HomeMy WebLinkAbout83-2055 - Plan of LandTREE REMOVAL KEY \
1. DBL. EASTERN RED CEDAR 7" - WIND FELLED, OCT. 31, 2012
2. DBL. BLACK CHERRY, 10" & 12"
3. 15 " BLACK OAK
4. 9 E.R. CEDAR
5. 6" E.R CEDAR
6. 4" ORNAMENTAL(CRAB APPLE) /
7. 11" E.R. CEDAR /
8. 15" E.R CEDAR de
9. DBL BLACK OAK 5" & 6" °
0M
LONE
Alt VI
zaVE Aly
O �
`r
r I
3
ill
S ZONE 'B"
/ INVASIVE PLANT MANAGEMENT NOTES
♦ GENERAL DESCRIPTION:
♦ VEGETATION RECLAIMATION IN THE HATCHED AREA SHOWN ON THE PLAN SHALL BE MANAGED BY BARTLETT TREE EXPERTS
OF OSTER VILLE, MA. BY CONTRACT WITH THE OWNER
1 THE BUSH HONEY -SUCKLE, BURNING BUSH EUONYMOUS, BITTERSWEET AND PRIVET, WHERE FOUND SHALL BE CUT LOW AND
DABBED WITH APPROVED HERBICIDE IN ACCORDANCE WITH A PROTOCOL PROVIDED TO THE YARMOUTH CONSERVATION
COMMISSION PRIOR TO WORK BEING DONE.
♦ ALL WORK SHALL BE DONE UNDER THE DIRECT SUPERVISION OF BARTLETT TREE EXPERTS,
SEE VEGETATION ♦ ALL SLASH BRUSH AND DISCARDS SHALL BE COLLECTED AND REMOVED FROM THE ISLAND ENVIRONMENT.
MANAGEMENT NOTES ♦ IN THE AFFECTED HATCHED ZONE THE SPECIFIC PLANT COUNT FOR REPLACEMENT SHALL BE ESTABLISHED ON A ONE - TO -
• FOR TREATMENT OF ONE BASIS FOR THOSE PLANTS REMOVED. SUCH NATIVE SHRUBS AS ARROW WOOD VIBURNUM NORTHERN BAYBERRY, BEACH
' mss• HATCHED AREA PLUM, AND OTHER NATIVE COASTAL HARDY SPECIES THAT ARE CONSIDERED ACCEPTABLE FOR THE COASTAL BUFFER ZONE.
A THICKET OF DENSE, WOODY NATIVE SHRUBS AS THE UNDERSTORY FOR THE CEDAR WOODS IS THE DESIRED OUTCOME.
♦ SHRUB SIZE SHALL BE NO LESS THAN 2 GALLON
• ♦ ALL PLANTING HOLES SHALL BE PROPERLY PREPARED IN ACCORDANCE WITH STANDARD LANDSCAPE PRACTICE.
♦ PROVIDE WATER AT REGULAR INTERVALS TO ALL PLANTINGS. DEEP WATERING IS RECOMMENDED FOR THE FIRST 4 WEEKS,
AND APPROX. 1" OF WATER PER WEEKDURING THE FIRST GROWING SEASON.
♦ SHRUB LAYER SHALL BE MANAGED ON A SEMI ANNUAL BASIS FOR INVASIVES MANAGEMENT INSPECTION AND SHRUB PRUNING
• ! TO FOSTER ROOT GROWTH.
' les
- AA'
• ' i i \ REMOVE MC. METER
AND SERVICE LINE
% FLOODDG,�.,
/ V
LOCATED GARAGE `
tSTORY `.
i -
Q7ST. Op� )
\ J/ 5�.4 GARAG ` I I • ` P�
LOCUS
LENTS BAY
le
YARMOUTH, MA
KEY MAP
GENERAL NOTES NO SCALE
1. ELEVATIONS REFER TO NGVD 1929. USE THE BENCHMARK WHICH IS THE
SOUTHEAST CORNER CONCRETE PROPERTY BOUND MARKER
2. TOPOGRAPHIC AND LOT LINE DATA PROVIDED BY DOWN CAPE ENGLVEERING, INC
YARMOUTHPORT,MA.
3. PRIOR TO CONSTRUCTION -RELATED WORK ACTIVITY THE WORK LIMIT SHALL
BE FITTED WITH THE APPROPRIATE SILT FENCE, STAKED FABRIC, BACKED UP BY
STAKED STRAW BALES. THE SILT FENCE SHALL BE MAINTAINED THROUGHOUT
THE TERM OF THE WORK EFFORT ON THE DWELLING.
4. PRIOR TO CONSTRUCTION -RELATED WORK ACTIVITY THE WORK LIMIT SHALL
BE FITTED WITH THE APPROPRIATE SILT FENCE, STAKED FABRIC, BACKED UP BY
STAKED STRAW BALES. THE SILT FENCE SHALL BE MAINTAINED THROUGHOUT
THE TERM OF THE WORK EFFORT.
5. EXISTING UTILITY LINES SHALL BE MARKED OUT AND PROTECTED UNLESS
REPLACED.
6. A SUITABLY SIZED TRASH CONTAINER SHALL BE MAINTAINED AT THE WORK SITE
.0 f �I I aP� �6 ° % BENCHMARK: AND EMPTIED ON A REGULAR BASIS.
TOP OF CONC. BOUND 7. EXCAVATION / INSTALLATION CONTRACTOR SHALL VERIFY ALL PLUMBING AND
/ \ _ ,0• oP� ELEV. = 14.9 OR UTILITY OR IRRIGATION CONNECTIONS AND ELEVATIONS WITH THE
ENGINEER PRIOR TO MAKING CONNECTION TO EXISTING SEPTIC SYSTEM.
& ROOF RUNOFF SHALL BE CONTROLLED WITH FRENCH DRAINS OR DRYWELLS
\ I �� 6,�• ,ry UNTILL THE LAND AREA SURROUNDING THE DWELLING HAS
9. CONTACT CAPE COD ENGINEERING, INC. PRIOR TO SITE PREPARATION WORK
W \ i / titi °P� % °P� /F
r 6 . \ \\ •\ .���r- / . OPS ,� °PK
I N-51
�j
inig �'O \ \ �i SAVE CEDAR
Za kc'
+ I
gg
`i' GS a •-� `�_ x x � •
0 •. '
100 YR. •FLOOD 2
\ oma w«
\ niao��ao
\ \ \ MGT VEGETATION
HAT NOTESHE
9�
C
EES
r
• Q�
• � e
< 107.
SLOPE '
•
t,
PLAN
i' AND/ OR EXCAVATION TO REVIEW ADDITIONAL REQUIREMENTS.
0
10. DRIVEWAY MODIFICATION SHALL REQUIRE ALL BITUMINUS, CRUSHED SHELL
Q AND BASE MATERIALS TO BE REMOVED FROM THE LOCATION OF DRIVE AREAS
BEING ABANDONED. VERIFY SUBSOIL QUALITY AND TOP DRESS WITH SUITABLE
S6 o COMPACTED THIN13-ESS OF HIGH QUALITY TOPSOIL TO MATCH EXISTING
p � GRADES. SEED AS REQUIREd. .
h5 ^ ' D Il. NEW DRIVEWAY AREAS SHALL HAVE ALL TOPSOIL AND ROOT MATERIAL
REMOVED TO A SATISFACTORY DEPTH SUBJECT TO INSPECTION. PLACE SUBSASE
AND COMPACT TO MATCH PROPOSED DRIVEWAY GRADE WITH NATIVE
i F= PROCESSED GRAVEL (11'fASS HIGHWAY SPEC. MI.03.1) USE OF RECYCLED
S MATERIALS, "ABC" OR "T" BASE MAY ONLY BE USED WITH OWNERS APPROVAL.
+� PLACE APPROPRIATE CRUSHED STONE OR SHELL SURFACE V4'/ APPROX 1 IN
I inch - 2D ft
i'a �.�'� ,+' �G , V ti_.E C .. - IS::IC❑ u
a
n^ture '
COMPACTED THICKN9✓SS..
1LTHE RE -GRADED LAND AREAS AFFECTED BY THE RPOJECT SHALL BE SHAPED
USING APPROPRIATE SUBSOILS AND / OR TOPSOILS. RESTORE LAWN AREAS WITH
NATIVE FESCUE GRASS SEED,
13. ALL TREES NOT FLAGGED FOR REMOVAL SHALL BE PROTECTED FROM CONTACT
WITH MACHINERY. NO EARTH STOCKPILE OR INNAPPROPRIATE GRADE CHANGE
Q IS PERMITTED TO AFFECT ANY TREE.
2/4/2016
ADD STONE STEPS
9/3/2014
WORK LIMIT PER CONS. COM.
7/11/2014
ADDED PROPOSED UTILITIES
7/11/2014
REVISED PROPOSED GARAGE & DRIVEWAY LOCA11ON
12/30/2013
REVISED PROPOSED DWELLING & DRIVEWAY
3/19/2013
REVISED PROPOSED CONTOURS
REVISIONS
KRISTOFF.DWG
TOPOGRAPHIC PLAN OF LAND
SHOWING
PROPOSED DEMOLITION AND RECONSTRUCTION
OF AN EXISTING DWELLING
PREPARED FOR
BRETT AND MARK KRISTOFF
AT
72 WHITE CEDAR ROAD WEST YARMOUTH, MA
ASSESSOR'S MAP 9, PARCEL 7
ECEMBER 27, 2012 SCALE - AS NOTED
PREPARED BY
CAPE COD ENGINEERING, INC.
ROBERT M. PERRY, P.E.
?; P.O. BOX 1517
c+v,
Iy 35 jl. EAST DENNIS, MA 02641
508-385-1445