HomeMy WebLinkAbout83-2061 - Bulkhead Reconstruction - Approved\5
W-4
N
n. ,L --------
S
P
#11
MAP 25
PARCEL 20
P �5, PARCEL
EUNN 0
IU J
E HUGH Esj
7'y GAA WJLLSCP UEF
HTpUy MA SLAND n�� _
DRUVEWA`Y
OWER
ws
FBI
\ \ REFER TO
\ � ADJACENT PLANS
FOR- CONTINUED" o
/ GRADING +„ O
rn
E$ISTING 85't TIMBER
tULKHEAD; RECONSTRUCT IN
AME FOOTPRINT (SEE DETAIL
(2) 3" X 8' P.T. CAP;
t
'LV.BOLTS
(TYP)
¢' GALV. LAG BOLTS
3' O.C. (TYP) (ALTERNATE
ITH CAP THRU-BOLTS (TYP)
(2) 3" X 6' P.T. CAP
SUPPORTS; W/ V GALV.
BOLTS 0 3' O.C. (TYP)
OREWARD SG 625
ETING (TYP)
BULKHEAD CAP DETAIL
Q ) 2r 4
SCALE: 1'=2'
N85'3 p W
55.23'
LANDSCAPE
DECK
MAP 25,
PARCEL 19
JOHN F. III &
CATHERINE M. MCNAMARA
75 MOORLAND ROAD
SCITUATE, MA 02066
11
KELP LANE j
(PUBLIC WIDE)
CB/DH /
(HELD)
/ MAP 25
PARCEL 18
0
Ov
n oIj C
I N O
;t
O
#3 -�
MAP 25, PARCEL 18
/
THE UL OF N/F
PAF MCGRADY TR
BRA?MCGRApY 7R OF 2007
NH0 S AVENUE
C i I TREE, MA 02184
0
z -
y
Lu �-
-�
LEGEND
0
ECK
�mw
MEAN HIGH WATER
ADDITIONAL ELEVATION INFORMATION AS NEEDED., W s
EX. BUtK'rTcD �
A\
-2-
5
6.5
SE83-186
F�000
PARKERS
`
DEQE LIC #592
l S
RIVER
REFER TO ADJACENT PLANS
FOR CONTINUED GRADING
��` EG
LOWER HEIGHT THAN THE NEW WALL SO THAT THEY ARE HIDDEN BELOW THE PROPOSED GRADE. THE EXISTING WALKWAY
PROPOSED 12' RETURNS
SHALL BE RECONSTRUCTED AT THE NEW ELEVATION TO MATCH THE BULKHEAD. THE EXISTING GRAVEL DRIVEWAY SHALL BE
(TIDAL)
(TYP., BELOW GRADE)
EBB
-
3. CONSTRUCTION ACCESS SHALL BE FROM THE APPLICANTS PROPERTY AND FROM A WORKING BARGE EQUIPMENT SHALL BE
SITE PLAN (PROPOSED)
10 5 Q 10 20 40
SCALE: 1"=20'
EXISTING BULKHEAD (TO BE REPLACED
PROPOSED GRADE EL 6.5PROPOSED NEW MNYL BULKHEAD
(APPROX. 39t CU. YDS.) \ 41T.O.W. = 7.0' NAVD88 (SEE DETAIL)
EXISTING GRADE \1
Ile (9140
�s
�s
• h I
Ont NO N
+'r? + (O +
O t0 O (V O
CONSTRUCTION NOTES: N
LEGEND
1. ELEVATIONS REFER TO NAVD88. CONTACT SHOREFRONT CONSULTING FOR
�mw
MEAN HIGH WATER
ADDITIONAL ELEVATION INFORMATION AS NEEDED., W s
MEAN LOW WATER
-2-
_ 2. SCOPE OF WORK CONSISTS OF CONSTUCTING A NEW VINYL BULKHEAD IN THE SAME FOOTPRINT OF THE FAILING
6.5
PROPOSED GRADE
TIMBER BULKHEAD AND INCREASING THE HIEGHT BY 1.5 FEET TO ELEVATION 7' NAVD88. THE NEW BULKHEAD g
SHALL HAVE 12 -FOOT RETURNS OR AS APPROVED BY APPLICANT. THE EXISTING TIMBER LANDING SHALL BE
PROPERTY UNE
raalccr ao.
3G-71
SrvE AS SHOWN
TEMPORARILY REMOVED AND REPLACED. APPROXIMATELY 39 t CUBIC YARDS OF CLEAN FILL SHALL BE BROUGHT ON SITE
raa�a
JOHN 8c CATHERINE MCNAMARA
7 KELP LANE YARMOUTH, MA
TO FILL THE AREA BEHIND THE NEW WALL TO ELEVATION 6.5' NAVD88. THE NEW RETURNS SHALL BE CONSTRUCTED AT A
��` EG
LOWER HEIGHT THAN THE NEW WALL SO THAT THEY ARE HIDDEN BELOW THE PROPOSED GRADE. THE EXISTING WALKWAY
�Jl
SHALL BE RECONSTRUCTED AT THE NEW ELEVATION TO MATCH THE BULKHEAD. THE EXISTING GRAVEL DRIVEWAY SHALL BE
WIDENED FOR BOAT STORAGE AS SHOWN. THERE IS ALSO A PROPOSED 6'x14' STORAGE SHED NTH A 12 -FOOT MADE BY
18 -FOOT LONG DECK EXPANSION ON THE EAST SIDE AS SHOWN. THE EXISTING PILES CAN REMAIN TO PROVIDE FALSE
WORK FOR THE NEW SHEETING.
3. CONSTRUCTION ACCESS SHALL BE FROM THE APPLICANTS PROPERTY AND FROM A WORKING BARGE EQUIPMENT SHALL BE
Ont NO N
+'r? + (O +
O t0 O (V O
CONSTRUCTION NOTES: N
LEGEND
1. ELEVATIONS REFER TO NAVD88. CONTACT SHOREFRONT CONSULTING FOR
�mw
MEAN HIGH WATER
ADDITIONAL ELEVATION INFORMATION AS NEEDED., W s
MEAN LOW WATER
-2-
_ 2. SCOPE OF WORK CONSISTS OF CONSTUCTING A NEW VINYL BULKHEAD IN THE SAME FOOTPRINT OF THE FAILING
6.5
PROPOSED GRADE
TIMBER BULKHEAD AND INCREASING THE HIEGHT BY 1.5 FEET TO ELEVATION 7' NAVD88. THE NEW BULKHEAD g
SHALL HAVE 12 -FOOT RETURNS OR AS APPROVED BY APPLICANT. THE EXISTING TIMBER LANDING SHALL BE
PROPERTY UNE
raalccr ao.
3G-71
SrvE AS SHOWN
TEMPORARILY REMOVED AND REPLACED. APPROXIMATELY 39 t CUBIC YARDS OF CLEAN FILL SHALL BE BROUGHT ON SITE
raa�a
JOHN 8c CATHERINE MCNAMARA
7 KELP LANE YARMOUTH, MA
TO FILL THE AREA BEHIND THE NEW WALL TO ELEVATION 6.5' NAVD88. THE NEW RETURNS SHALL BE CONSTRUCTED AT A
��` EG
LOWER HEIGHT THAN THE NEW WALL SO THAT THEY ARE HIDDEN BELOW THE PROPOSED GRADE. THE EXISTING WALKWAY
�Jl
SHALL BE RECONSTRUCTED AT THE NEW ELEVATION TO MATCH THE BULKHEAD. THE EXISTING GRAVEL DRIVEWAY SHALL BE
WIDENED FOR BOAT STORAGE AS SHOWN. THERE IS ALSO A PROPOSED 6'x14' STORAGE SHED NTH A 12 -FOOT MADE BY
18 -FOOT LONG DECK EXPANSION ON THE EAST SIDE AS SHOWN. THE EXISTING PILES CAN REMAIN TO PROVIDE FALSE
WORK FOR THE NEW SHEETING.
3. CONSTRUCTION ACCESS SHALL BE FROM THE APPLICANTS PROPERTY AND FROM A WORKING BARGE EQUIPMENT SHALL BE
STORED ON THE APPLICANTS PROPERTY OR THE WORKING BARGE WHEN NOT IN USE. WORKING BARGE TO BE ANCHORED
TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE.
L l� V J
LOCUS O C S
4. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE BULKHEAD. EQUIPMENT
AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF INTENT,
THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION AUTHORITIES.
5. ALL WORK SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS MUCH AS PRACTICAL THE SHEET PILING MAY BE DRIVEN
1
BY A SMALL EXCAVATOR ON THE LANDWARD SIDE OF THE BULKHEAD. THE REMAINDER OF WORK SHALL BE ACCOMPLISHED
BY HAND. AT NO TIME SHALL THE WORKING BARGE COME IN CONTACT WITH THE BOTTOM.
6. VINYL SHEETING SHALL BE SHOREGUARD SG -625, WITH 15 -FOOT LONG SHEETS, AND SHALL BE DRIVEN TO THE FULL
YARMOUTH, MA
DEPTH WITH MINIMUM CUTTOFF. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE
CONTACTED BEFORE PROCEEDING.
7. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE -CONSTRUCTION CONDITION. ALL WORK
SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE.
8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE PRE -CONSTRUCTION CONTOURS
NO
EDM,p
AND CONDITIONS.
9. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH
�SH.
13�
CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK
(4D.
• 4
10. ANY TIMBER USED IN THE WATER SHALL NOT BE CCA PRESSURE TREATED. ALL HARDWARE SHALL BE GALVANIZED OR
STAINLESS STEEL, UNLESS OTHERWISE APPROVED BY OWNER OR SHOREFRONT CONSULTING.
11. ANY DEBRIS OR MATERIAL THAT ENTERS THE WATER DURING CONSTRUCTION SHALL BE REMOVED IMMEDIATELY.
y
IDE Z �
- m
Y, G�L85�
12. THE EXISTING ANCHORS SHALL BE INSPECTED, PULL TESTED, EVALUATED AND RE -USED WHERE POSSIBLE. NEW TIE ROD NOT FOR STRUCTURAL
SECTIONS SHALL BE WELDED ONTO THE EXISTING USABLE SECTIONS AND WRAPPED OR COVERED WITH A PROTECTIVE
I COATING TO PREVENT CORROSION. SURVEY NOTES:
13. REFER TO STRUCTURAL PLANS PROVIDED BY TRANSITION ENGINEERING, INCORPORATED. 1. RECORD OWNER:
MCNAMARA JOHN F III
2't MCNAMARA CATHERINE M
req I►�s ,(2��� s
b��-fey c� .:1 bu4�klQQc�.
H: 1"=1'
SECTION A -A (ELEVATION �� Q 10 ?O
SCALE- 1'=10'
6' MAX. (USE EXISTING DEADMAN PREFERRED)
BULKHEAD PLAN VIEW DETAIL
5 Q 1 4
SCALE: 1"=2'
TOP OF WALL ELY NAVD88. PROPOSED TIMBER CAP;
MAXIMUM UNBALANCED FILL = 10 FEET TO MUDUNE. SEE DETAIL (AW -1075
FILL AND GRADE TO WITHIN 6" OF T.O.W. ALUMINUM CAP OPTIONAL)
20' MINIMUM EMBEDMENT PROPOSED CONT.
GREENHEART 8' X 8'
SHALL DEVELOP 18K MIN.
PROPOSED GRADE PROPOSED CONT. P:
2 X 6 BACK WALE
EXCAVATE TO
FACILITATE
INSTALLATION
OF TIE BACK
NEW 1 1/2'0 CHANCE HELICAL SCREW ANCHOR
TYPE SS5 U¢' X 5' WITH 8" & 10" FLIGHTS
0 6'-0" O.C. MINIMUM ANCHOR PENETRA11ON
ANCHOR WALE (UC -6 STR
COMPOSITE WALE OPTIONAL)
1' DOCK WASHERS
1'0 THREADED
ROD ADAPTER
af�ll�Cd
SHALL BE 20', AND DEVELOP 18 KIPS MINIMUM
12.5
PROPOSED SHOREWARDANCHOR FORCE PER ANCHOR SG 625VINYL SHEETING,
15 FEET LONG (MIN).BULKHEAD ELEVATION DETAIL ,o
SCALE: 1 "=5'
ZI
KEY MAP
1" = 800'
LEGEND
�mw
MEAN HIGH WATER
MLw
,,,.I...
MEAN LOW WATER
-2-
ELEVATION CONTOUR
6.5
PROPOSED GRADE
er
PROPERTY UNE
75 MOORLAND ROAD
SCITUATE, MA. 02066
DEED BOOK 26261 PG. 88
PLAN BOOK 181 PG. 125
2. PROPERTY IS SHOWN ON ASSESSORS MAP 25, PARCEL
19, AND APPEARS TO LIE WITHIN THE RESIDENTIAL 25
DISTRICT PER THE TOWN OF YARMOUTH ZONING MAP.
3. PROPERTY LINES SHOWN WERE DERIVED FROM AN ON THE
GROUND SURVEY CONDUCTED DECEMBER 2015, LINES OF
OCCUPATION, AND FOUND MONUMENTAl10N.
4. ORIGIN OF BEARINGS IS PLAN BOOK 181 PAGE 125,
RECORDED AT THE BARNSTABLE COUNTY REGISTRY OF DEEDS.
5. ORIGIN OF ELEVATIONS ARE BASED ON FIRM MARK RM 27
ELEVATION 7.48' NGVD, CONVERTED TO NAVD 88.
6. PARCEL APPEARS TO LIE WITHIN THE AE (0. =11') AND
AE (EL=12') FLOOD ZONES PERFIRM MAP 25001 PANEL 88
OF 875, LAST REVISED JULY 16, 2014 AS SHOWN ON THE
FEMA WEBSITE.
7. EXISTING CONDITIONS SHOWN HEREON WERE COMPILED
FROM AN ON THE GROUND SURVEY CONDUCTED IN DECEMBER,
2015 AND JANUARY 2016, AND FROM PLANS ON RECORD AT
THE BARNSTABLE COUNTY REGISTRY OF DEEDS.
8. SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT
SEARCH FOR EASEMENTS OF RECORD, ENCUMBRANCES,
RESTRICTIVE COVENANTS,OWNERSHIP TITLE EVIDENCE, OR ANY
OTHER FACTS THAT AN ACCURATE AND CURRENT TITLE
SEARCH MAY DISCLOSE.74 16
9. NONE OF THE PROPOSED WORK ARE LOCATED WITHIN A
NHESP BOUNDARY AND -THEREFORE WALL -NOT BE --SUBJECT TO
MESA REVIEW:
' r .E_ � I T II
zo(o 1
I
1 4/3/16 REVISED TO RECONSTRUCT TN §AME FOOTPRINT -
--`MCB
ra. wre Asan
er
PLAN SHOWING PROPOSED
BULKHEAD RECONSTRUCTION
raalccr ao.
3G-71
SrvE AS SHOWN
� 4/17/16
raa�a
JOHN 8c CATHERINE MCNAMARA
7 KELP LANE YARMOUTH, MA
owaM ar
MCB
��` EG
owwnlc No.
KELP LANEDWG
SHOREFRONT CONSULTING
290 CENTER STREET
DENNISPORT, MA. 02639
(506) 260-8046
WWW.SHOREFRONTCONSULTING.COM
c_1
� of -1 sans
zo(o 1