Loading...
HomeMy WebLinkAboutEngineer Certification Letter MORAN ENGINEERING ASSOC ., LLC 941 Main Street, P.O. Box 183, South Harwich, MA 02661 Daniel P. Croteau, PE (508)432-2878 Richard Judd, RS Michael Ladue, PLS FAX(508) 432-3501 MoranEng@gmail.com �������� October 26, 2016 ��"�1 ','� �ti��� HEALTH DEPT. Yarmouth Health Department _ _ _-- - -- - _._ _ 1146 Route 28 - --- --- -- —___-- -- ----- South Yarmouth, Ma 02664 Septic Svstem Installation Certification Letter Re: Moran Engineering Assoc., Project #10-130, plan date: 1/14/15, rev.7/14/15 124 Pawkanawkut Drive S. Yarmouth, Ma This letter serves to inform the Yarmouth Health Department that on 8/24/15 I inspected the leaching area soils excavation and on 9/4/15, I inspected the completed septic system installation at the referenced property. I found that the septic system was installed in compliance with 310CMR:15.000, the approved design plan dated 1/14/15, rev.7/14/15, and the Yarmouth Board of Health Regulations. ___����.. __ _ __ Sincerely, ,�� Daniel Croteau, PE Civil Engineering • Land Surveying