SEPTIC SYSTEM DESIGN
FLOW ESTIMATE
BEDROOMS AT %/D GAL/DAY/BEDROOM-3.JDGAL/DAY
SEPTIC TANK
3 '0-0GAL/DAY x 2 DAYS - GAL
USE:/5Ct!:bALLON SEPTIC TANK
SOIL ABSORPTION SYSTEM "
yY - LA��I w IWI <c�T eAma- )rm q1
S 1 DE AREA: �t �✓-�-�(�► 7Jr V r�� ,1 ' 7 I
`BOTTOM AREA: X 0A> / X
SEPTIC SYSTEM SECTION
/of of 1�60W0AT106.J
rw,
1\
-, CV, 7 r,
_L5QD GAL
SEPTIC TANK
4, "Y vapwo
� im
I
DATE
YYhrmouth Henith Deportment
APP -OVEID,
�7
ane - Daae
I r
HEALTH AGENT
1) The installation shall eornpl with Title V and "Town of Board ot.
I tealth Regulations.
2) The installer shall verify the location of utilities, sewer inverts and septic
components prior to installation and setting base elevations.
3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per foot. The first
two Icet out of the d -box to the i-eaching shall be level.
4) This plan is not to be utilized for property line determination nor any other
purpose other than the proposed system installation.
5) All septic components must meet Title V specifications.
6) Parking shall not be constricted over HI septic components.
7) The property is bounded by property corners and property lines.
8) The property owner shall review design considerations to approve of total
design flow and number of bedrooms to be considered for design. Receipt
of payment for the plan and installation based on the plan shall be deemed
approval of the design flow by the owner.
9) The existing leaching or cesspools shall be pumped and filled with material
per Title V abandonment procedures. Those within the proposed SAS shall
be removed along with contaminated soil and replaced with clean sand per
Title V specs.
10) System components to be 10 feet from water linea Sewer lines crossing the
water line shall be sleeved with 4 inch SCE140 PVC with ends grouted if
applicable. The proposed SAS is being installed below the water service
line. The line is to be sleeved as aforementioned and maintained in place.
11) If a garbage grinder exists it is to be removed and is the responsibility of the
owner to ensure such.
12)The installer is to take caution in excavation around the gas line if such
exists.
13) Tile installer shall verify the location, quantity and elevation of the sewer
lines exiting the dwelling"rior to the installation.
14) This plan is representative only that a system can fit on a property meeting
Title V requirements.
DAVID
O y�
z MASON CMt
140.1066 - ,moi I¢
1
a oilW
"Tb_ -
_—
_ = - `� q-5,1, I9
37 Y iD,Q,?-
SITE AND SEWAGE PLAN
!_OCAT I ON 4
PREPARED FOR: N r)(vgvl'l, Gwe2it)a-
SCALE: '
DAVID B. MASONRa DATE: 0 1
DBC ENVIRONMENTAL DESIGNS
EAST SANDWICH. MA
(508) 833-2177
e io ?v h IV. AV?