Loading...
HomeMy WebLinkAbout83-2051 - Site Plan1 � . 1 USE 8"x 8" CCA PT TIMBER CAP USE r REBAR CAGE WITH 1" MIN. CLEARANCE FROM SURFACE OF CONCRETE PILE. \ USE HELICAL ANCHOR MADE BY CHANCE OR SIMILAR. ANCHORS TO BE MICROPILE ENCASED WITH GROUT AND DEVELOP A MINIMUM HOLDING PRESSURE OF 12 KIPS. ALL ANCHORS TO BE HOT DIPPED GALVANIZED STEEL. MICROPILE TO TRANSITION TO 16" DIA. FORM AT GRADE. USE 2"X 6" CCA SILL PLATE USE J" MARINE PLYWOOD / O SUB—FLOOR / USE THRU BOLTS AT 2" OC WITH FULL 2"" WASHERS. PILE SECTION VIEW N. T. S USE 6"x 8" STEEL BRACKET USE 2"X 6" CCA SILL PLATE SITE PLAN I inch = 10 ft IICF 9" Y R" CCA CTP1mrrPG fW PLAN REFERENCES ASSESSORS MAP 121, PARCEL 12 DEED BOOK 28446, PG 147 FLOOD NOTE. FLOOD ZONE VE -14' NAVD88 AS SHOWN ON FEMA FIRM PANEL #25001CO059J REVISED JULY 16, 2014 DATUM NOTE: ELEVATIONS SHOWN HEREON ARE BASED ON NAVD88 DATUM MLW = —2.38' NAVD88 MHW = 4.33' NAVD88 , �L:1;UM21i11263 1. ALL WORK TO BE PERFORMED IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS AND THE ORDER OF CONDITIONS ISSUED BY THE YARMOUTH CONSERVATION COMMISSION. 2. ACCESS TO BE FROM THE UPLAND . STAGING AREA FOR MATERIALS TO BE IN THE DRIVEWAY, BACK YARD. 3. NO MACHINERY OR EQUIPMENT TO BOTTOM OUT ON THE MARSH. 4. CONSTRUCTION MATERIALS TO BE APPROVED BY ENGINEER PRIOR TO CONSTRUCTION. 5. DISTURBED AREAS TO BE REGRADED TO MATCH PRE—CONSTRUCTION CONDITIONS. 6. ALL EQUIPMENT TO BE INSPECTED FOR LEAKS PRIOR TO BEING ON SITE. A SPILL KIT WILL BE ON HAND DURING CONSTRUCTION. rnNICTRI IrTInM MnTC'c- 3E HOT DIPPED GALVANIZED STEEL TED BY THE ENGINEER. BE SOUTHERN YELLOW PINE OR ENGINEER PRIOR TO INSTALLATION. CCA OR APPROVED EQUAL DRIVEN PPROVED BY THE ENGINEER PRIOR )E 1 SOUTHERN YELLOW PINE. S RESPONSIBLE FOR THE REMOVAL R IS TO BE REPLACED AND ATTACHED SPECIFIED BY THE ENGINEER. )CATED WITHIN AN NHESP BOUNDARY )T SUBJECT TO MESA REVIEW. REVISIONS: No. DATE GENERAL NOTES: HYDROGRAPIIER: LAND & SEA ENGINEERING ROY OKUROTrSK1 PO Box 2907. Avon, Co 508-776-0956 TI TLE: Mill Lane Boat Douse Yarmouth,, MA Foundation Repair Permitting /Design Plan PREPARED FOR: Elizabeth Bishop ala��� 121%Lot 12 Yarmouth, SIA LEGEND EXISTING BOUND DATE: 1/20/2016 �e WOOD PILE COMP./DESIGN: ROY OKUROWSKI P.E. ---- FENCE CHECK: REO TB_2 DRAWN: REO ® TEST BORING SCALE: 1"=10' HOR u MOORING JOB NO.: Bishop —10 — — CONTOUR 1 OF 1 x-3.4SPOT GRADE 10 5 0 10 20 0 0 0 0 0 0 0 0 10't O.C. PILE SECTION VIEW N. T. S USE 6"x 8" STEEL BRACKET USE 2"X 6" CCA SILL PLATE SITE PLAN I inch = 10 ft IICF 9" Y R" CCA CTP1mrrPG fW PLAN REFERENCES ASSESSORS MAP 121, PARCEL 12 DEED BOOK 28446, PG 147 FLOOD NOTE. FLOOD ZONE VE -14' NAVD88 AS SHOWN ON FEMA FIRM PANEL #25001CO059J REVISED JULY 16, 2014 DATUM NOTE: ELEVATIONS SHOWN HEREON ARE BASED ON NAVD88 DATUM MLW = —2.38' NAVD88 MHW = 4.33' NAVD88 , �L:1;UM21i11263 1. ALL WORK TO BE PERFORMED IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS AND THE ORDER OF CONDITIONS ISSUED BY THE YARMOUTH CONSERVATION COMMISSION. 2. ACCESS TO BE FROM THE UPLAND . STAGING AREA FOR MATERIALS TO BE IN THE DRIVEWAY, BACK YARD. 3. NO MACHINERY OR EQUIPMENT TO BOTTOM OUT ON THE MARSH. 4. CONSTRUCTION MATERIALS TO BE APPROVED BY ENGINEER PRIOR TO CONSTRUCTION. 5. DISTURBED AREAS TO BE REGRADED TO MATCH PRE—CONSTRUCTION CONDITIONS. 6. ALL EQUIPMENT TO BE INSPECTED FOR LEAKS PRIOR TO BEING ON SITE. A SPILL KIT WILL BE ON HAND DURING CONSTRUCTION. rnNICTRI IrTInM MnTC'c- 3E HOT DIPPED GALVANIZED STEEL TED BY THE ENGINEER. BE SOUTHERN YELLOW PINE OR ENGINEER PRIOR TO INSTALLATION. CCA OR APPROVED EQUAL DRIVEN PPROVED BY THE ENGINEER PRIOR )E 1 SOUTHERN YELLOW PINE. S RESPONSIBLE FOR THE REMOVAL R IS TO BE REPLACED AND ATTACHED SPECIFIED BY THE ENGINEER. )CATED WITHIN AN NHESP BOUNDARY )T SUBJECT TO MESA REVIEW. REVISIONS: No. DATE GENERAL NOTES: HYDROGRAPIIER: LAND & SEA ENGINEERING ROY OKUROTrSK1 PO Box 2907. Avon, Co 508-776-0956 TI TLE: Mill Lane Boat Douse Yarmouth,, MA Foundation Repair Permitting /Design Plan PREPARED FOR: Elizabeth Bishop ala��� 121%Lot 12 Yarmouth, SIA LEGEND EXISTING BOUND DATE: 1/20/2016 �e WOOD PILE COMP./DESIGN: ROY OKUROWSKI P.E. ---- FENCE CHECK: REO TB_2 DRAWN: REO ® TEST BORING SCALE: 1"=10' HOR u MOORING JOB NO.: Bishop —10 — — CONTOUR 1 OF 1 x-3.4SPOT GRADE 10 5 0 10 20