HomeMy WebLinkAboutEngineered Plans - Rev. 2016Existing
Water Line
Driveway
_._... w ., Porch «.
34
32
NExisting 1,000
Galion Septic Tank
30� To Remain
.(rt,°I
Garage
38
Utility I
IN Val Q� ,1�y
vlxkk Q�,�,,0 5°
Q N NO 97
Existing 1,000 /
Gallon SepticTank
�a Remain ,,. 36 L ��
rHouse #4 I
34 w
c �
--- See Note #19 0'
� d
32 , � N ool $�
y�
Deck i `'c
House #4
6 Bedrooms,,,
NAD 86.x, -
Slab TSM EL = 305 `7
Deck
124
"'"""""" Patio
Lot 10
0.87± Acres
22 ��
Ar M1
2
1Teo Zola@ AE ELS" g`^,..'""" r--�
w.... Appy rox� ► ate Ed ~
9e ofWet an s
�9h Waterer Ma
9g
Shed
�a
See Note #19
rim
Pool
24
0F 4f4�
"---�� STEPPHO
►turimat opo oasts B.
an No. 393a,
B
6
20
10
Proposed
Liner
Din Bdr1'aJ
Bdr
Kit down Liv Bdr
2
Entry
UDDer Floor
N.T.S.
Bath lh
Bddr Tsat
Bdr I
Family I
Bq r
Lower Floor
Yarmouth Health Department
PP. OVED
Name Date
a 40 60
SCALE 1 "=20'
R =27.21'
L = 24.04'
Yarmouth, MA
LOCUS
No.
so.
1.) Assessor's Map 127 Parcel 53
z.) p1026736
3.) L.C. Plan 23382-B Lot 14
4.) This property is not in the State Approved
Zone 11 Water District
5.) This property is n Flood Zone AE BFE = 9.0
Map 25001 C0579J Date 7/16/14
LEGEND
(48.0) EXISTING SPOT GRADE
24xs PROPOSED SPOT GRADE
—24— PROPOSED CONTOUR
—•--ohw-.— OVERHEAD UTILITY LINES
----w WATER LINE
-�— G --- GAS SERVICE LINE
�..++.�..� EDGE OF CLEARING
FENCE
TEST HOLE LOCATION
ST SEPTlCTANK
D8 DISTRIBUTION BOX
SAS SOIL ABSORPTION SYSTEM
O
Q�n1SR
oa
m
.a
c
u.
Lacus Ma R'i'o °y 7-4
Prepared for:
Susan M.. Carnathan
4 Driftwood Lane Yarmouth Port, MA
Preliminary Sewage Disposal System
4 Driftwood Lane Yarmouth Port, MA
Prepared by:
All Cape Septic LLC
618 Route 28
West Yarmouth, MA 02673
(508) 771-4200 Email; allcapeseptic@gmail.com
Date: 10/13/16
Sheet 1 of 2 By: MA Check: SM Project No. AC -67
1.) ALL WORK SHALL CONFORMTO THE STATE ENVIRONMENTAL CODE, TLTLE 5 (310 CMR 15.000):
STANDARD REQUIREMENTS FORTHE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND
EXPANSION OF ON-SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THETRANSPORT
AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS.
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR
VEHICLES OR HEAVY Et1UIPMENTTO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20
LOADING. IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE V4NTED TO THE ATMOSPHERE
3J To MINIMIZE UNEVEN SETTLING, SEPTICTANKS AND D40X SHALL BE INSTALLED ON A STABLE
MECHANICALLY COMPACTED BASE ON SIX INCHES OF CRUSHED STONE,
4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTICTAN K, THE DISTRIBUTION BOX, AND
THE SOIL ABSORPTION SYSTEM SHALL BE RAISEOTO WITHIN 6" OF FINAL GRADE. LEACHING
FIELDS, TRENCHES. AND OTHER SOIL ABSORPTION SYSTEMS WITHOUT ACCESS MANHOLES SHALL
HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4" PVC PIPE PLACED
VERTICALLYTOTHE BOTTOM OFTHE SOIL ABSORPTION SYSTEM WITH A CAP,TIED WITH MAGNETIC
MARKINGTAPE, ACCESSIBLE TO WITHIN 3' OF FINAL GRADE
5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT, PIPE SHALL BE LAID ON A
MINIMUM CONTINUOUS GRADE OF NOT LESSTHAN 2% FROM THE BUILDING TO THE SEPTICTANK,
AND NOT LESS THAN i%OTHERWISE.
6.) DISTRIBUTION LINES FORTHE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40
PVC (OR EQUIVALENT) LAID AT 0,005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED
AT END OR AS NOTED.
7.) LINES FROM THE DISTRIBUTION BOX 70 BE LEVEL FORTHE FIRST TWO (2) FEET BEFORE
PVCHINGTOTHESOIL ABSORPTIONSYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO
ASSURE EVEN DISTRIBUTION.
84 GROUTTO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES
IN ORDERTO PROVIDE A WATERTIGHT SEAL,
9J HEAVY EQUIPMENT SHALL NOT BE ALLOWEDTO OPERATE OVERTHE LIMITS OF THE SEWAGE
DISPOSAL FIELD DURINGTHE COURSE OF CONSTRUCTION OFTHE SYSTEM,
10.) IN ACCORDANCE WITH 310 CMR 13.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH
MAGNETIC MARKING TAPE.
11JTHERE ARE NO KNOWN WELLS WITHIN 100' OFTHE PROPOSED SOIL ABSORPTION SYSTEM.
12.) FROM THE DATE OFTHE INSTALLATION OFTHE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF
THE CERTIFICATE OF COMPUANCE,THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT
USE OFTHE AREA THAT MAY CAUSE DAMAGE TOTHE SYSTEM.
13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN ON PLAN, ANY CHANGES SHALL BE APPROVED IN WRITING BYTHE
DESIGNER.
14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE
BOARD OF HEALTH AND THE DESIGNER, THE DESIGNER SHALL CERTIFY IN WRrnNGTHATTHE
SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OFTHE PERMIT
ANOTHE APPROVED PLANS, 48 HOURS ADVANCE NOTICE IS REQUESTED.
I SJ L OCAnON OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR
DETERMININGTHE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIORTO
COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT UMITEDM REQUESTS TO DIGSAFE,
ANY PRIVATE UTILITY COMPANIES, ANDTHE LOCAL WATER DEPARTMENT.
163 CONTRACTOR SHALL VERIFY THAT ALL WASTEUNES ARE CONNECTED BY WATERTESTING
WITHIN THE DWELLING PRIORTO INSTALLATION OF ANY SEPTIC COMPONENTS.
17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIORTO INSTALLATION OF ANY
SEPTIC SYSTEM COMPONENTS.
I 8.)TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE,TITLE S. SOILS CAN BE
VARIABLE ANDTEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF
SOILS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER LS TOINSPECTTHE
SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
193 EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY, FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE OR REMOVED AS REQUIRED. AREATO BE COMPACTEDTO MINIMIZE SETTLING.
20J WATERISEWER CROSSING: 2" PVC WASTELINE SHALL BE SLEEVED IN A 20' SECTION OF
4" PVC PIPE CENTERED OVER THE WATER LINE TO MAXIMIZE DISTANCE TO JOINTS,
TOP OF SLAB MMRMUM 2' DAM 0 C0NaEM T
EL= 30.5 covERs)wsEorowmuNs of
1V.1H' RACIE (0.=-7 ) Q.gox Riser Extension PROVIDE INSPECTION PORTSTO
EXISTING EL 30.4 to within 6" or gradeMINIMUM 9" OF COVER WITHIN 3" OF FINAL GRADE
numavBB � 20.41
OVER PRECAST
Top 29.0
Filter Fabrtc
26.6
18.2 LIQUID LEVEL s
INVERT EL 27.7
INVERTEL 10^ 14^ 27.41 26.4 26.23
INVERTEL INVERT EL iRwnr 6.1
INSTALLTEE AND GAS BAFFLE AT OUTLET a Si0M:8i
Proposed 25.2 THIRTI' EIGHT (98)INFILTRATORARC'J61iC(A61iiBD2)LEACH CHAMBERS UN[i'S
IN RED CONFIGURATION INTWO (2) ROWS OF NINE (9) UNITS AND
(DB 6) FOUR (4) ROWS OF FIVE (S) UNITS,
D -Box
e'sraaBUE 47'-----10' ---- LEACHCHA CHAMBERS
15± Back Yard Longest Run 30 (THIRTY EIGHT) INFILTRATOR UNITS
Existing 1,000 Gal EL=1$A Bottom Test Hole
Septic Tank FLOW PROFILE
TOP OF FOUNDATION
EL 37.0
To Remain NOTTO SCALE
=
EXISTING EL 31.2
F= 'Rnn F� SYSTEM DESIGN CALCULATIONS
OVERPREC40
INVERT EL 29.9 /
INVERTEL 1(r
Existing ta"
To Remain
INSTALLTEE AND GAS BAFFLE AT OUTLET
20* Side Yard i 44. I
f Existing 1,000 Gal r
Septic Tank
To Remain
45.0'
INSPECTION PORTS
Leaching Field Detail
N.T.S.
. -i -•- B ■-�B r- e n' -
Test Hole #1 (EL=29.4±)
1 Ca I rl V LC LV V
Depth
Eiev,
Layer
Soil Gass
Soil Color
Comments
0"- 6"
28.9
A
Sandy Loam
1 OYR 3/,1
6"- 35"
26.5
B
Loamy Sand
10YR5/6
35"-132"
18.4
C
Medium Sand
2.5Y6/3
No Standing Groundwater Encountered'
DATE OF TESTING: 9/14/16
SOIL EVALUATOR: SCOTT MCGANN
BOARD OF HEALTH AGENT: AMY VON HORNE
PERCOLATION RATE: LESS THAN 2 MIN/INCH IN "C" LAYER AT 71"
SEWAGE DESIGN FLOW REQUIRED: 6 BEDROOM DWELLING @
110 GPD / BEDROOM = 660 GPD REQUIRED
SEWAGE DESIGN FLOW PROVIDED: THIRTY EIGHT (38) ADS UNITS IN BED
CONFIGURATION IN TWO (2) ROWS OF NINE (9) UNITS AND
FOUR (4) ROWS OF FIVE (5) UNITS.
CAPACITY = 45'X 2 ROWS X 4.80 SF/LF = 432 SF/LF
205 X 4 ROWS X 4.80 SF/LF = 480 SF/LF
912 SF/LF X 0.74 = 674 GPD
674 GPD PROVIDED > 660 GPD REQUIRED
SEPTICTANK CAPACITY REQUIRED: 660 GPD X 200 %=1200 GPD REQUIRED
SEPTICTANK CAPACITY PROVIDED: TWO EXISTING 1000 GALLON SEPTIC TANKS
A GARBAGE DISPOSAL IS o PERMITTED WITH THIS DESIGN FLOW
Assessors Map 127 Parcel 53
Proposed Sewaoe Disposal Svstem
1 4 Driftwood Lane Yarmouthport, MA I
Prepared for:
Prepared by:
All Cape Septic LLC
Susan M. Carnathan
618 Route 28
4 Driftwood Lane
West Yarmouth, MA 02673
Yarmouth Port, MA
(508) 771-4200
alicapeseptic@gmaii.com
Date: 10/13/16 1 Sheet 2 of 2
By: MA I Check: SM I Project No. AC-67-Sht2
Rev Date:10/13/16 Elev's Medium Sand Date of Perc