Loading...
HomeMy WebLinkAboutDOA - 2 Florence Lane - Plot Planm / a LOT 2 REVISIONS: NO. DATE DESC. NONE NOT A ZONE II — 7A9", DATED 7/2/92 PANEL #250015 — 25,000 S.F. — 18,421± S.F. 1,801± S.F. (10%) 2,719± S.F. (14.8%) I CERTIFY TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, INFORMATION AND BELIEF THAT THE LOT CORNERS, DIMENSIONS AND SETBACKS TO THE STRUCTURE AS DETERMINED BY INSTRUMENT SURVEY AND AS SHOWN ON THIS PLAN ARE CORRECT. 0" kap Q."_� .3/��/iy PROFE SIONAL LAND SURVEYOR DATE Cb w CERTIFIED PLOT PLAN 38 4g / v,. '/ . 41 ho 7` 28 \� AT V LOT 1 // ,t2 4Co , % % PROPTION RI ADDGN f m FL ORENCE LANE ass. o \ IN l 15• EXISTING ° WEST YARMOUTH DWELLING 0 g TOF 12.96 (IEW SU SDOM 20-2. MAS SAC H U S ETTS \TUBEEs (BARNSTABLE COUNTY) PROPOSED GALLON E0 I r M ~ 59.9 ! y.� _ZDMOSEo 10 ` ADDITIOGE k v, � i I LOT 6 \9 \�� \�\ `�. 18,421.t sl e 2p THE SEPTIC SYSTEM LOCATION DEPICTED HEREON IS BASED ON A 1982 DESIGN PLAN ON FILE AT THE YARMOUTH BOARD OF HEALTH AND IS APPROXIMATE. DIG SAFE REQUIRED PRIOR TO ANY EXCAVATION ON THE SITE. L_ BENCHMARK � � � .o � TOP OF CONCRETE BOUND. ELEVATION 10.00 NGVD MARCH 19s 2014 PREPARED FOR: Mr. KEN HIGHFIELD P.O. BOX 393 WESTON, MA 02493 978-443-6978 BSC GMUP 349 Route 28, Unit D West Yarmouth, Massachusetts C L 508 778 8919 © 2014 The BSC Group, Inc. SCALE: 1" = 20' 0 2.5 5 10 urroa 0 10 20 40 mg PROJ. MGR.: CRAIG FIELD Z CALC./DESIGN: K. HEALY DRAWN: K. HEALY LOCUS INFORMATION FILE: 9690 -CPP DWG. NO: 6245-01 SHEET 1 OF 1 JOB. NO: 4-9690.00 O � i < N I CURRENT OWNER: KENNETH B. HIGHFIELD OVERLAY DISTRICT: o SHIRLEY A. HIGHFIELD NITROGEN SENSITIVE TITLE REFERENCE: DEED BOOK 3675, PAGE 119 ZONE: 28 PLAN REFERENCE: PLAN BOOK 238, PAGE 111 FEMA FLOOD ZONE DISTRICT: U3 Rp• ASSESSORS MAP: 23 1"PARCEL: O0 O 312 MINIMUM LOT SIZE: v m z ZONING DISTRICT: R-25 EXISTING LOT SIZE: < rn z LOCUS = SETBACKS: FRONT 30 � SIDE 15' EXISTING LOT COVERAGE: CROWELL REAR 20' v PROPOSED LOT COVERAGE: SLVERLEAF LANE m LOCUS MAP NOT TO SCALE WF#4 WF#3 `I, WF#7 DRAINAGE OVERFLOW 15601 S.F. WF#1 WF#2 m / a LOT 2 REVISIONS: NO. DATE DESC. NONE NOT A ZONE II — 7A9", DATED 7/2/92 PANEL #250015 — 25,000 S.F. — 18,421± S.F. 1,801± S.F. (10%) 2,719± S.F. (14.8%) I CERTIFY TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, INFORMATION AND BELIEF THAT THE LOT CORNERS, DIMENSIONS AND SETBACKS TO THE STRUCTURE AS DETERMINED BY INSTRUMENT SURVEY AND AS SHOWN ON THIS PLAN ARE CORRECT. 0" kap Q."_� .3/��/iy PROFE SIONAL LAND SURVEYOR DATE Cb w CERTIFIED PLOT PLAN 38 4g / v,. '/ . 41 ho 7` 28 \� AT V LOT 1 // ,t2 4Co , % % PROPTION RI ADDGN f m FL ORENCE LANE ass. o \ IN l 15• EXISTING ° WEST YARMOUTH DWELLING 0 g TOF 12.96 (IEW SU SDOM 20-2. MAS SAC H U S ETTS \TUBEEs (BARNSTABLE COUNTY) PROPOSED GALLON E0 I r M ~ 59.9 ! y.� _ZDMOSEo 10 ` ADDITIOGE k v, � i I LOT 6 \9 \�� \�\ `�. 18,421.t sl e 2p THE SEPTIC SYSTEM LOCATION DEPICTED HEREON IS BASED ON A 1982 DESIGN PLAN ON FILE AT THE YARMOUTH BOARD OF HEALTH AND IS APPROXIMATE. DIG SAFE REQUIRED PRIOR TO ANY EXCAVATION ON THE SITE. L_ BENCHMARK � � � .o � TOP OF CONCRETE BOUND. ELEVATION 10.00 NGVD MARCH 19s 2014 PREPARED FOR: Mr. KEN HIGHFIELD P.O. BOX 393 WESTON, MA 02493 978-443-6978 BSC GMUP 349 Route 28, Unit D West Yarmouth, Massachusetts 02673 508 778 8919 © 2014 The BSC Group, Inc. SCALE: 1" = 20' 0 2.5 5 10 urroa 0 10 20 40 mg PROJ. MGR.: CRAIG FIELD FIELD: P. HAGIST CALC./DESIGN: K. HEALY DRAWN: K. HEALY CHECK: CRAIG FIELD FILE: 9690 -CPP DWG. NO: 6245-01 SHEET 1 OF 1 JOB. NO: 4-9690.00