Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
46 Powers Lane Septic System Upgrade Site Plan
SOIL TEST PIT DATA NOT TO SCALE TEST PIT TP -1 GRD. EL 5.9 SHGW EL 1.5 EL 5.2 EL 3.4 EL 3.1 EL 1.5 EL (-0.6) EL (-2.1) SAND 8 Bw LOAMY SAND 10YR 5/6 3 C FINE SAND 2.5Y 6/4 � 7 c EL 5.0 30" 1" EL 2.9 2' EL 1.5 g• EL (-0.3) S. EL (-2.0) ONSITE SOIL EVALUATION TEST PIT TP -2 GRD. EL 6.1 SHGW EL 1.5 LOAMY SAND Bw LOAMY SAND 10YR 5/6 C FINE SAND 2.5Y 6/4 Z _N SYSTEM PROFILE ELEVATIONS TOP OF FOUNDATION 11.00 NOT TO SCALE 4' INVERT AT BUILDING 6.43 B 4" INVERT AT SEPTIC TANK (IN) 4" SCH. 40 PVC C NER 4" INVERT AT SEPTIC TANK (OUT) 7.96 L=2.0 FT. 9 No.46206 40 c SSS/ONALE�G . EL=A S=0.02 77"92 E TOP FOUNDATION FIRST PIPE LENGTH F . ELEVATIONS AT LEACHING FACILITY: 4" SCH. 40 PVC XL TO BE SET LEVEL FINISH GRADE 7_76 L-11 FT FOR MIN. 2' 9.8-10.2 H -10.3 S=0.02 :4- 2 8/12/15 FINISH GRADE SCH. 40 PVC 40 1 10.2-10.5 MO FT POU S=0.015 TOP BOT. 14" PPVED/�� Ai me Date PREPARED FOR: BRIAN BADRIGIAN 89 MOUNT AUBURN ST, UNIT B 9.0 I=8 1=D BSC GROUP 349 Route 28, Unit D W. Yarmouth, Massachusetts EL=8.0 I=C I=E �l=G=G _ H 1 F © 2015 BSC Group, Inc. SCALE: 1" = 10' EL=6.5 FILE: P-/prj/4986600/C'm1/_Drawings/4986600-SEP.dwg DWG. NO: 6271-02 �.. DISTRIBUTION 5.1' SEPARATION LEACHING ;••, 37' 1.500 GALLON BOX CHAMBERS SEPTIC TANK J 8� SEASONAL HIGH GROUNDWATER MAGNETIC REFLECTIVE TAPE SHALL BE PROVIDED IN THE TRENCH OVER ALL PVC PIPING 58" 77" 97" SCHEDULE OF ELEVATIONS TOP OF FOUNDATION 11.00 A 4' INVERT AT BUILDING 6.43 B 4" INVERT AT SEPTIC TANK (IN) 6,21 C NER 4" INVERT AT SEPTIC TANK (OUT) 7.96 D 9 No.46206 40 c SSS/ONALE�G . 9 4" INVERT AT DIST. BOX (IN) 77"92 E 4" INVERT AT DIST. BOX (OUT) 7_75 F . ELEVATIONS AT LEACHING FACILITY: MASSACHUSETTS (BARNSTABLE COUNTY) 4" INV. AT LEACHING CHAMBERS 7_76 G (BRKOUT 7.7) BOTTOM OF LEACHING CHAMBERS _6,60 H ADJUSTED SEASONAL HIGH GROUNDWATER 1.50 J DATE OCTOBER 20, 2014 ;i� PROPOSED MAP TEST BY. BSC GROUP, INC. PARCEL54 RESERVE AREA t WITNESSED BY: PHIL RENAUD, BOH. N/F iT) 1 I } LICENSED SOIL EVALUATOR: KIERAN J. HEALY. SE V.F. PROPERTIES REV. T. PERCOLATION RATE < 2 MINS./INCH 41 DOHERTY LANE j SOIL CLASS: CLASS 1 LT.A.R.: 0.74 GPD/S.F. 1 Y W 69.14' LEGEND } 563IB'3D" } � 1 } UNSUITABLE ESTIMATED i Z SEASONAL HIGH �' } MATERIALS - PROPOSED 1 Lj (TO BE REMOVED) GROUNDWATER DRAINAGE AREA PROPOSED #I - - FLOOD VENTS ® u IM OBSERVED (TYP) BOT. 7.3 PEROOLATIOOON - GROUNDWATER 27 7TEST CK _• - D tl } DRIVEWAY } J } I g ILOi G - -POSED � } } N } 100' BUFFER 5. OASTAL DUNE SEASONAL HIGH GROUNDWATER � T �r ADJUSTMENT } t G)l _ DEPTH TO OBSERVED WATER -,,E "} } } MEAN HIGH WATER 1.5 15.7 V: a _ OBSERVED WATER (-0 3)_ < 300' TO THE OCEAN - UNDER TIDAL INFLUENCE } z } o Q I DWELLING rs i o e xrCRA / c ) PROPOSED v t m T GENERAL NOTES , , PATIO .,_.; f �h :: 1. THE EXISTING DWELLING AND ALL UTILITIES ARE TO BE COMPLETELY REMOVED FROM THE SITE.MRQ'x� '' m�€' AS � I GAS 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO 310 CMR 15.000 AND YARMOUTH A4IC 5' I} t m" BOARD OF HEALTH REGULATIONS. 3. THERE ARE NO KNOWN OR PROPOSED PRIVATE WELLS LOCATED WITHIN 150 FT OF THE PROPOSED zo r LEACHING FACILITY. a' S )' w _g>+ GA I S 4. IF AN OVERDIG IS SPECIFIED. REMOVE ALL TOPSOIL, SUBSOIL AND OTHER UNSUITABLE MATERIALS. • \ ' 4 Rt +X" §' `£` �!': ; '431x4 ,'.:'�. F - I 5. IF AN OVERDIG IS SPECIFIED, REPLACE ALL EXCAVATED MATERIALS WITHIN THE LIMIT OF EXCAVATION WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETRIOUS SUBSTANCES r"}o MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL SHALL NOT BE USED. FILL SHALL NOT CD43\ I _ 1 0 / } NI } 5.O Bl CONTAIN ANY MATERIAL LARGER THAN 2 INCHES A SIEVE ANALYSIS USING A #4 SIEVE SHALL BE T�( Q R TO t I - I j - I I , / } ' COAS PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL UP TO 45% BY WEIGHT MAY BE RETAINED ON PROPOSED WATER UN THE #4 SIEVE. SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE SERVICE TO BE F IG :: SLEEVED WITHIN 10, OF � •�' /�' :�` � I } FOLLOWING SPECIFICATIONS: LEACHING AREA : •� , :. :$ i TP '/ DB o ®I 100% MUST PASS #4 SIEVE MAP 15 O I 10% MUST PASS #50 SIEVE PARCEL 2 �.I t 0-20X MUST PASS #100 SIEVE N MUST PASS 200 SIEVE C40 POWERS ELANEC I PROPOSED 0-5% /_ 6. EXISTING UTILITIES WHERE SHOWN ON THE PLANS ARE APPROXIMATE. THE ENGINEER DOES NOT 7' 3' ON ER___ GUARANTEE THEIR ACCURACY OR THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. CONTRACTOR OBSERVATION / / / 3' ON CENTER PORT (EYP.) SHALL VERIFY THE SIZE. LOCATION AND ELEVATION OF INVERTS OF UTILITIES AND STRUCTURES l • • :. • • .. L WITHIN THE LIMIT OF WORK, PRIOR TO THE START OF CONSTRUCTION. IF ANY DISCREPANCIES ARE DISCOVERED OR FIELD CHANGES REQUIRED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER `\ 6 - PROPOSED NATIVE IMMEDIATELY. BENCHMARK ` 2_3' HIGH RE 1N1N W g392, PROPOSE__ COASTAL GRASSLAND TOP OF CONCRETE �� � N8 6 3�� _ 11 500GALLON HABITAT. 470± S.F. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY COORDINATING THE PROPOSED BOUND. ELEVATION ��ic - SEPTIC TANK CONSTRUCTION ACTIVITIES WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANIES, AND SHALL 17.90 NAD -88 - 5'' OVERDIG & / - i / REMOVAL OF x 6.1 COMPLETE THE PROPOSED WORK WITHOUT ANY INTERRUPTIONS IN SERVICE �� - - / UNSUITABLE O 6 _ _ - MATERIALS PR(5PNdSED_(_E 8. CONTRACTOR IS REQUIRED TO NOTIFY DIG -SAFE, PER MASS. STATUTE CHAPTER 82, SECTION 40 ADS ARC 3 36 LEACHING - P E (32) 40 MIL IMPERMEABLE LONER FROM (888) 344-7233 A MINIMUM OF 72 HOURS PRIOR TO THE START OF CONSTRUCTION. CHAMBERS .(EYP.) EL 5.5 TO EL 8.0 9. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. INSTALLATION OR USE OF A WATER LUNE TO BE CUT CAPPED OWE ��)LANE CAPPED DURING CONSTRUCTION P GARBAGE GRINDER AT THIS PROPERTY IS NOT ALLOWED PER 310 CMR 15.240(4). NEW SLEEVED UNE TO BE INSTALLED STEPS TO ACCESS WALK TO- BUILDING. CONTRACTOR TO CONFIRM WITH OWNER PRIOR TO INSTALLATION 50'��R TO - r LIMIT OF COASTAL DUNE VARIANCES REQUESTED - COASTAL DUNE / TITLE V / NONE / / / / LOCUS INFORMATION CURRENT OWNER: BRIAN k JUDITH BADRIGIAN TITLE REFERENCE CERT. 187053 PLAN REFERENCE LCP 16770-C, LOT 16A ASSESSORS MAP: 15 PARCEL 3 ZONING DISTRICT- R-25 SETBACKS: FRONT VARIES (30% RULE) SIDE 15' REAR N/A MINIMUM LOT SIZE: 25,000 S.F. EX. TOTAL LOT AREA: 8,687± S.F. NITROGEN SENSITIVE ZONE NOT A ZONE II FEMA FLOOD ZONE DISTRICT: ZONE AE (EL 11) AS SHOWN ON FLOOD INSURANCE RATE MAP COMMUNITY -PANEL NO. 25001CO588 J. REVISED JULY 16. 2014 FIELD~ w Na 98059 DESIGN CALCULATIONS DESIGN FLOW 5 BEDROOMS 0 110 GPD/BEDROOM - 550 GPD 550 GPD X 20OX = 1,100 GALLONS USE 1,500 GALLON SEPTIC TANK SIZE OF RFOUIRFD LEACHING FACILITY DESIGN PERC. RATE: <Z MIN/INCH LONG TERM APPL RATE 0.74 GPD/SF 550 GPD + 0.74 GPD/SF - 744 SF SIZE OF LEACHINQ FA I m PROVIDED USE ARC 36 LEACHING CHAMBERS IN FIELD CONFIGURATION IN ACCORDANCE WITH MASSACHUSETTS DEP APPROVAL. EFFECTIVE LOADING RATE IS 4.80 SF/LF OF CHAMBERS 5.0 LF/CHAMBER X 32 CHAMBERS = 160 LF 1.17 LF/COUPLER X 8 COUPLERS = 9 LF 169 LF X 4.80 SF/LF = 811 SF 811 SF X 0.74 GPD/SF - 600 GPD INSTALLED CAPACITY SIZE OF RESERVE AREA USE ARC 36 LEACHING CHAMBERS IN FIELD CONFIGURATION 5.0 LF/CHAMBER X 31 CHAMBERS = 155 LF TOTAL LF = 155 LF X 4.80 SF/LF 744 744 SF X 0.74 GPD/SF - 550 GPD RESERVE CAPACITY 28 SILVER LEAF LANE RADIO LANE POWERS LANE NANTUCKET SOUND LOCUS MAP Locus NOT TO SCALE ;W4.iS9CyG Cd��`t„ BRUIN G. ' c YERGATIAN CIVIL 9 No.46206 40 c SSS/ONALE�G . BRIAN G. YERGATIA DA E PROFESSIONAL ENGINEER SEPTIC SYSTEM UPGRADE 46 POWERS LANE IN WEST YARMOUTH MASSACHUSETTS (BARNSTABLE COUNTY) SITE PLAN APRIL 16, 2015 NO, DATE DESC. 1 6-24-15 REVISE GRADING 2 8/12/15 COASTAL DUNE ADDED Yarmouth Health Department PPVED/�� Ai me Date PREPARED FOR: BRIAN BADRIGIAN 89 MOUNT AUBURN ST, UNIT B WATERTOWN, MA 02472 badrigian®msn.com BSC GROUP 349 Route 28, Unit D W. Yarmouth, Massachusetts 02673 508 778 8919 © 2015 BSC Group, Inc. SCALE: 1" = 10' 0 5 10 20 FM FILE: P-/prj/4986600/C'm1/_Drawings/4986600-SEP.dwg DWG. NO: 6271-02 SHEET 1 OF 2 JOB. NO: 4-9866.00