HomeMy WebLinkAbout83-2059 - Bulkhead Reconstruction002KELP LANE
(PUBLIC - 40' WIDE)
{� --- N8 '39'1 ,VJ -
MAP 25 TCB/DH / 68:9
PARCEL 19 (HELD) /
/_
2�
cvR15c
#7 &
MAP 25,
PARCEL 19 �
N
JOHN F III & c
CATHERINE M. MCNAMARA `o o / #3
75 MOORLAND ROAD o SHOWER
SCITUATE. MA 02066 a MAP 25 P
PAUL F. PARCEL 18
THE PAUL F. MCGRADY TR
MCGRADY TR OF 2007 a
I 132 HOLLIS AVENUE
BRAINTRE0-E, MA 02184 U
UI
z:
Q i
7 DECK __
-- o A
. :._4... 1- OVHG
PROPOSEDFILL
/ , - :.:..... .:.. ..:
„.
P
j ROPosEDFILL
IN. SHED
'S
;85'3
FLOOD/ !
PARKERS `-\ BULKHEAD 3 + \
CA
RIVER DEP LIC P-2537 U AA
EBB
(TIDAL) EXISTING 70'1 TIMBER I
BULKHEAD; RECONSTRUCT IN
REFER TO ADJACENT PLAN
FOR CONTINUED GRADING SAME FOOTPRINT (SEE DETAILS)
� '
PROPOSED 12' RETURNS i
(TYP., BELOW GRADE)
(2) 3" X 8" P.T. CAP;
W/ , GALV. BOLTS SI TE PLAN PROPOSED
� 3' O.C. (TYP)
)r GALV. LAG BOLTS Ip 5 q 10 20 4C
1 0 3' O.C. (TYP) (ALTERNATE
WITH CAP THRU-BOLTS (TYP) SCALE: 1"=20'
(2) 3" X 6- P.T. CAP
SUPPORTS; W/ )f GALV.
BOLTS 0 3' O.C. (TYP)
SHOREGUARD SG 625
SHEETING (TYP)
N
BULKHEAD CAP DETAIL CARTIFICAL TOPOASTAL BANK OF
4 ? ? 4 LSCSF LAND UNDER OCEAN -
SCALE: 1"=2' EXISTING BULKHEAD (TO BE REPLACED
PROPOSED GRADE EL 6.5' PROPOSED NEW VINYL BULKHEAD
(APPROX. 46f CU. YDS.) \ I T.O.W. = 7.0' NAVD88 (SEE DETAIL)
,/EXISTING GRADE \1
CONSTRUCTION NOTES:
1. ELEVATIONS REFER TO NAVD88. CONTACT SHOREFRONT CONSULTING FOR
ADDITIONAL ELEVATION INFORMATION AS NEEDED.
E 2. SCOPE OF WORK CONSISTS OF CONSTUCTING A NEW VINYL BULKHEAD IN THE SAME FOOTPRINT OF THE FAILING TIMBER
BULKHEAD AND INCREASING THE HIEGHT BY 1.5 FEET TO ELEVATION 7' NAVD88. THE NEW BULKHEAD SHALL HAVE
12 -FOOT RETURNS OR AS APPROVED BY APPLICANT. THE EXISTING TIMBER LANDING SHALL BE TEMPORARILY REMOVED
1 AND REPLACED. APPROXIMATELY 46 f CUBIC YARDS OF CLEAN FILL SHALL BE BROUGHT ON SITE TO FILL THE AREA
BEHIND THE NEW WALL TO ELEVATION 6.5 NAVD88. THE NEW RETURNS SHALL BE CONSTRUCTED AT A LOWER HEIGHT
THAN THE NEW WALL SO THAT THEY ARE HIDDEN BELOW THE PROPOSED GRADE. THE EXISTING SHED SHALL BE
REPLACED AND INCLUDE A GENERATOR PAD. THE EXISTING PILES CAN REMAIN TO PROVIDE FALSE WORK FOR THE NEW
SHEETING.
3. CONSTRUCTION ACCESS SHALL BE FROM THE APPLICANTS PROPERTY AND FROM A WORKING BARGE. EQUIPMENT SHALL
BE STORED ON THE APPLICANT'S PROPERTY OR THE WORKING BARGE MEN NOT IN USE. WORKING BARGE TO BE
ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE.
4. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE BULKHEAD. EQUIPMENT
AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF
INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION AUTHORITIES.
5. ALL WORK SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS MUCH AS PRACTICAL THE SHEET PILING MAY BE
DRIVEN BY A SMALL EXCAVATOR ON THE LANDWARD SIDE OF THE BULKHEAD. THE REMAINDER OF WORK SHALL BE
ACCOMPLISHED BY HAND. AT NO TIME SHALL THE WORKING BARGE COME IN CONTACT WITH THE BOTTOM.
6. VINYL SHEETING SHALL BE SHOREGUARD SG -625, WITH 16 -FOOT LONG SHEETS, AND SHALL BE DRIVEN TO THE FULL
DEPTH WITH MINIMUM CUTTOFF. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE
CONTACTED BEFORE PROCEEDING.
7. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE -CONSTRUCTION CONDITION. ALL WORK
SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE
W SITE.
8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE PRE -CONSTRUCTION
CONTOURS AND CONDITIONS.
9. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH
CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK.
LJ 10. ANY TIMBER USED IN THE WATER SHALL NOT BE CCA PRESSURE TREATED. ALL HARDWARE SHALL BE GALVANIZED OR
STAINLESS STEEL, UNLESS OTHERWISE APPROVED BY OWNER OR SHOREFRONT CONSULTING.
11. ANY DEBRIS OR MATERIAL THAT ENTERS THE WATER DURING CONSTRUCTION SHALL BE REMOVED IMMEDIATELY.
12. THE EXISTING ANCHORS SHALL BE INSPECTED, PULL TESTED, EVALUATED AND RE -USED WHERE POSSIBLE. NEW TIE ROD
I SECTIONS SHALL BE WELDED ONTO THE EXISTING USABLE SECTIONS AND WRAPPED OR COVERED WITH A PROTECTIVE
Q U COATING TO PREVENT CORROSION.
z 13. REFER TO STRUCTURAL PLANS PROVIDED BY TRANSITION ENGINEERING, INCORPORATED.
Q 2'f 1
w
"n
0)
0
6.5
N
1 4/3/16 REVISED TO RECONSTRUCT -1N SAME -FOOTPRINT-=
=:MCBA
INL�_Iflt
0
PLAN SHOWING PROPOSED
BULKHEAD RECONSTRUCTION
SC -72
s AS SHOWN
_
���!I�S�JL9�./:\�i�2:f:�lY•l:iy�9)
puNr+ er
MCB
EG
s
_
, .L m
BULKHEAD CAP DETAIL CARTIFICAL TOPOASTAL BANK OF
4 ? ? 4 LSCSF LAND UNDER OCEAN -
SCALE: 1"=2' EXISTING BULKHEAD (TO BE REPLACED
PROPOSED GRADE EL 6.5' PROPOSED NEW VINYL BULKHEAD
(APPROX. 46f CU. YDS.) \ I T.O.W. = 7.0' NAVD88 (SEE DETAIL)
,/EXISTING GRADE \1
CONSTRUCTION NOTES:
1. ELEVATIONS REFER TO NAVD88. CONTACT SHOREFRONT CONSULTING FOR
ADDITIONAL ELEVATION INFORMATION AS NEEDED.
E 2. SCOPE OF WORK CONSISTS OF CONSTUCTING A NEW VINYL BULKHEAD IN THE SAME FOOTPRINT OF THE FAILING TIMBER
BULKHEAD AND INCREASING THE HIEGHT BY 1.5 FEET TO ELEVATION 7' NAVD88. THE NEW BULKHEAD SHALL HAVE
12 -FOOT RETURNS OR AS APPROVED BY APPLICANT. THE EXISTING TIMBER LANDING SHALL BE TEMPORARILY REMOVED
1 AND REPLACED. APPROXIMATELY 46 f CUBIC YARDS OF CLEAN FILL SHALL BE BROUGHT ON SITE TO FILL THE AREA
BEHIND THE NEW WALL TO ELEVATION 6.5 NAVD88. THE NEW RETURNS SHALL BE CONSTRUCTED AT A LOWER HEIGHT
THAN THE NEW WALL SO THAT THEY ARE HIDDEN BELOW THE PROPOSED GRADE. THE EXISTING SHED SHALL BE
REPLACED AND INCLUDE A GENERATOR PAD. THE EXISTING PILES CAN REMAIN TO PROVIDE FALSE WORK FOR THE NEW
SHEETING.
3. CONSTRUCTION ACCESS SHALL BE FROM THE APPLICANTS PROPERTY AND FROM A WORKING BARGE. EQUIPMENT SHALL
BE STORED ON THE APPLICANT'S PROPERTY OR THE WORKING BARGE MEN NOT IN USE. WORKING BARGE TO BE
ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE.
4. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE BULKHEAD. EQUIPMENT
AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF
INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION AUTHORITIES.
5. ALL WORK SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS MUCH AS PRACTICAL THE SHEET PILING MAY BE
DRIVEN BY A SMALL EXCAVATOR ON THE LANDWARD SIDE OF THE BULKHEAD. THE REMAINDER OF WORK SHALL BE
ACCOMPLISHED BY HAND. AT NO TIME SHALL THE WORKING BARGE COME IN CONTACT WITH THE BOTTOM.
6. VINYL SHEETING SHALL BE SHOREGUARD SG -625, WITH 16 -FOOT LONG SHEETS, AND SHALL BE DRIVEN TO THE FULL
DEPTH WITH MINIMUM CUTTOFF. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE
CONTACTED BEFORE PROCEEDING.
7. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE -CONSTRUCTION CONDITION. ALL WORK
SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE
W SITE.
8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE PRE -CONSTRUCTION
CONTOURS AND CONDITIONS.
9. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH
CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK.
LJ 10. ANY TIMBER USED IN THE WATER SHALL NOT BE CCA PRESSURE TREATED. ALL HARDWARE SHALL BE GALVANIZED OR
STAINLESS STEEL, UNLESS OTHERWISE APPROVED BY OWNER OR SHOREFRONT CONSULTING.
11. ANY DEBRIS OR MATERIAL THAT ENTERS THE WATER DURING CONSTRUCTION SHALL BE REMOVED IMMEDIATELY.
12. THE EXISTING ANCHORS SHALL BE INSPECTED, PULL TESTED, EVALUATED AND RE -USED WHERE POSSIBLE. NEW TIE ROD
I SECTIONS SHALL BE WELDED ONTO THE EXISTING USABLE SECTIONS AND WRAPPED OR COVERED WITH A PROTECTIVE
Q U COATING TO PREVENT CORROSION.
z 13. REFER TO STRUCTURAL PLANS PROVIDED BY TRANSITION ENGINEERING, INCORPORATED.
Q 2'f 1
\ JVL VLJ 111\IL JI ILL III\V, / -
16' LONG MIN.
PROPOSED -' THRU-BOLTS;
2' O.C. (TYP)
The Order of Conditions PROPOSED CHANCE HELICAL
ANCHORS; 6' SPACING, (TYI
requires a 2ft stone buffer I
along the bulkhead 6' MAX (USE EXISTING DEADMAN PREFERRED) +{
BULKHEAD PLAN VIEW DETAIL
�, 4 ? � 4?�4
SCALE: 1"=2'
TOP OF WALL, EL 7' NAVD88. PROPOSED TIMBER CAP;
MAXIMUM UNBALANCEDALL = 11 FEET TO MUDUNE. /SEE DETAIL (AW -1075
FILL AND GRADE TO WITHIN 6" OF T.O.W. ALUMINUM CAP OPTIONAL)
20' MINIMUM EMBEDMENT PROPOSED CONT.
SHALL DEVELOP 18K MIN. I GREENHEART 8" X 8"
1 4/3/16 REVISED TO RECONSTRUCT -1N SAME -FOOTPRINT-=
=:MCBA
INL�_Iflt
�
PLAN SHOWING PROPOSED
BULKHEAD RECONSTRUCTION
SC -72
s AS SHOWN
_
���!I�S�JL9�./:\�i�2:f:�lY•l:iy�9)
puNr+ er
MCB
EG
owaec e».
KELP LANEDWG
�I-PROPOSED
, .L m
\ JVL VLJ 111\IL JI ILL III\V, / -
16' LONG MIN.
PROPOSED -' THRU-BOLTS;
2' O.C. (TYP)
The Order of Conditions PROPOSED CHANCE HELICAL
ANCHORS; 6' SPACING, (TYI
requires a 2ft stone buffer I
along the bulkhead 6' MAX (USE EXISTING DEADMAN PREFERRED) +{
BULKHEAD PLAN VIEW DETAIL
�, 4 ? � 4?�4
SCALE: 1"=2'
TOP OF WALL, EL 7' NAVD88. PROPOSED TIMBER CAP;
MAXIMUM UNBALANCEDALL = 11 FEET TO MUDUNE. /SEE DETAIL (AW -1075
FILL AND GRADE TO WITHIN 6" OF T.O.W. ALUMINUM CAP OPTIONAL)
20' MINIMUM EMBEDMENT PROPOSED CONT.
SHALL DEVELOP 18K MIN. I GREENHEART 8" X 8"
�1
SII o C
o�
H: 1"=1'
L0 0
o
04 to
o 0
SECTION ASECTION A-ALELEVATION�
s q 5 10 20
SCALE 1"=10'
PROPOSED GRADE PROPOSED CONT. P.T.
2' X 6" BACK WALE
EXCAVATE TO
FACILITATE
INSTALLATION
OF TIE BACK
NEW 1 1/2'0 CHANCE HEUCAL SCREW ANCHOR
TYPE SS5 1Xz' X 5' WITH 8' do 10" FLIGHTS
® 6'-0" O.C. MINIMUM ANCHOR PENETRATION
SHALL BE 20, AND DEVELOP 18 KIPS MINIMUM
ANCHOR FORCE PER ANCHOR
BULKHEAD ELEVATION DETAIL
ANCHOR WALE (UC -6 STR
COMPOSITE WALE OPTIONAL)
1' DOCK WASHERS
100 THREADED
ROD ADAPTER
/ I � EXISTING GRADE���
\ PROPOSED SHOREGUARD
SG 625 VINYL SHEETING,
16 FEET LONG (MIN).
2.5 q 2.5 10
in
SCALE: 1"=5'
11
r
�tL U1
N ti G
w
G m
S Y,
tN
D
LOCUS ��
CAP
YARMOUTH, MA KEY MAP
1" = 800'
LEGEND
H. . gym' MEAN HIGH WATER
k0. v
MLW MEAN LOW WATER
9 1 e
w"06 -2- ELEVATION CONTOUR
6.5 PROPOSED GRADE
NOT FOR STRUCTURAL �-
PROPERTY UNE
SURVEY NOTES:
RECORD OWNER:
MCGRADY PAUL F TR
THE PAUL F MCGRADY TR OF 2007
32 HOWS AVE
BRAINTREE, MA. 02184
DEED BOOK 22173 PG. 322
PLAN BOOK 181 PG. 125
r. PROPERTY IS SHOWN ON ASSESSORS MAP 25, PARCEL 18, AND
1PPEARS TO LIE WITHIN THE RESIDENTIAL 25 DISTRICT PER THE TOWN OF
'ARMOUTH ZONING MAP.
L PROPERTY LINES SHOWN WERE DERIVED FROM AN ON THE GROUND
SURVEY CONDUCTED DECEMBER 2015, LINES OF OCCUPATION, AND FOUND
10NUMENTATION.
I. ORIGIN OF BEARINGS IS PLAN BOOK 181 PAGE 125, RECORDED AT
HE BARNSTABLE COUNTY REGISTRY OF DEEDS.
L ORIGIN OF ELEVATIONS ARE BASED ON FIRM MARK RM 27 ELEVATION
'.48' NGVD, CONVERTED TO NAVD 88.
L PARCEL APPEARS TO LIE WITHIN THE AE (EL=11') AND AE (EL=12')
LOOD ZONES PER FIRM MAP 25001 PANEL 88 OF 875, LAST REVISED
ULY 16, 2014 AS SHOWN ON THE FEMA WEBSITE.
'. EXISTING CONDITIONS SHOWN HEREON WERE COMPILED FROM AN ON
HE GROUND SURVEY CONDUCTED IN DECEMBER, 2015 AND JANUARY
!016, AND FROM PLANS ON RECORD AT THE BARNSTABLE COUNTY
tEGISTRY OF DEEDS.
1. SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH
'OR EASEMENTS OF RECORD, ENCUMBRANCES, RESTRICTIVE
:OVENANTS,OWNERSHIP TITLE EVIDENCE, OR ANY OTHER FACTS THAT AN
ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE.
____
I. NONE OF THE PROPOSED WORK ARE LOCATED_,VATHIN A,NHESP_
IOUNDARY AND THEREFORE WILL'NOT BE SUBJECT TO`MESA''REVIEW.
1 4/3/16 REVISED TO RECONSTRUCT -1N SAME -FOOTPRINT-=
=:MCBA
�9:L'IgJLs1�.G\�i�IcL:�l7�1:id�H1•
�
PLAN SHOWING PROPOSED
BULKHEAD RECONSTRUCTION
SC -72
s AS SHOWN
_
���!I�S�JL9�./:\�i�2:f:�lY•l:iy�9)
puNr+ er
MCB
EG
owaec e».
KELP LANEDWG
■
C-
or-! sears
�1
SII o C
o�
H: 1"=1'
L0 0
o
04 to
o 0
SECTION ASECTION A-ALELEVATION�
s q 5 10 20
SCALE 1"=10'
PROPOSED GRADE PROPOSED CONT. P.T.
2' X 6" BACK WALE
EXCAVATE TO
FACILITATE
INSTALLATION
OF TIE BACK
NEW 1 1/2'0 CHANCE HEUCAL SCREW ANCHOR
TYPE SS5 1Xz' X 5' WITH 8' do 10" FLIGHTS
® 6'-0" O.C. MINIMUM ANCHOR PENETRATION
SHALL BE 20, AND DEVELOP 18 KIPS MINIMUM
ANCHOR FORCE PER ANCHOR
BULKHEAD ELEVATION DETAIL
ANCHOR WALE (UC -6 STR
COMPOSITE WALE OPTIONAL)
1' DOCK WASHERS
100 THREADED
ROD ADAPTER
/ I � EXISTING GRADE���
\ PROPOSED SHOREGUARD
SG 625 VINYL SHEETING,
16 FEET LONG (MIN).
2.5 q 2.5 10
in
SCALE: 1"=5'
11
r
�tL U1
N ti G
w
G m
S Y,
tN
D
LOCUS ��
CAP
YARMOUTH, MA KEY MAP
1" = 800'
LEGEND
H. . gym' MEAN HIGH WATER
k0. v
MLW MEAN LOW WATER
9 1 e
w"06 -2- ELEVATION CONTOUR
6.5 PROPOSED GRADE
NOT FOR STRUCTURAL �-
PROPERTY UNE
SURVEY NOTES:
RECORD OWNER:
MCGRADY PAUL F TR
THE PAUL F MCGRADY TR OF 2007
32 HOWS AVE
BRAINTREE, MA. 02184
DEED BOOK 22173 PG. 322
PLAN BOOK 181 PG. 125
r. PROPERTY IS SHOWN ON ASSESSORS MAP 25, PARCEL 18, AND
1PPEARS TO LIE WITHIN THE RESIDENTIAL 25 DISTRICT PER THE TOWN OF
'ARMOUTH ZONING MAP.
L PROPERTY LINES SHOWN WERE DERIVED FROM AN ON THE GROUND
SURVEY CONDUCTED DECEMBER 2015, LINES OF OCCUPATION, AND FOUND
10NUMENTATION.
I. ORIGIN OF BEARINGS IS PLAN BOOK 181 PAGE 125, RECORDED AT
HE BARNSTABLE COUNTY REGISTRY OF DEEDS.
L ORIGIN OF ELEVATIONS ARE BASED ON FIRM MARK RM 27 ELEVATION
'.48' NGVD, CONVERTED TO NAVD 88.
L PARCEL APPEARS TO LIE WITHIN THE AE (EL=11') AND AE (EL=12')
LOOD ZONES PER FIRM MAP 25001 PANEL 88 OF 875, LAST REVISED
ULY 16, 2014 AS SHOWN ON THE FEMA WEBSITE.
'. EXISTING CONDITIONS SHOWN HEREON WERE COMPILED FROM AN ON
HE GROUND SURVEY CONDUCTED IN DECEMBER, 2015 AND JANUARY
!016, AND FROM PLANS ON RECORD AT THE BARNSTABLE COUNTY
tEGISTRY OF DEEDS.
1. SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH
'OR EASEMENTS OF RECORD, ENCUMBRANCES, RESTRICTIVE
:OVENANTS,OWNERSHIP TITLE EVIDENCE, OR ANY OTHER FACTS THAT AN
ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE.
____
I. NONE OF THE PROPOSED WORK ARE LOCATED_,VATHIN A,NHESP_
IOUNDARY AND THEREFORE WILL'NOT BE SUBJECT TO`MESA''REVIEW.
205q
1 4/3/16 REVISED TO RECONSTRUCT -1N SAME -FOOTPRINT-=
=:MCBA
PLAN SHOWING PROPOSED
BULKHEAD RECONSTRUCTION
SC -72
s AS SHOWN
dua 4/17/16
ano,IFcf
PAUL MCGRADY
3 KELP LANE YARMOUTH, MA.
puNr+ er
MCB
EG
owaec e».
KELP LANEDWG
SHOREFRONT CONSULTING
290 CENTER STREET
DENNISPORT, MA. 02639
(508) 280-8046
WWW.SHOREFRONTCONSULIING.COM
C-
or-! sears
205q