 So^000'pg=oooe0000000po oo°% 000a000'00000°o °4" PVC SAT .005'SLOPE o ET /' 01°"° )N 6" DOUBLE WASHED 3/4"- 1 1/2" STONE J 6.0' TIDALLY INFLUENCED GROUNDWATER ELEV. 1.3' MONITTAKEN OOING VERNALL SET AND FULL MOON CYCLE READINGS NOTES (HIGHEST TIDES OF THE MONTH) 1. DATUM IS NAVD 88 LEACHING FACILITY 2. MUNICIPAL WATER IS AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H-10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED 5' BENEATH AND AROUND THE PROPOSED LEACHING FACILITY. \ 12. WETLAND FLAGGED BY HAMLYN CONSULTING. 13 ROOF RUN-OFF TO BE DIRECTED TO DRYWELLS MONITORING 5' REMOVAL OF UNSUITABLE SOIL REQUIRED R I SET ROUNDWATEREADIM AROUND PERIMETER OF LEACHING FACILITY, DON CYCL DOWN TO SUITABLE SOIL LAYER. REPLACE WITH CLEAN MED. SAND, TO MEET SPECIFICATIONS OF 310 CMR 15.255(3) PROVIDE APPROXIMATELY 88' OF 40 MIL LINER TO BE PLACED ALONG REMOVAL LIMIT cll TOP AT EL. 6.-3\BOTTOM AT EL 4.5 -i i13 - V1 SWALE t4 ...................... �:::::.�:":�::::':.' 6 \ ....... .......... j UR .\ D ........................ j S 8 1.1\\ E .:... DRNY EWA..: •::.: i::::.:::: �-i:• F SLAB c PROP. DWEL\\ING SDErDDE K MIN. TOP F1J4 / WASHE j ELEVATION 12.2'STONE _ UNDER0 j SLAB EL. \ PROP. WORK LIMIT 6. UNE OF SILT FENCE& STAKED \ STRAWBA ES V � \ j SWALE 1 4 - 1 /-I UTIL POLE ---\ � „ J OR TO DRIP TRENCHES Qo t cA 1 �o ow sf. m � o � c 4 m F, F, �a Locus a SGJtn 5h Nantucket Sound LOCUS MAP NOT TO SCALE ASSESSORS MAP 34 PARCEL 266 LOCUS IS WITHIN FEMA FLOOD ZONE AE(EL 12) AS SHOWN ON COMMUNITY PANEL #25001CO589J DATED 7/16/2014 SITE IS IN AN OPA, NO FED. FLOOD INSURANCE AVAILABLE WETLAND FLAGGED BY HAMLYN CONSULTING ZONING SUMMARY ZONING DISTRICT: RS -40 PROVIDED MIN. LOT SIZE 40,000 SF* 17,765 SF UPLAND MIN. LOT FRONTAGE 150'* 91.00' MIN. FRONT SETBACK 30' 67.5' MIN. SIDE SETBACK 20'(6'*) 20.2' MIN. REAR SETBACK 20' 268' *LOT CREATED 12/1/65 (GRANDFATHERED) SITE IS NOT LOCATED WITHIN MESA/NHESP MAPPING TEST HOLE LOGS ENGINEER: LISA LYONS, RS WITNESS: SUSAN RASK, RS DATE: 6/1.5/05 PERC. RATE _ < 2 MIN/INCH CLASS I SOILS PERCOLATION TESTING PERFORMED 8/31/05 BY RICK JUDD, RS, AMY VON HONE, RS WITNESSING; RATE IS < 2 MIN/INCH IN LS LAYER S ` II 11 BENCHMARK - CTR. OF CATCH p" Q ELEV. 4 0" ELEV. BASIN ELEV. = 5.06' (NAND 88) 1 , FILL A/E 9" MS ® A/E 1OYR 3/1 LS 18 i� 1OYR 5/1 � � I 22" B B LS ��) LS tOYR 4/3 ALONG PROPERTY LINE i 1 ARREAL 1 OYR 4/3 40" 1.36' DRAIN e 4-.A 39" 1.55' 8 _ __ /ZN OFM SPEED UMIT SIGN ..,.,S�oF r✓q : a`iH OF MS /�.z ^ass /y�`�� �Ssgc C 41. e C . t3e' EL .� DANIEL �_� DANIELA 9y4. ,�°2 DP.NIELA.9y DANIEL.'' A. 'fm EL. .) MS MS 'o OJALA '� la OJA4:4" o710YR:5/4 1.13CIVIL ° " CIVIL ; oNo 4098042" o s w° r 1.2' Nb. 4B No. eG 8f1q 502 UTIL POE tpSSe�a4� . O�orER�?�-��s"\gN�°P 1 r, a^L_ - 7 -� /roYv rr 2.5Y 5/3 120" -5.2 120" -5.3' 1 DATE DANIEL A. OJALA, P.E., P.L.S. 11 TITLE 5 &TE PLAN 5 I, I off 508-362-4541 fax 508-362-9880 downcope.com 0 down cape engineering, Inc, civil engineers land surveyors 939 Main Street ( Rte 6A) YARMOUTHPORT MA 02675 OF #145 SOUTH STREET SOUTH YARMOUTH PREPARED FOR VINCENT JAMESON DATE: 12-28-2015 Scale:1 "= 20' 0 10 20 30 40 50 FEET 13-314 JAMESON.DWG