Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2016CRAWL BM@T.0.F100.79 87 COVER WITH RISER 6 " BELOW GRADE MPA 92.70 10" TEE SEPTIC SYSTEM PROFILE JUNCTION BOX H2O PUMP CHAMBER (ALL ELECTRICAL 24" CAST IRON 6' X 6.75' WITH A 24" OPENING WATERPROOFED CONNECTIONS TO COVER TO FINISHED GRADE 101.50 BE MADE INSIDE BOX) 24" CAST IRON COVER FINISH GRADE 101.75 (MEDIUM DUTY) �--�� 2" SC PRESSURE PIPE WIWITHTH PRESSURE TO GRADE FITTINGS HOISTING CABLE \. 14" TEE & j FILTER TO BE INSTALLED 1500 GALLON H-10 MONO WATERPROOF SEPTIC TANK 95 96.9 ALARM ON (INLET) _ _ 3" P5.r5" 00 Lc I PUMP \6" OF STONE OR COMPACTED BASE 5' REMOVAL OF A & B SOILS AROUND PRIMARY S.A.S. 00 O 20 40 60 650 GAL WATERPROOF H2O PUMP CHAMBER 00.75 38.65 1 3 " BLEEDER HOLE 91.9 4" PIPE TO BE LEVEL FOR 2' OUT OF D -BOX 100.8 170X\". 100.8 6EH2O 6" OF STONE OR COMPACTED BASE FINISH GRADE 102.00 INSPECTION PORT (10) HIGH CAPACITY INFILTRATORS WITH 2- END CAPS NO STONE - 2.83' X 62.5' TRENCH VENT TOP @ 101.21 5.00' A&B SOIL REMOVAL OTTOM 5.00' EL 99.88 ADJ. WATER V 94.88 EL ZONE A WELL MIW29 2.80 WATER 92.08 EL 1.37' BOTTOM OF 90.75 EL TEST HOLE Yarmouth Health Department APPROVED HEALTH AGENT APPROVAL SURVEYOR: TERRY WARNER 0- T -TERY yGs o ANN WARNER No. 38721 - - C/ vw 17, .z__L Date N M II: LOCATION: PREPARED FOR: TEST HOLE LOGS DATE: 9/28/16 TEST BY. MIKE O'LOUGHLIN WITNESS: AMY VON HONE PERC RATE: < 2 MIN TEST HOLE #1 n" 100.75 EL n" BOTTOM OF PERK 28" PRESOAK 4:10 MIN 31.5" > 2 MIN PER INCH TEST HOLE # 2 100.75 EL 0 20' 2" DATE: OC T 13, 2016 100.58 EI AP LOAMY SAND JOB NUMBER: 12" 10Y 3/2 99.75 EL B W LOAMY SAND 26„ 10Y 6/8 98.58 EL 26" FINE MEDIUM SAND 98.58 EL 1� C 1 2.5Y 8/2 85" MULTICOLOR 10% GRAVEI 93.66 EL C2FINE SAND 2.5Y 7/3 120" 90.75 EL 104" WATER ENCOUNTERED 92.08 EL BOTTOM OF PERK 28" PRESOAK 4:10 MIN 31.5" > 2 MIN PER INCH TEST HOLE # 2 100.75 EL GENERAL NOTES 1. CONTRATOR TO NOTIFY DIGSAFE PRIOR TO EXCAVATION, AND CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE & UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM IS TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 15.00: TITLE V. 3. THIS PLAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. DESIGNER TO INSPECT & CERTIFY OVER -DIG, IF REQUIRED BY PLAN, AND FINAL INSPECTION BEFORE BACKFILL. 5. CONTRACTOR TO PROVIDE 48 HOUR NOTICE FOR ANY REQUIRED INSPEC TIONS. 6. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 7. THE TOP OF ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. 8. IF SOILS ARE FOUND UNSUITABLE OR DIFFERING FROM THOSE FOUND IN SOIL LOG CONTACT DESIGNER AND THE BOARD OF HEALTH. 9. IF AN OVERDIG IS REQUIRED, CLEAN GRANULAR SAND MEETING 310CMR 15.255(3) SHOULD BE USED AS FILL MATERIAL 10. ALL 4" PIPE CONNECTIONS AT SEPTIC TANK AND D -BOX SHALL BE MORTARED IN PLACE. IF USING 18' PLASTIC RISER PIPES, THESE TOO SHALL BE MORTARED IN PLACE. DESIGN DATA EXISTING 2 BEDROOM DWELLING DAILY -FLOW: -MIN. (3)-BT=DROOM "X -110` GPD _ -330 GPD SEPTIC TANK: 330 GAL X 2.5 = 825 GALLON USE: 1500 GALLON H-10 WATERPROOF MONO SEPTIC TANK PUMP CHAMBER: USE 600 GALLON H-20 5' INSIDE DIAMETER WATERPROOF UNI D -BOX: USE H-20 6 -HOLE SOIL ABSORPTION SYSTEM: 2.83' X 62.5' TRENCH CONFIGURA11ON USE HIGH CAPACITY H2O INFILTRATORS - 10 UNITS 330 X .74 = 445.95/7.79 SF/LF = 57.25 LF REQUIRED USE 10 UNITS X 6.25 LF EA = 62.25LF PROVIDED 62.25 LF X 7.79 SF/LF = 484.93 SF X .74 = 358.85 GPD NOTE 1. PUMPOUT AND FILL ONE EXISTING CESSPOOL. 2. A 5' REMOVAL IS REQUIRED TO REMOVE THE A AND B LAYER NOTES: PUMP CHAMBER 1. LIBERTY 4/10 HP SEWER EJECTION PUMP 2. FLOAT TO BE INSTALLED TO BE REACHED FROM MAN -HOLE COVER 3. 3 FLOAT SYSTEM WITH ALARM SUSPENDED OFF A STAINESS STEEL FLOAT BRACKET 4. ELECTRICAL WORK TO BE PERMITED AND COMPLETED BY A LICENSED ELECTRICIAN 5. PUMP MUST BE POWERED BY A CIRCUIT SEPARATE FROM THE CIRCUIT TO THE ALARM. BUOYANCE CALCULATIONS FOR H-20 PUMP CHAMBER & S.T. MONO H-10 11.270 LBS 2.18 H X (10'2" X 6'1-) X 62.4 = 8415.5 LBS. H-20 PUMP CHAMBER = 6,080 LBS. 2.98 H X (2.5' x 3.141) X 62.4 LBS/CUFT =1,461.59 LBS. STORAGE AND DESIGN REQUIREMENTS DESIGN FLOW: 330 GPD (EXISTING 2 BEDROOM DWELLING) 1" OF EFFLUENT OVER BOTTOM OF LEACHING AREA = 62.5' X 2.83' X .083 X 7.48 = 109.81 GALS/INCH 9" BETWEEN PUMP ON AND PUMP OFF 12.23 GALS/INCH X 9" = 110.07 GALS PER CYCLE RESERVE VOLUME PROVIDED = 3.141 X 6.25 X 2.96' = 58.09 C U/FT 58.09 C U.FT. X 7.48 GAL C U.FT. = 434.52 RESERVE GALLONS SEWAGE PLAN ENGINEER: STEPHEN HAS 7 BUNNY CIRCLE t W. YARMOUTH MAs 1 e`..,t'`:: k a is JAMES P. CONNELL TRUST, JOHN D. WEBB, JR. TRUSTEE,L e 0 20' 2" DATE: OC T 13, 2016 100.58 EI AP LOAMY SAND JOB NUMBER: 12„ 10Y 3/2 99.75 EL LOAMY SAND SHEET NUMBER: B W 10Y 6/8 26" 98.58 EL 1� C1 FINE MEDIUM SAND 85" 2.5Y 8/2 93.66 EL C2 FINE SAND 2.5Y 7/3 120" 90.75 EL 104" WATER ENCOUNTERED 92.08 EL GENERAL NOTES 1. CONTRATOR TO NOTIFY DIGSAFE PRIOR TO EXCAVATION, AND CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE & UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM IS TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 15.00: TITLE V. 3. THIS PLAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. DESIGNER TO INSPECT & CERTIFY OVER -DIG, IF REQUIRED BY PLAN, AND FINAL INSPECTION BEFORE BACKFILL. 5. CONTRACTOR TO PROVIDE 48 HOUR NOTICE FOR ANY REQUIRED INSPEC TIONS. 6. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 7. THE TOP OF ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. 8. IF SOILS ARE FOUND UNSUITABLE OR DIFFERING FROM THOSE FOUND IN SOIL LOG CONTACT DESIGNER AND THE BOARD OF HEALTH. 9. IF AN OVERDIG IS REQUIRED, CLEAN GRANULAR SAND MEETING 310CMR 15.255(3) SHOULD BE USED AS FILL MATERIAL 10. ALL 4" PIPE CONNECTIONS AT SEPTIC TANK AND D -BOX SHALL BE MORTARED IN PLACE. IF USING 18' PLASTIC RISER PIPES, THESE TOO SHALL BE MORTARED IN PLACE. DESIGN DATA EXISTING 2 BEDROOM DWELLING DAILY -FLOW: -MIN. (3)-BT=DROOM "X -110` GPD _ -330 GPD SEPTIC TANK: 330 GAL X 2.5 = 825 GALLON USE: 1500 GALLON H-10 WATERPROOF MONO SEPTIC TANK PUMP CHAMBER: USE 600 GALLON H-20 5' INSIDE DIAMETER WATERPROOF UNI D -BOX: USE H-20 6 -HOLE SOIL ABSORPTION SYSTEM: 2.83' X 62.5' TRENCH CONFIGURA11ON USE HIGH CAPACITY H2O INFILTRATORS - 10 UNITS 330 X .74 = 445.95/7.79 SF/LF = 57.25 LF REQUIRED USE 10 UNITS X 6.25 LF EA = 62.25LF PROVIDED 62.25 LF X 7.79 SF/LF = 484.93 SF X .74 = 358.85 GPD NOTE 1. PUMPOUT AND FILL ONE EXISTING CESSPOOL. 2. A 5' REMOVAL IS REQUIRED TO REMOVE THE A AND B LAYER NOTES: PUMP CHAMBER 1. LIBERTY 4/10 HP SEWER EJECTION PUMP 2. FLOAT TO BE INSTALLED TO BE REACHED FROM MAN -HOLE COVER 3. 3 FLOAT SYSTEM WITH ALARM SUSPENDED OFF A STAINESS STEEL FLOAT BRACKET 4. ELECTRICAL WORK TO BE PERMITED AND COMPLETED BY A LICENSED ELECTRICIAN 5. PUMP MUST BE POWERED BY A CIRCUIT SEPARATE FROM THE CIRCUIT TO THE ALARM. BUOYANCE CALCULATIONS FOR H-20 PUMP CHAMBER & S.T. MONO H-10 11.270 LBS 2.18 H X (10'2" X 6'1-) X 62.4 = 8415.5 LBS. H-20 PUMP CHAMBER = 6,080 LBS. 2.98 H X (2.5' x 3.141) X 62.4 LBS/CUFT =1,461.59 LBS. STORAGE AND DESIGN REQUIREMENTS DESIGN FLOW: 330 GPD (EXISTING 2 BEDROOM DWELLING) 1" OF EFFLUENT OVER BOTTOM OF LEACHING AREA = 62.5' X 2.83' X .083 X 7.48 = 109.81 GALS/INCH 9" BETWEEN PUMP ON AND PUMP OFF 12.23 GALS/INCH X 9" = 110.07 GALS PER CYCLE RESERVE VOLUME PROVIDED = 3.141 X 6.25 X 2.96' = 58.09 C U/FT 58.09 C U.FT. X 7.48 GAL C U.FT. = 434.52 RESERVE GALLONS SEWAGE PLAN ENGINEER: STEPHEN HAS 7 BUNNY CIRCLE t W. YARMOUTH MAs 1 e`..,t'`:: k a is JAMES P. CONNELL TRUST, JOHN D. WEBB, JR. TRUSTEE,L e J. O'LOUGHLIN INC. 714 MAIN STREET, YARMOUTH PORT, MA 02675 (508) 362-4942 DRAWN BY: KENNETH JANSSON SCALE: 1" = 20' DATE: OC T 13, 2016 JOB NUMBER: 10-13-16SP REVISION: NOV 23, 2016a SHEET NUMBER: 1 DRW BY KMJ DEC 8, 2016 4 1� MAP: 17 PARCEL: 132 J. O'LOUGHLIN INC. 714 MAIN STREET, YARMOUTH PORT, MA 02675 (508) 362-4942 DRAWN BY: KENNETH JANSSON