Loading...
HomeMy WebLinkAboutEngineered Plan - 2016O(� D 7A � m N r 4 o '0;0 LOCATION211.7 367 MAP LOT5F) ASSESSORS MAP: 77 PARCEL: 19 PLAN BOOK: 249, PAGE: 113 KEY: EXISTING CONTOUR: - - - - PROPOSED CONTOUR: ............. EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5 TEST HOLE: . UTILITY POLE: -0-- FENCE LINE: - HYDRANT: RETAINING WALL: BENCHMARK AT RIGHT CORNER OF BULKHEAD ELEVATION = 100.90 SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY SEPTIC TANK: 330 GAL / DAY x 2 DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 250F STONE AROUND SIDES AND 2' AT ENDS (29.5'x 9.8'x 2' DEEP) SIDE AREA: (29.51+ 9.81 x 2 x 2 = 157 SF (0.74) =_11 6 GAUDAY BOTTOM AREA: 29.5'x 9.8'= 289 SF (0.74) = 214 GAUDAY CAPACITY = 330 GAUDAY SEPTIC SYSTEM SECTION 102.75 TOP OF ° FOUNDATION 99.3 ELEV. a ° 98.6 ELEV. ° 1000 GAL SEPTIC TANK TEE SIZES: (TO BE CONFIRMED) INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN BED CAPTAIN B{,AGG READ I I I ROOM I ROOM LIVING W I ROOM ;S2fi�e- 98 98 i T \ 99 N 84° • E 89.80' .4 - P 100 99 \ ` N; W �O� 101 - 101CD / < _ / CD \ Z to \ � cn .O wo.2 )01 Oz` Ah Z o I 100 i i i Q Y� 0" I\ i � 100 99'�r^\ M16-55 ® 99 �ooI'v O�oQ Fes` Poo >, ` th-1 4-98.5010„ W \� S 805 � 101 101 100 100 Off' / t oo' I i 41 100 10' BEDDINING BATH ROOM KITCHEN AREA BATH bh sh DECK EXISTING FLOOR PLAN zw/ 21- /////r, 42 (EXISTING) OF D -BOX (6" STONE UNDER) -GAS BAFFLE AT OUTLET TEE T MAX. COVER (1' MIN) ELEV. TEST HOLE LOGS GARAGE ENGINEER: THOMAS McLELLAN, P.E. WITNESS: PHIL RENAUD DATE: 10-6-16 PERCOLATION RATE: < 2 MIN/IN Permit valid for REPAIR OF SEPTIC SYSTEM ONLY;. due; `to State and local septic variances. ,Board ofHealthreview and approval is required for - any, future add itions/rend% ations/aIterations to sewage facilitie's and/or.structures/dwelling. ,Yarmouth Health Ucnartment APF0v. G RECEIVEID DEC 0 2 2016 . HEALTH DEPT, H OFM,is`"cyG TERRYs� o ANN WARNER' `� NO. 38721 o - PEASTONE OR FILTER FABRIC 3/4" -1 1/2" WASHED STONE INSPECTION PORT ,-- ELEV.= 97.83 ^1.1 1 95.0 H, 5, ELEV. 29.5'x 9.8' 3 - 500 GALLON CHAMBERS WITH 2.5' OF STONE AROUND SIDES AND 2' AT ENDS (29.5'x 9.8'x 2' DEEP) TH-1 100.5 FILL ELEV. 0/A HORIZON LOAMY SAND 10YR 3/1 99.0 B HORIZON LOAMY SAND 10YR 6/8 97.8 C HORIZON P MEDIUM SAND ERC AT 55" 2.5Y 7/4 138"1 1 89.0 NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 31. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 13. EXISTING LEACH PIT IS TO BE PUMPED AND REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 15. THIS PLAN REQUIRES THE FOLLOWING VARIANCE FROM TITLE 5: SECTION 15.211 (1): LEACH AREA TO BE LESS THAN 20' FROM BULKHEAD, (VARIANCE OF 1'). SITE PLAN )I LOCATION: 74 CAPT. WRIGHT RD." S. YARMOUTH, MA PREPARED FOR: SUSAN ROLLINS DATE: 10-12-16 SCALE: 1" = 20' V um l fy _ _ BASS RIVER ENGINEERING THOMAS J. McLELLAN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048 a = SITE PLAN )I LOCATION: 74 CAPT. WRIGHT RD." S. YARMOUTH, MA PREPARED FOR: SUSAN ROLLINS DATE: 10-12-16 SCALE: 1" = 20' V um l fy _ _ BASS RIVER ENGINEERING THOMAS J. McLELLAN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048