Loading...
HomeMy WebLinkAboutEngineered Plans - 2016r PROPOSED SEWER CONNECTION - --101-- EXISTING CONTOUR N EX/STING LEACH PIT CONNECT TO EXISTING PIPE AT, OR x 100.98 EXISTING SPOT GRADE �hP TO BE PUMPED, FILLED ABOVE, INV.=93.70 W/SAND &ABANDONED X1,1 -EXISTING WATER SVC. Rook 76,70 (SEE ALSO, NOTE 11) EX/STING SEPTIC TANK INV(OUT)=99.0±LOCUS —8;/-/,•W—OVERHEAD WIRES C Ra U� x TEST PIT v BENCHMARK -2 Ai BENCHMARK `� oP COR.180TTOM STEP EL.=98.95 LEGEND o� d • 0 o o s� �a N \02.238,6$2.0 r � 0 , d \ Yy Route 6 _ Mid—Cape Hwy s�o e \x 1 3 BENCHMARK -1 96,13 r 12'--�``'`.; �� 8,9 O �s' x VENT \ 10 .74 x \ \ \ \ COR./BOTTOM STEP EL. =.90 LOCUS MAP 103 NOT TO SCALE % •°— 102.2 7 - GENERAL NOTES: x 10-5%\ 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL X BOARD OF HEALTH AND THE DESIGN ENGINEER. 95,83 \ �,: J� V \ L - - \ O 3'�, • � 107. 6 � 111.79 2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS •� Tp � O 1 1z �\ �� ENVIRONMENTAL LE 7BM-1 \ S 9 x 103 5 a LATIONS, EXCEPTLASVREQUDES ED BELOW:B A D REGULATIONS, LOCAL a 10 .20 ( TBM-2 ��`J x 10,43\ ti ' -310 CMR 15.405(1)(b): CONTENTS OF LOCAL UPGRADE APPROVAL ... ';•. ``.' 8,27 `.:: 1x3,9 \ 1 A 2' variance to the 3' maximum cover requirement, for 5' ) q 02.8rX DECK ��^ ti108,5 of cover over the S.A.S. Venting is required. 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE O \ \ \ DESIGN ENGINEER. x - e = - `�' ti 0iHOUSE(#2) EXISTING 8,16,. �P 0391 - 06,06 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN :<:J"'ENGINEER BEFORE CONSTRUCTION CONTINUES. R � + 97,45 -� 104,2 b; r''- S i c J ^' `95.4 2i x - r o T.O.F.-105.4f !?�q 98,34 j li 5. ALL ELEVATIONS BASED ON AN ASSUMED DATUM. C _'- 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF JO N - THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF LOT 21 / z CHU ILI 0 HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION. 13,778 fSF �% 00 �j� 80 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE. 8. THERE ARE NO WELLS WITHIN 100' OF THE PROPOSED S.A.S. si _ a �+ S QI IO PAR EL O' ' ID. 5-038 103.29 .' cV0/ S q, gt 9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS AGREED UPON BY OWNER AND CONTRACTOR OR AS OTHERWISE E' 5.84 I DIRECTED BY THE APPROVING AUTHORITIES. r x 9952 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY 10:3,08 THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING x 100.77 pF R4SX, Sq� 11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS 5' SIDES OF THE S.A.S. AND IN THE AREA BENEATH AND FOR ON ALL PETER T. REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3). 0 x 104,60 �� CD McENTEE 12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE CIVIL " PRIOR TO BACKFILL. DECK CBN Q Q ':.`" . . INSPECTED BY DESIGN ENGINEER 35109 96,35 ® 96,6k 6` �- 104,38 No. 13. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND NOT CONSIDERED TO BE A PROPERTY LINE SURVEY. �o E G(SZF��� 14. THE ENGINEER IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED SEPTIC SYSTEM COMPONENTS NOT SHOWN ON THE PLAN BAT" KITCHEN DIN. RM. 9772 BEDROOM x 10131 PROPOSED SEPTIC SYSTEM UPGRADE PLAN p LIV. RM. BEDROOM 99,00 2 ZEPHYR DRIVE, YARMOUTH PORT, MA BEDROOM 100.02 Prepared for: Pastore Excavation, P.O. Box 1289. Forestdale, MA 02644 OWNER OF RECORD r%' 7•� g eering by: Surveying by: SCALE DRAWN JOB. N0. 100.70 Engineering - COTTO, MICHAEL T Engineering Works, Inc. JC Engineering, Inc. 1 "-20' P.T.M. 215-16 FLOOR PLAN COTTO, LOUISE 2 ZEPHYr DRIVE 12 West Crossfield Road 2854 Cranberry Hwy. Forestdole, MA 02644 E.Wareham, MA 02538 DATE CHECKED SHEET NO. YARMOUTH PORT, MA 02675 (508) 477-5313 (508) 273-0377 9/23/16 P.T.M. 1 of 2 NOTE: TO PREVENT BREAKOUT, FINAL GRADE SEPTIC TANK SHALL NOT BE AT, OR BELOW, EL.=93.5 TING..'-',EXIS INSTALL RISERS & COVERS OVER INLET & PROPOSED D -BOX FOR A DISTANCE OF 15' FROM THE EDGE 'HOUSE(#2) , OUTLET AND SET TO 6" OF FINISH GRADE INSTALL RISER & COVER SET TO 6" OF GRADE OF THE PROPOSED S.A.S. PROPOSED S.A.S. C,qR PROPOSED SEWER CONNECTION INSTALL RISER & COVER OVER ONE CHAMBER AND SET TO 3" OF F.G. TO', SERVE AS INSPECTION PORT GE U O T.O.F=105.01CONNECT TO EXISTING PIPE AT, OR F.G. EL.=103.1± F.G. EL.=103.0± ABOVE, INV.=93.70 ��-- F.G. EL -98.5± F.G. EL.=97.0 to 98.5± VENT r MAINTAIN 2% SLOPE OVER S.A.S. ' L = 40' ' ® S=1% (MIN.) ®S=1%5(MIN.) LAYER OF ^, •'• • ' ----, 4' SCH40 PVC 4' SCH40 PVC 2 pc* N I 6; DOUBLE WASHED S ONE2„ 4b 10"1 t____; 6" 6363 as (OR APPROVED FILTER FABRIC) EXISTING 48" LIQUID 14 OLD D -BOX as®a®aa---3/4" TO 1-1/2" DOUBLE LEVEL ADD INV.=93.27 PROPOSED 4 4.8' 4' WASHED STONE ^O cAs BAFFLE EFFECTIVE WIDTH - \\ INV.=99.0± 3 OUTLETSD INV.= 93.00 112.8' �� / 00 EXISTING SEPTIC TANK 2-500 GALLON LEACHING 'CHAMBERS / d g• SURROUNDED WITH STONE � AS SHOWN c_'P H-20 RATED 'el/// pQ NOTES: 1) CONTRACTOR SHALL VERIFY ALL EXISTING PIPES & TOP CONC. ELEV.= 94.1± ELEV.= 93.50ease �\ / SEPTIC LAYOUT INVERTS EXITING HOUSE, PRIOR TO INSTALLATION. BREAKOUT INV. ELEV.= 93.00 2) D -BOX SHALL BE SET LEVEL AND TRUE TO GRADE aaaaa a0000. mu E038082@1.1 ON A MECHANICALLY COMPACTED SIX INCH CRUSHED STONE STONE BASE, AS SPECIFIED IN 310 CMR 15.221(2). BOTTOM ELEV.= 91.00 4' 2 x 8.5 = 17.0' 4' 3) INSTALL INLET & OUTLET TEES AS REQUIRED. 4' OF NATURALLY OCCURRING EFFECTIVE LENGTH = 25.0' 4) GAS BAFFLE TO BE INSTALLED ON OUTLET TEE PERVIOUS MATERIAL AS MANUFACTURED BY TUF-TITE, ZABEL OR EQUAL. 5' (MIN.) ABOVE G.W. LEACHING SYSTEM SECTION ® ® ® ® O 6a E3 E3 E3 5) PROPOSED ELEVATIONS MAY BE ADJUSTED WITH PRIOR BOTTOM OF TEST PIT, EL.=86.1 = ® ® ® ® ® ® ® ® ® ® ® 37" APPROVAL OF THE BOARD OF HEALTH AND DESIGN F_ ®®®®®®®®®® ENGINEER DEPENDING ON SOIL CONDITIONS AND N > E3 ®®®®®® ® Ea SEWER CONNECTION INVERT ELEVATION. Z SEPTIC SYSTEM PROFILE 102" DESIGN CRITERIA SOIL LOG 4" KNOCKOUT NUMBER OF BEDROOMS: 3 BEDROOMS DATE: SEPTEMBER 14, 2016 20" DIA. COVER SOIL TEXTURAL CLASS: CLASS I (LOADING RATE=0.74 GPD/SF) SOIL EVALUATOR: PETER McENTEE PE(SE#1542) DESIGN PERCOLATION RATE: <2 MIN/IN WITNESS: AMY VON HONE R.S. HEALTH AGENT 4" KNOCKOUT 4" KNOCKOUT 58" 0 E TP DEPTH DAILY FLOW: 330 GPD 0" DESIGN FLOW: 330 GPD 97'7. 3 3 4" KNOCKOUT GARBAGE GRINDER: NO -not allowed with design FILL LEACHING AREA REQUIRED: (330 GPD) = 445.9 SF 96.1 A 14" 500 GALLON CAPACITY, H-20 LOADING .74 GPD/SF L�OYR 4�z CHAMBERS EXISTING SEPTIC TANK: 1000 GALLON CAPACITY 95.3 24" PROPOSED D -BOX: 1 INLET, 3 OUTLET (MINIMUM), H-10 RATED LOAMY SAND PERC 30"/48" N.T.S. 2.5Y 6/6 PROPOSED SEPTIC SYSTEM UPGRADE PLAN USE 2-500 GALLON LEACHING CHAMBERS IN SERIES SURROUNDED BY DOUBLE WASHED STONE ON ALL SIDES 92.3 C 60" Z ZEPHYR DRIVE, YARMOUTH PORT, MA SIDEWALL AREA: 2(12.8' + 25.0') X 2 = 151.2 S.F. M -C SAND 2.5Y 6/6 BOTTOM AREA: 12.8' x 25.0' = 320.0 S.F. Prepared for: Pastore Excavation, P.O. Box 1289. Forestdale, MA 02644 Engineering by: Surveying by: SCALE DRAWN JOB. NO. 471.2 S.F. II 86.0 134" TOTAL AREA: .................................. ........................... PERC RATE <2 MIN/IN. "B" HORIZON Engineering Works, Inc. JC Engineering, Inc. N.T.S. P.T.M. 215-16 DATE CHECKED DESIGN FLOW PROVIDED: 0.74 GPD SF 471.2 SF = 348.7 GPD /( ) NO GROUNDWATER ENCOUNTERED 12 west Crossfield Road Forestdale, MA 02644 Cranberry Hwy. E.Wareham, MA 02538 .Wa SHEET NO. (508) 477-5313 (508) 273-0377 9/23/16 P.T.M. 2 Of 2