Loading...
HomeMy WebLinkAbout83-1876 - Proposed Dock0024TS 16" O.0 DECK IEELS O 3'X12'RAMP O ADE RANGE 3.2 @ MOUTH OF RIVER 2.8 0 HIGHBANK BRIDGE M 2010 MEAN LOW WATER -0.79 0.00 MEAN SEA LEVEL 0.61 1.40 MEAN HIGH WATER 2.01 2.80 ------------ GLOBAL WARM/NG RISE 1N SEA LEVEL 0.98' PER 100 YEARS (NOAH) EXISTING BRICK/CONCRETE SEAWALL IS THE TOP OF COASTAL BANK EXISTING STAIRS TO BEACH PROrOSED RAMP `ro, TO PIER A 00. O yy O� AZ ,p DECK EL. 7.0 2.8 MHW (2010) 20 3/4' GAP 1.0 _- -- -- 0. 0 ML W (2010) -1.0 -__ - -- - FLO -2.0- - - CHAIN IN RUBBER -30 - BRACKET —4.4 "'4 `:;a`k�` " " < �1xF' .("R ,6 FLOAT STOPS TO BE INSTALLED RAMP PROFILE DETAIL TYPICAL NOT TO SCALE REV. REV. DATE MAR. '11, :2010` SCALE 1 = 20' REV -APR. 20, 2010* FJOE3 N0. 6723-00 RMAUG. 18, 2010]1[__LOCATION ADE RANGE R"�JULY-20, 2010 3.2 @ MOUTH OF RIVER 2.8 0 HIGHBANK BRIDGE M 2010 MEAN LOW WATER -0.79 0.00 MEAN SEA LEVEL 0.61 1.40 MEAN HIGH WATER 2.01 2.80 ------------ GLOBAL WARM/NG RISE 1N SEA LEVEL 0.98' PER 100 YEARS (NOAH) 2010 - 1929 = 81 YEARS 0.98X81 =0.79' EXISTING BRICK/CONCRETE SEAWALL IS THE TOP OF COASTAL BANK EXISTING STAIRS TO BEACH PROrOSED RAMP `ro, TO PIER A 00. O yy O� AZ ,p DECK EL. 7.0 2.8 MHW (2010) 20 3/4' GAP 1.0 _- -- -- 0. 0 ML W (2010) -1.0 -__ - -- - FLO -2.0- - - CHAIN IN RUBBER -30 - BRACKET —4.4 "'4 `:;a`k�` " " < �1xF' .("R ,6 FLOAT STOPS TO BE INSTALLED RAMP PROFILE DETAIL TYPICAL NOT TO SCALE REV. REV. DATE MAR. '11, :2010` SCALE 1 = 20' REV -APR. 20, 2010* FJOE3 N0. 6723-00 RMAUG. 18, 2010]1[__LOCATION R"�JULY-20, 2010 SHEET 1 OF, 1I MAP C: S8 PROD 5083-212 DWG 5083— DOCK— 4.dwq 02010 SWEETSER ENGINEERING